NUCLEAR REGULATORY COMMISSION
[Docket No. 40-3453 and License No. SEA-917]
Atlas Corporation
AGENCY: Nuclear Regulatory Commission.
ACTION: Receipt of petition for Director's Decision under 10 CFR 2.206.
-----------------------------------------------------------------------
Notice is hereby given that a request for Hearing and Petition for
Leave to Intervene (Petition) filed by the State of Utah (State) has
been referred by the Atomic Safety and Licensing Board (ASLB) to be
treated as a petition under 10 CFR 2.206.
On August 2, 1988, Atlas Corporation (Atlas), 370 Seventeenth
Street, Suite 3050, Denver, Colorado 80202, submitted an application
for a license amendment to revise its site reclamation plan for uranium
mill tailings at its site near Moab, Utah. On April 4, 1994, notice of
Receipt of Application and notice of opportunity for hearing on the
application were published in the Federal Register. 59 Fed. Reg. 16,665
(1994). On July 13, 1998, the State filed its Petition stating that if
the Petition is found to be untimely that it be treated as a 10 CFR
2.206 petition in accordance with 10 CFR 2.1205(l)(2). The Petition was
filed by Denise Chancellor, Assistant Attorney General on behalf of the
State. By Memorandum and Order dated August 13, 1998, the ASLB
determined that the Petition was inexcusably late and would be treated
as a petition under 10 CFR 2.206 in accordance with 10 CFR
2.1205(l)(2).
In its Petition the State asserts that if Atlas were to proceed
with its reclamation plan as approved by the Nuclear Regulatory
Commission, it would be in violation of 10 CFR Part 40, Appendix A.
More specifically, the State asserts that the rock apron design
(armoring the tailings pile) does not provide `` `reasonable assurance'
against engineering failure at the Atlas Uranium Tailings Site, and,
thus does not satisfy Appendix A.'' As bases for its assertion, Utah
stated that the unpredictability of flood events, erosion, and
vegetation growth along the river banks makes computation of the
probability of river migration extremely difficult and that, therefore,
conservatism should be built into how the tailings pile is armored.
The Petition has been referred to the Director of the Office of
Nuclear Material Safety and Safeguards. As provided by Section 2.206,
appropriate action will be taken on this Petition within a reasonable
time. A copy of the Petition is available for inspection at the
Commission's Public Document Room at 2120 L Street, NW, Washington, DC
20555.
FOR FURTHER INFORMATION CONTACT: Myron Fliegel, Petition Manager,
Telephone (301) 415-6629.
Dated at Rockville, Maryland, this 16th day of October, 1998.
For the Nuclear Regulatory Commission.
Michael F. Weber,
Deputy Director, Division of Waste Management, Office of Nuclear
Material Safety and Safeguards.