99-27615. Notice of Intent To File an Application for a Subsequent License  

  • [Federal Register Volume 64, Number 204 (Friday, October 22, 1999)]
    [Notices]
    [Page 57090]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-27615]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of Intent To File an Application for a Subsequent License
    
    October 18, 1999.
        a. Type of Filing: Notice of Intent to File An Application of a 
    Subsequent License.
        b. Project No.: 7725.
        c. Date Filed: September 30, 1999.
        d. Submitted By: Barton Village, Inc.-current licensee.
        e. Name of Project: Barton Village Hydroelectric Project.
        f. Location: On the Clyde River near the City of Newport, in 
    Orleans County, Vermont.
        g. Filed Pursuant to: Section 15 of the Federal Power Act.
        h. Licensee Contact: Robert Arnold, Barton Village, Inc., P.O. Box 
    519, Barton, VT 05822, (802) 525-4747.
        i. FERC Contact: Tom Dean, thomas,dean@ferc.fed.us, (202) 219-2778.
        j. Effective date of current license: October 1, 1954.
        k. Expiration date of current license: September 30, 2004.
        l. Description of the Project: The project consists of the 
    following existing facilities: (1) a 70-foot-long, 24-foot-high gravity 
    dam; (2) 1.3-foot-high wooden flashboards extending 57 feet across a 
    concrete spillway; (3) a 187-acre reservoir at an elevation of 1,140.7 
    feet msl; (4) a 365-foot-long, 7-foot-diameter penstock; (5) two 100-
    foot-long, 5.5 and 5.8-feet-diameter penstocks leading to; (6) a 
    powerhouse containing two generating units with a total installed 
    capacity of 1,400 kW; (7) two tailraces; and (8) other appurtenances.
        m. Each application for a subsequent license and any competing 
    license applications must be filed with the Commission at least 24 
    months prior to the expiration of the existing license. All 
    applications for license for this project must be filed by September 
    30, 2002.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-27615 Filed 10-21-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/22/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-27615
Pages:
57090-57090 (1 pages)
PDF File:
99-27615.pdf