99-27636. Notice of Intent (NOI) To Prepare a Draft Environmental Impact Report and Supplemental Environmental Impact Statement (EIR/SEIS) for Proposed Modifications to the Guadalupe River Project, Downtown San Jose, CA  

  • [Federal Register Volume 64, Number 204 (Friday, October 22, 1999)]
    [Notices]
    [Pages 57076-57080]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-27636]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    
    Department of the Army; Army Corps of Engineers
    
    
    Notice of Intent (NOI) To Prepare a Draft Environmental Impact 
    Report and Supplemental Environmental Impact Statement (EIR/SEIS) for 
    Proposed Modifications to the Guadalupe River Project, Downtown San 
    Jose, CA
    
    AGENCY: U.S. Army Corps of Engineers (Corps), Sacramento District, DOD.
    
    ACTION: Notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The multiple purpose Guadalupe River Project (Project) is 
    under phased construction in downtown San Jose, California. The Project 
    was authorized by Section 401(b) of WRDA 1986 and amended by the Energy 
    and Water Development Appropriations Act for Fiscal Year 1990 to 
    provide flood protection, environmental protection, and recreation 
    features. Portions of the Project have been completed or are ongoing 
    under existing implementation authorities and environmental approvals. 
    Project modifications are now required to protect species recently 
    listed under the Endangered Species Act and to meet conditions for 
    water quality certification under the Clean Water Act. Project 
    modifications will likely include an underground bypass to convey flood 
    waters around important riparian habitat, and changes to the existing 
    mitigation and monitoring plan. The intent of the Draft EIR/SEIS is to 
    describe and evaluate potential effects of these proposed modifications 
    on environmental resources in the Project area. The integrated Draft 
    EIR/SEIS will include sufficient information for compliance with both 
    the National Environmental Policy Act (NEPA) and the California 
    Environmental Quality Act (CEQA), as well as opportunities for public 
    participation in the planning and decision making process. The lead 
    agencies are the Corps and the Santa Clara Valley Water District (Water 
    District).
    
    DATES: A public scoping period will begin on October 22, 1999 and end 
    on November 24, 1999. Public comment is invited on the proposal to 
    modify the Project, the proposal to prepare the Draft EIR/SEIS, and on 
    the scope of issues to be included in the Draft EIR/SEIS. Please submit 
    any concerns by November 24, 1999 to the person identified below. 
    Scoping meetings are tentatively scheduled for November 9 and 17, 1999 
    in San Jose. Concerned persons and organizations are invited to call or 
    write to be included on the mailing list for these public meetings or 
    to receive other correspondence concerning the proposed action.
         The scoping meeting on November 9 will be 7:00 to 9:30 
    p.m. at the Crown Plaza Hotel, 282 Almaden Boulevard, San Jose, 
    California.
         The scoping meeting on November 17 will be 7:00 to 9:30 
    p.m. at the Santa Clara Valley Water District, 5750 Almaden Expressway, 
    San Jose, California 95118.
    
    FOR FURTHER INFORMATION CONTACT: Nina Bicknese, Environmental 
    Specialist, U.S. Army Corps of Engineers, 1325 J Street, Sacramento, 
    California, 95814-2922, phone : (916) 557-7948, or fax: (916) 557-5138, 
    nbicknese@spk.usace.army.mil.
    
    SUPPLEMENTARY INFORMATION: 
    
    1. Background
    
        The Guadalupe River Flood Control Project is being implemented in 
    phases along the Guadalupe river in downtown San Jose, Santa Clara 
    County, California. The project was authorized by Section 401(b) of 
    WRDA 1986 and amended by the Energy and Water Development 
    Appropriations Act for Fiscal Year 1990 to provide flood protection, 
    environmental protection, and recreation features. Project construction 
    began in 1992. Construction of flood protection elements was stopped in 
    1996 for several reasons. Concerns developed regarding compliance with 
    the conditions of the State Water Quality Certification under Section 
    401 of the Clean Water Act (CWA), the listing of the red-legged frog 
    and
    
    [[Page 57077]]
    
    steelhead salmon under Section 7 of the Endangered Species Act (ESA), 
    and receipt of a notice issued by three environmental groups stating 
    their intent to sue under the citizen suit provision of the CWA. 
    Implementation of mitigation elements have continued under existing 
    approvals and in cooperation with concerned agencies.
        In June 1997, concerned resource agency staff from the U.S. Fish 
    and Wildlife Service (USFWS), California Department of Fish and Game 
    (CDFG), National Marine Fisheries Service (NMFS), and the California 
    State Water Resources Control Board (SWRCB) met with the Corps and the 
    Water District to express their concerns about the then proposed 
    mitigation measures for the project. Resultantly, the following 
    priorities were identified by the resource agencies:
         Redesign the Project to avoid impacts and maximize on-site 
    mitigation
         Maximize on-site revegetation to replace impacted Shaded 
    Riverine Aquatic (SRA) cover
         Provide off-site mitigation to replace impacted SRA cover
         Provide fisheries mitigation
         Provide thermal mitigation
        Twenty-one mitigation issues were identified and options were 
    evaluated. In December 1997, the Corps and the Water District joined 
    with the City of San Jose (City) and the San Jose Redevelopment Agency 
    (SJRA) to initiate a collaborative and facilitated program to resolve 
    mitigation disputes among the resource agencies, project sponsors, and 
    litigants in the threatened 1996 lawsuit.
        In July 1998, this collaborative ratified a Dispute Resolution 
    Memorandum (DRM) which required the Corps and The Water District to 
    reevaluate a portion of the project, referred to as Contracts 3A and 3B 
    reaches, to avoid impacting remaining riparian and aquatic habitat in 
    the those reaches. Concurrently, the Corps determined the environmental 
    impacts associated with the Project's remaining phases could not be 
    adequately mitigated to maintain Project compliance with the ESA and 
    CWA. The Corps concluded that an General Reevaluation Report (GRR) 
    should be developed.
        Since October 1998, the Corps and The Water District (lead 
    agencies) have been further refining objectives and alternatives in 
    coordination with concerned environmental regulatory agencies and the 
    collaborative to develop proposed project modifications to satisfy the 
    CWA and (ESA) concerns.
    
    Study Area Location
    
        The Guadalupe River, located primarily in the City of San Jose, 
    south of San Francisco Bay, drains an area of about 160 square miles 
    into the Bay. The primary project area is located along 2.6 miles of 
    the Guadalupe River in downtown San Jose, between Grant Street, just 
    upstream from Interstate-280, and Interstate-880. In addition, two off-
    site mitigation areas are proposed, one along Reach A downstream of the 
    Project area and the other along lower Guadalupe Creek above its 
    confluence with Alamitos Creek (Figure 1-1).
    
    2. Document Scope
    
        This pending Draft EIR/SEIS was preceded by a series of documents 
    concerning the authorized Project that were prepared and processed in 
    compliance with the National Environmental Policy Act (NEPA) and the 
    California Environmental Quality Act (CEQA). To address the proposed 
    Project modifications, the Corps will produce one document which 
    integrates the combined NEPA and CEQA environmental document with the 
    General Reevaluation Report required by the corps. The purpose of the 
    integrated GRR-EIR/SEIS is to develop and assess a modified recommended 
    plan and to develop and assess alternatives for the remaining project 
    which avoid and mitigate for adverse effects on environmental 
    resources. This document will address new information, alternative 
    plans, potential effects, and benefits and costs related to compliance 
    with conditions for water quality certification and ESA.
        The GRR-EIR/SEIS will describe and evaluate the potential effects 
    of proposed modifications to the Guadalupe River Project (Project) in 
    downtown San Jose. It will support decision making by the Corps and 
    Santa Clara Valley Water District to implement the proposed Project 
    modifications and ensure compliance with the National Environmental 
    Policy Act (NEPA) and California Environmental Quality Act (CEQA). 
    Potential direct and indirect environmental, social, and economic 
    effects of the alternatives will be evaluated, a plan recommended for 
    implementation, and details presented on the Federal and non-Federal 
    participation needed to implement the recommended plan.
    
    3. Development and Evaluation of Alternative Plans for Project 
    Modifications
    
        The following primary objectives were developed by the study team 
    and collaborative members through an iterative process, and were used 
    to develop alternative plans for project modifications.
         Reduce flood damage from the Guadalupe River in downtown 
    San Jose by conveying flood flows up to the estimated 100-year flood 
    event through the project area.
         Avoid and mitigate for potential adverse impacts to fish 
    and wildlife habitat using the opportunities associated with 
    construction of the flood control components, with special emphasis on 
    potential restoration of the remnant chinook salmon and steelhead trout 
    fisheries.
         Be consistent with redevelopment plans adjacent to the 
    Guadalupe River in downtown San Jose through integration with the 
    Guadalupe River Park and Gardens Master Plan and downtown redevelopment 
    plans with preservation of historic and cultural resources.
         Provide recreation elements compatible with local 
    recreation plans and the General Design Memorandum.
         Provide for a minimum, undiverted flow of 1,500 cfs 
    throughout the bypass reach to accommodate fish and wildlife concerns.
         Provide invert stabilization in the bypass reaches where 
    the natural river remains to preserve the existing vegetation and 
    proposed mitigation and to provide fish passage.
         Design the Project so that it will not cause elevated 
    water temperature or other Project impacts which harm anadromous fish 
    species or other beneficial uses during Project construction and over 
    the entire Project life, including the transition period before 
    replacement vegetation matures.
         Design the Project for successful migration of anadromous 
    fish through the Project area, including armored channel invert 
    sections of the Project.
         Replace the same quantity and quality of anadromous fish 
    habitat, including spawning and rearing habitat, as was present prior 
    to Project construction.
    
    4. Evaluation Criteria and Range of Alternatives
    
        Development of alternatives plans was initiated with the goal to 
    consider all feasible measures to achieve the planning objectives plus 
    criteria of effectiveness, efficiency, completeness, acceptability. 
    Equal consideration was given to the objectives of alleviating the 
    flooding problem; avoiding and/or mitigating for potential adverse 
    impacts to fish and wildlife habitats; and providing recreation 
    opportunities and public access consistent with local
    
    [[Page 57078]]
    
    redevelopment and recreation master plans in and adjacent to the 
    Guadalupe River in downtown San Jose. These measures were analyzed to 
    determine their applicability and overall feasibility in the study 
    area. Subsequently, the management measures that were considered to be 
    appropriate to address the flooding, environmental, and recreation 
    issues, were assembled into an array of alternative plans for project 
    modifications. These alternatives were progressively screened and 
    refined throughout the planning process until a set of final candidate 
    plans was set as a basis for selection of a recommended plan. The 
    results indicated that only the triple bypass alternatives were able to 
    meet both the hydraulic and environmental mitigation criteria.
    
    5. Alternatives Considered
    
        As part of the planning process, many alternatives were considered 
    prior to the preparation of the General Design Memorandum. Development 
    of alternatives plans for project modification was initiated with the 
    goal to consider all feasible measures to achieve the planning 
    objectives plus criteria of effectiveness, efficiency, completeness, 
    acceptability. Equal consideration was given to the objectives of 
    alleviating the flooding problem; avoiding and/or mitigating for 
    potential adverse impacts to fish and wildlife habitats; and providing 
    recreation opportunity and public access consistent with local 
    redevelopment and recreation master plans in and adjacent to the 
    Guadalupe River in downtown San Jose. These measures were analyzed to 
    determine their applicability and overall feasibility in the study 
    area. Subsequently, the management measures that were considered to be 
    appropriate to address the flooding, environmental, and recreation 
    issues, were assembled into an array of alternative plans for project 
    modifications.
        While the Draft EIR/SEIS will address an array of alternatives 
    considered, only two feasible alternatives remain for detailed analysis 
    in the document after completion of a rigorous and iterative screening 
    process. Except for the no action alternative, all alternatives were 
    developed to provide the authorized 100-year flood protection. The no 
    action alterative would be to complete mitigation plantings for 
    Contracts 1, 2, and 3C reaches under existing approvals, but do no 
    further construction on the Contract 3A and 3B reaches of the 
    authorized project. The ``cured'' alternative would be to add 
    additional mitigation to the authorized project to meet all concerns, 
    but it is not implementable because there is insufficient area for all 
    required mitigation. Channel widening and upstream detention 
    alternatives were found to be engineeringly and/or economically 
    infeasible. A number of bypass systems were evaluated in order to leave 
    as much of the natural stream channel as possible, minimize impacts on 
    riparian resources, and provide adequate environmental mitigation. The 
    final two alternatives to be included in detail in the Draft EIS/SEIS 
    are the no action and the underground bypass system alternative with 
    three conduits, plus inlet and outlet structures, low flow channel, and 
    mitigation measures.
    
    6. Proposed Action
    
        The Bypass System Alternative has been proposed to avoid or 
    minimize impacts on riparian resources and protected fish and wildlife 
    species that occur within the Contracts 3A and 3B reach of the 
    Guadalupe River. Specially, this alternative would reduce the amount of 
    riparian vegetation and SRA cover that would be affected while meeting 
    the purpose of providing 100-year flood protection to downtown San Jose 
    and vicinity. Project modifications include a bypass system, bank and 
    invert armoring, and gradient control structures.
        To reduce flooding, the bypass system would route flood flows from 
    the natural river channel into the underground structures and 
    discharges further downstream where there is greater channel capacity 
    to pass flood flows. The underground bypass system will have three 
    independent conduits with different inlet and outlet locations. Inlets 
    for two of the structures will be located on the Guadalupe River 
    upstream of the West Santa Clara Street bridge, and the inlet for the 
    third structure will be located on the Guadalupe River downstream of 
    the confluence with Los Gatos Creek. The outlets for two of the 
    structures will be located on the Guadalupe River upstream of the 
    Coleman Avenue Bridge. The third outlet will be constructed on the 
    Guadalupe River downstream of the Coleman Avenue bridge.
        Although the underground bypass minimizes effect on vegetation by 
    eliminating most of the bank armoring originally proposed for this 
    section of the river under the Project, some armoring is still required 
    in association with the construction of inlets and outlets. Under the 
    existing Project, most of the river bank and invert in Contracts 3A and 
    3B was proposed to be armored. The proposed bypass system will minimize 
    river bank and invert armoring.
    
    Bank and Invert Armoring
    
        Although the underground bypass minimizes effects on vegetation by 
    eliminating most of the armoring originally proposed under the existing 
    Project for this reach of the river, some armoring is still required, 
    including armoring associated with the inlets described above. The east 
    and west banks and the river invert will be armored for approximately 
    609 feet at the downstream end of Contract 3A (under and upstream of 
    the Coleman Avenue bridge), and for approximately 1,891 feet in 
    Contract 3B (under the Park Avenue bridge to downstream of the West 
    Santa Clara Street bridge). The channel invert in Contract 3B will also 
    be armored for approximately 300 feet downstream of the Los Gatos Creek 
    confluence, where an inlet is proposed. Wherever the natural channel 
    invert is armored, a low-flow channel will be constructed in the 
    armored section to provide fish passage through the area. Additionally, 
    the east bank will be armored from the West Santa Clara Street bridge 
    to approximately 50 feet downstream of the New Julian Street bridge. 
    The extent of channel invert and bank armoring may be less, depending 
    on the final design of the triple bypass system.
    
    Stream Channel Invert Gradient Control Structures
    
        Gradient control structures may be placed in the invert of the 
    stream channel throughout the bypassed section of the river. The 
    purpose of the gradient control structures is to stabilize ongoing bank 
    erosion and channel incision, increase instream cover, and provide 
    improved fish habitat.
    
    Location and Description of Project Compensatory Mitigation Components
    
        Compensatory mitigation components of the Project will be located 
    at onsite and offsite areas. Onsite areas are located in Contracts 1, 
    2, 3A, and 3B reaches an the Woz Way-Park Avenue Bypass Reach. 
    Compensatory mitigation plantings in onsite areas were maximized prior 
    to using offsite areas. Offsite compensatory mitigation areas include 
    Research A (located along the Guadalupe River between Airport Parkway 
    and I-880) and lower Guadalupe Creek (a tributary to the Guadalupe 
    River). Other compensatory measures include protecting or improving 
    riparian vegetation, SRA cover, and anadromous fish habitat (i.e., 
    water temperature, spawning gravel, passage, and fish habitat 
    diversity).
    
    [[Page 57079]]
    
    7. Possible Environmental Effects
    
        Based on the available information collected and analyzed to date, 
    significant effects will be avoided or will be minimized by 
    implementing the environmental commitments specified in the proposed 
    action. The resources for which potential adverse effects were 
    identified include river geomorphology, biological resources, air 
    quality, transportation and traffic, hazardous materials, and cultural 
    resources.
         River Geomorphology. Operation of the Project could result 
    in changes in river geomorphology in the reaches of the Guadalupe River 
    included in the Project. Post-project monitoring would focus on channel 
    incision. If monitoring indicates a substantial increase in incision, 
    measures would be implemented to address this issue, such as 
    constructing additional invert stabilization structures.
         Biological Resources. Construction of the Project would 
    require removal of SRA cover and disturbance of the river channel. 
    These activities could result in adverse effects on fish habitat during 
    and after construction. Anadromous fish evaluated are steelhead, which 
    is listed as threatened under the Endangered Species Act, and chinook 
    salmon. Effects on fish and fish habitat during construction will be 
    minimized by restricting in-water construction to summer low-flow 
    periods, by ensuring that activities that divert flow would not 
    restrict fish passage, and by implementing measures to control spills 
    and erosion. Effects on SRA cover and associated increases in water 
    temperature, loss of spawning gravel, and fish passage would be 
    addressed by onsite and offsite mitigation planting, replacing and 
    maintaining spawning gravels, replacing rearing habitat, and providing 
    for fish passage through armored sections of the Project.
         Air Quality. Earthmoving associated with constructing the 
    Bypass Alternative could result in increased PM10 emissions. This 
    effect would be addressed by implementing the Bay Area Air Quality 
    Management District's feasible control measures for soil removal 
    activities.
         Transportation and Traffic. Project construction could 
    result in a temporary short-term loss in available parking in the 
    Project area. This temporary loss would be offset by providing offsite 
    parking during construction and running a shuttle service to and from 
    the offsite parking lots and an office park being constructed in the 
    Project area.
         Cultural Resources. Unknown cultural resources could be 
    discovered during Project construction. This potential effect will be 
    addressed by monitoring during ground-disturbing activities and 
    evaluating the significance of any cultural resources found during 
    construction.
         Other Resources. Studies to date have concluded that the 
    proposed action (modified project with mitigation commitments) would 
    either not affect certain resource areas or that the effect on these 
    resource areas attributable to the Project would not be considered 
    significant. These resources are land use, recreation, public access, 
    visual resources, agriculture, minerals, population and housing, and 
    public services and utilities. The Draft GRR-EIR/SEIS will describe and 
    evaluate potential effects and will be available for public review and 
    comment.
    
    8. Proposed Scoping Process
    
        a. This Notice of Intent initiates the scoping process whereby the 
    Corps and the Water District will refine the scope of issues to be 
    addressed in the Draft GRR-EIR/SEIS and identify potential significant 
    environmental issues related to the proposed action.
        b. Public comment is invited on the proposal to prepare the Draft 
    GRR-EIR/SEIS and on the scope of issues to be included therein.
        c. The Corps and Water District will consult, local, State and 
    Federal agencies with regulatory or implementation responsibility for, 
    or expertise with, the resources in the area of investigation. These 
    include, but are not limited to, U.S. Fish and Wildlife Service, 
    National Marine Fisheries Service, and U.S. Environmental Protection 
    Agency, the State Historic Preservation Officer, California Department 
    of Fish and Game, California Environmental Protection Agency, State and 
    Regional Water Quality Control Boards, California Department of 
    Transportation; and the City of San Jose and San Jose Redevelopment 
    Agency.
        d. Meetings with interested persons will be held during the scoping 
    period and after release of the Draft GRR-EIR/SEIS. Coordination with 
    Federal and State agencies, Tribal governments, and local governments 
    will occur throughout the entire process as necessary.
        e. In November 1999, scoping workshops will be held in the 
    community to explain the Notice of Intent and the Notice of 
    Preparation, and to solicit suggestions, recommendations, and comments 
    to help refine the issues, measures, and alternatives to be addressed 
    in the Draft GRR-EIR/SEIS. Specific locations, dates, and times of the 
    meeting(s) will be published in local newspaper(s) or other media, and 
    be provided to those persons receiving this Notice and those that may 
    call or write after seeing a published version.
        f. A 45-day public review period will be provided for public review 
    and comment on the Draft GRR-EIR/SEIS. All interested persons should 
    respond to this notice and provide a current address if they wish to be 
    notified of the Draft GRR-EIR/SEIS. A 30-day public review period will 
    be provided for review and comment on the Final GRR-EIR/SEIS.
    
    9. Availability
    
         The Draft GRR-EIR/SEIS is expected to be available for a 
    45-day public review and comment period in early 2000.
         The Final GRR-EIR/SEIS is expected to be available for a 
    30-day review period in late 2000.
    
    10. Commenting
    
        A Draft GRR-EIR/SEIS is expected to be available for public review 
    and comment in early 2000 and a final GRR-EIR/SEIS in late 2000. The 
    comment period on the Draft GRR-EIR/SEIS will be 45 days from the date 
    of availability published in the Federal Register by the Environmental 
    Protection Agency. Comments received in response to this solicitation, 
    including names and addresses of those who comment, will be considered 
    part of the public record on this proposed action and will be available 
    for public inspection. Comments submitted anonymously will be accepted 
    and considered. Please provide any comments to the person identified on 
    the first page of this notice. Pursuant to 7 CFR 1.27(d), any person 
    may request the agency to withhold a submission from the public record 
    by showing how the Freedom of Information (FOIA) permits such 
    confidentiality. Persons requesting such confidentiality should be 
    aware that, under the FOIA, confidentiality may be granted in only very 
    limited circumstances, such as to protect trade secrets. The Corps will 
    inform the requester of the agency's decision regarding the request for 
    confidentiality, and where the request is denied, the agency will 
    return the submission and notify the requester that the comments may be 
    resubmitted with or without the name and address.
    
    11. Coordination With Concerned Agencies
    
        The Corps and The Water District as the lead Federal and State 
    agencies with responsibility to prepare this GRR-EIR/
    
    [[Page 57080]]
    
    SEIS, will cooperate and consult with concerned agencies, the 
    Collaborative, and those on the Executive Committee for this project. 
    The Environmental Protection Agency and Fish and Wildlife Service have 
    regulatory responsibilities that could not efficiently be considered 
    without direct involvement; guidance regarding formal consultation 
    responsibilities under the Endangered Species Act will be provided by a 
    Fish and Wildlife Service specialist who will participate as a member 
    of the interdisciplinary team. Other agencies, local and county 
    governments will also be invited to participate, as appropriate.
    
    12. List of Public and Private Persons/Agencies Notified
    
        A list of persons and agencies notified is available upon request 
    to the person identified on the first page of this notice.
    
    13. Decisions To Be Made and Responsible Officials
    
        The Commander, Sacramento District is the official responsible for 
    compliance with NEPA for actions within the District's boundaries. The 
    Santa Clara Valley Water District Board of Directors is responsible for 
    CEQA compliance for the proposed action. After completion of review, 
    the Chief of Engineers will sign his final report and transmit the 
    report and accompanying documents to the Assistant Secretary of the 
    Army for Civil Works (ASA(CW)). After review, ASA(CW) will transmit the 
    report to the Office of Management and Budget (OMB) requesting its 
    views in relation to the programs of the President. After OMB provides 
    its views, ASA(CW) will sign the record of decision (ROD) and transmit 
    the report to Congress. The responsible officials for respective NEPA 
    and CEQA compliance are: COL Michael Walsh, District Engineer, 
    Sacramento District, U.S. Army Corps of Engineers, 1325 J Street, 
    Sacramento, CA 95814-2922; Mr. Stanley Williams, Santa Clara Valley 
    Water District, 5750 Almaden Expressway, San Jose, CA 95118.
    Gregory D. Showalter,
    Army Federal Register Liaison Officer.
    [FR Doc. 99-27636 Filed 10-21-99; 8:45 am]