    Williams Natural Gas Company; Notice of Request Under Blanket 
    Authorization
    
    October 17, 1996.
        Take notice that on October 10, 1996, Williams Natural Gas Company 
    (Applicant), P.O. Box 3288, Tulsa, Oklahoma 74101, filed in Docket No. 
    CP97-23-000 a request pursuant to 157.205, 157.212 and 157.216 of the 
    Commission's Regulations under the Natural Gas Act for authorization to 
    (1) to relocate and reinstall the Glacier Petroleum Company, Inc. 
    (Glacier) meter setting, and after relocation, (2) to abandon by sale 
    to Glacier approximately 1.56 miles of the Thrall 3-inch lateral 
    pipeline, all located in Greenwood County, Kansas, under blanket 
    certificate issued in Docket No. CP82-479-000,\1\ all as more fully set 
    forth in the request for authorization on file with the Commission and 
    open for public inspection.
    ---------------------------------------------------------------------------
    
        \1\ See, 20 FERC para. 62,592 (1982).
    ---------------------------------------------------------------------------
    
        Applicant proposes to reclaim the existing Glacier meter setting, 
    originally installed in 1940 and replaced in 1986, from Section 28, 
    Township 23 South, Range 10 East, and to reinstall it at the point 
    where the 3-inch Thrall lateral pipeline branches off Applicant's 4-
    inch line in Section 16, Township 23 South, Range 10 East. Relocating 
    the meter setting to Applicant's mainline will make it possible to sell 
    in place to Glacier approximately 1.56 miles of 3-inch pipeline 
    downstream of the relocated meter. Applicant states the 3-inch Thrall 
    line was originally installed in 1940 and certificated in Docket No. G-
    298.
        Applicant states the cost to relocate the Glacier meter setting is 
    estimated to be $4,743. Since the existing meter setting will be 
    reinstalled, any meter setting reclaim costs are included in the cost 
    of construction. There are no reclaim costs associated with the 
    pipeline since it will be sold in place for $10. Applicant states that 
    the projected volume of delivery is not expected to exceed the current 
    delivered volume. Applicant states that this change is not prohibited 
    by its existing tariff and that it has sufficient capacity to 
    accommodate the service proposed herein without determent or 
    disadvantage to its other customers.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefore, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-27103 Filed 10-22-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/23/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-27103
Pages:
54994-54994 (1 pages)
Docket Numbers:
Docket No. CP97-23-000
PDF File:
96-27103.pdf