-
Start Preamble
Concurrent with this notice, the Commission is issuing an order in Chehalis Power Generating, L.P., Docket No. ER05-1056-007 clarifying its policy related to jurisdictional reactive power rate schedules.[1] In that order, the Commission finds that, on a prospective basis, for any jurisdictional reactive power service (including within-the-deadband reactive power service) provided by both new and existing generators, the rates, terms, and conditions for such service must be pursuant to a rate schedule on file with the Commission, even when that rate schedule provides no compensation for such service. As set forth in that order, the Commission directed staff to conduct a workshop, in a generic proceeding, to explore the mechanics of public utilities filing reactive power rate schedules for which there is no compensation.
Take notice that the Commission intends to hold a staff-led workshop open to the public at a time and date to be announced to explore the process for filing reactive power rate schedules for which there is no compensation. A subsequent notice will be issued in this docket setting forth the details of the workshop.
Start SignatureDated: October 17, 2013.
Kimberly D. Bose,
Secretary.
Footnotes
1. Chehalis Power Generating, L.P., 145 FERC ¶ 61,052 (2013).
Back to Citation[FR Doc. 2013-24740 Filed 10-22-13; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 10/23/2013
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2013-24740
- Pages:
- 63176-63176 (1 pages)
- Docket Numbers:
- Docket No. AD14-1-000
- PDF File:
- 2013-24740.pdf