2013-24740. Notice Announcing Workshop; Zero Rate Reactive Power Rate Schedules  

  • Start Preamble

    Concurrent with this notice, the Commission is issuing an order in Chehalis Power Generating, L.P., Docket No. ER05-1056-007 clarifying its policy related to jurisdictional reactive power rate schedules.[1] In that order, the Commission finds that, on a prospective basis, for any jurisdictional reactive power service (including within-the-deadband reactive power service) provided by both new and existing generators, the rates, terms, and conditions for such service must be pursuant to a rate schedule on file with the Commission, even when that rate schedule provides no compensation for such service. As set forth in that order, the Commission directed staff to conduct a workshop, in a generic proceeding, to explore the mechanics of public utilities filing reactive power rate schedules for which there is no compensation.

    Take notice that the Commission intends to hold a staff-led workshop open to the public at a time and date to be announced to explore the process for filing reactive power rate schedules for which there is no compensation. A subsequent notice will be issued in this docket setting forth the details of the workshop.

    Start Signature

    Dated: October 17, 2013.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    Footnotes

    1.  Chehalis Power Generating, L.P., 145 FERC ¶ 61,052 (2013).

    Back to Citation

    [FR Doc. 2013-24740 Filed 10-22-13; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
10/23/2013
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2013-24740
Pages:
63176-63176 (1 pages)
Docket Numbers:
Docket No. AD14-1-000
PDF File:
2013-24740.pdf