96-27230. East Tennessee Natural Gas Company; Notice of Proposed Changes In FERC Gas Tariff
[Federal Register Volume 61, Number 207 (Thursday, October 24, 1996)]
[Notices]
[Pages 55139-55140]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-27230]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. RP97-34-000]
East Tennessee Natural Gas Company; Notice of Proposed Changes In
FERC Gas Tariff
October 18, 1996.
Take notice that on October 11, 1996, East Tennessee natural Gas
Company (East Tennessee), submitted for filing to become part of its
FERC Gas Tariff, Fifth Revised Volume 1, the following revised
[[Page 55140]]
tariff sheets to be effective on December 1, 1996:
Ninth Revised Sheet No. 4
Second Revised Sheet No. 51
Third Revised Sheet No. 52
Second Revised Sheet No. 52A
Second Revised Sheet No. 61
First Revised Sheet No. 102
Second Revised Sheet No. 103
Second Revised Sheet No. 104
Second Revised Sheet No. 105
First Revised Sheet No. 126
First Revised Sheet No. 208
First Revised Sheet No. 216
First Revised Sheet No. 217
First Revised Sheet No. 224
First Revised Sheet No. 225
East Tennessee states that the purpose of this filing is to
implement various service modifications resulting from customer
discussions at and subsequent to its August 6, 1996 Winter Operations
Meeting. The service modifications include elimination of the Daily
Demand Service requirement (for customers that do not have electronic
measuring facilities) and Daily Variance Charges; revision of its
Maximum Allowed Deliveries provisions to provide more flexibility for
excuse of performance events and small customers and to limit Balancing
Agreements' Total Quantity; and increase of the Balancing Alert
penalty.
Any person desiring to be heard or to protest this filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street N.E., Washington, D.C. 20426,
in accordance with 18 CFR 385.211 and 385.214 of the Commission's Rules
and Regulations. All such motions or protests must be filed as provided
in Section 154.210 of the Commission's Regulations. Protests will be
considered by the Commission in determing the appropriate action to be
taken, but will not serve to make protestants parties to this
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of this filing are on file with the Commission and
available for public inspection in the Public Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 96-27230 Filed 10-23-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/24/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-27230
- Pages:
- 55139-55140 (2 pages)
- Docket Numbers:
- Docket No. RP97-34-000
- PDF File:
-
96-27230.pdf