-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Temporary final rule.
SUMMARY:
The Commander, Eighth Coast Guard District, is temporarily changing the regulation governing the Clinton Railroad Drawbridge, Mile 518.0, Upper Mississippi River. From December 15, 2003, until March 15, 2004, the drawbridge shall open on signal if at least 24 hours advance notice is given. This temporary rule is issued to facilitate annual maintenance and repair on the bridge.
DATES:
This temporary rule is effective from 12:01 a.m. December 15, 2003 until 9 a.m. on March 15, 2004.
ADDRESSES:
Documents referred to in this rule are available for inspection or copying at room 2.107f in the Robert A. Young Federal Building at Eighth Coast Guard District, Bridge Branch, 1222 Spruce Street, St. Louis, MO 63103-2832, between 8 a.m. and 4 p.m. Monday through Friday, except Federal holidays. The telephone number is (314) 539-3900, extension 2378. The Bridge Branch maintains the public docket for this rulemaking.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. Roger K. Wiebusch, Bridge Administrator, (314) 539-3900, extension 2378.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Good Cause for Not Publishing an NPRM
We did not publish a notice of proposed rulemaking (NPRM) for this regulation. Under 5 U.S.C. 553(b)(B), the Coast Guard finds that good cause exists for not publishing an NPRM. This rule is being promulgated without an NPRM because the limited effect on vessel traffic makes notice and comment unnecessary. Maintenance on the bridge will not begin until after the closure of Lock 22 on the Mississippi River. After that time, only commercial vessels left in the pool above Lock 22 will be able to transit through the bridge. Both the bridge and lock closure recur at the same time each year, and local vessel operators plan for the closures in advance. Prompt publication of this rule is also necessary to protect the public Start Printed Page 60849from safety hazards associated with conducting maintenance on the bridge.
Background and Purpose
On August 19, 2003, the Union Pacific Railroad Company requested a temporary change to the operation of the Clinton Railroad Drawbridge across the Upper Mississippi River, Mile 518.0 at Clinton, Iowa. Union Pacific Railroad Company requested that 24 hours advance notice be required to open the bridge during the maintenance period. The maintenance is necessary to ensure the continued safe operation of the drawbridge. Advance notice may be given by calling the Clinton Yardmaster's office at (319) 244-3204 at anytime; or (319) 244-3269 weekdays between 7 a.m. and 3:30 p.m.; or Mr. Tomaz Gawronski, office (515) 263-4536 or cell phone (515) 710-6829.
The Clinton Railroad Drawbridge navigation span has a vertical clearance of 18.7 feet above normal pool in the closed to navigation position. Navigation on the waterway consists primarily of commercial tows and recreational watercraft. Presently, the draw opens on signal for passage of river traffic. The Union Pacific Railroad Company requested the drawbridge be permitted to remain closed to navigation from 12:01 a.m., December 15, 2003, until 9 a.m., March 15, 2004 unless 24 hours advance notice is given to open the drawbridge to allow time to make repairs. Winter freezing of the Upper Mississippi River coupled with the closure of Army Corps of Engineer's Lock No. 22 (Mile 301.2 UMR) until 7:30 a.m. March 15, 2004 will reduce any significant navigation demands for the drawspan opening. The Clinton Railroad Drawbridge, Mile 518.0, Upper Mississippi River, is located upstream from Lock 22. Performing maintenance on the bridge during the winter when the number of vessels likely to be impacted is minimal is preferred to restricting vessel traffic during the commercial navigation season.
Regulatory Evaluation
This rule is not a “significant regulatory action” under section 3(f) of Executive Order 12866, Regulatory Planning and Review, and does not require an assessment of potential costs and benefits under section 6(a)(3) of that Order. The Office of Management and Budget has not reviewed it under that Order. It is not “significant” under the regulatory policies and procedures of the Department of Homeland Security (DHS).
Because vessel traffic in the area of Clinton, Iowa will be greatly reduced by winter icing of the Upper Mississippi River and the closure of Lock 22, it is expected that this rule will have minimal economic or budgetary effects on the local community.
Small Entities
Under the Regulatory Flexibility Act (5 U.S.C. 601-612), we have considered whether this rule would have a significant economic impact on a substantial number of small entities. The term “small entities” comprises small businesses, not-for-profit organizations that are independently owned and operated and are not dominant in their fields, and governmental jurisdictions with populations of less than 50,000. This temporary rule will have a negligible impact on vessel traffic. The primary users of the Upper Mississippi River in Clinton, Iowa are commercial towboat operators. With the onset of winter conditions on the Upper Mississippi River coupled with the closure of Army Corps of Engineers' Lock No. 22 (Mile 301.2 UMR) until March 15, 2004, there will be few, if any, significant navigation demands for the drawspan opening. Vessels may still transit through the bridge with 24-hour advanced notification.
The Coast Guard certifies under 5 U.S.C. 605(b) that this rule will not have a significant economic impact on a substantial number of small entities.
Assistance for Small Entities
Under section 213(a) of the Small Business Regulatory Enforcement Fairness Act of 1996 (Pub. L. 104-121), we offered to assist small entities in understanding the rule so that they can better evaluate its effects on them and participate in the rulemaking process. Any individual that qualifies or, believes he or she qualifies as a small entity and requires assistance with the provisions of this rule, may contact Mr. Roger K. Wiebusch, Bridge Administrator, Eighth Coast Guard District, Bridge Branch, at (314) 539-3900, extension 2378.
Small businesses may send comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal regulations to the Small Business and Agriculture Regulatory Enforcement Ombudsman and the Regional Small Business Regulatory Fairness Boards. The Ombudsman evaluates these actions annually and rates each agency's responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888-REF-FAIR (1-888-734-3247).
Collection of Information
This rule contains no new collection-of-information under the Paperwork Reduction Act of 1995 (44 U.S.C. 3501-3520).
Federalism
A rule has implications for federalism under Executive Order 13132, Federalism, if it has a substantial direct effect on State or local governments and would either preempt State law or impose a substantial direct cost of compliance on them. We have analyzed this rule under that Order and have determined that it does not have implications for federalism.
Unfunded Mandates Reform Act
The Unfunded Mandates Reform Act of 1995 (2 U.S.C. 1531-1538) requires Federal agencies to assess the effects of their discretionary regulatory actions. In particular, the Act addresses actions that may result in the expenditure by a State, local or tribal government, in the aggregate, or by the private sector of $100,000,000 or more in any one year. Though this rule will not result in such an expenditure, we do discuss the effects of this rule elsewhere in this preamble.
Taking of Private Property
This rule will not affect a taking of private property or otherwise have taking implications under Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights.
Civil Justice Reform
This rule meets applicable standards in sections 3(a) and 3(b)(2) of Executive Order 12988, Civil Justice Reform, to minimize litigation, eliminate ambiguity, and reduce burden.
Protection of Children
We have analyzed this rule under Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks. This rule is not an economically significant rule and does not concern an environmental risk to health or risk to safety that may disproportionately affect children.
Indian Tribal Governments
This rule does not have tribal implications under Executive Order 13175, Consultation and Coordination with Indian Tribal Governments, because it would not have a substantial direct effect on one or more Indian tribes, on the relationship between the Federal Government and Indian tribes, or on the distribution of power and Start Printed Page 60850responsibilities between the Federal Government and Indian tribes.
Energy Effects
We have analyzed this rule under Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use. We have determined that it is not a “significant energy action” under that order because it is not a “significant regulatory action” under Executive Order 12866 and is not likely to have a significant adverse effect on the supply, distribution, or use of energy. It has not been designated by the Administrator of the Office of Information and Regulatory Affairs as a significant energy action. Therefore, it does not require a Statement of Energy Effects under Executive Order 13211.
Environment
We have analyzed this rule under Commandant Instruction M16475.1D, which guides the Coast Guard in complying with the National Environmental Policy Act of 1969 (NEPA) (42 U.S.C. 4321-4370f), and have concluded that there are no factors in this case that would limit the use of a categorical exclusion under section 2.B.2 of the Instruction. Therefore, this rule is categorically excluded, under figure 2-1, paragraph 32(e), of the Instruction, from further documentation.
A final “Categorial Exclusion Determination” is available in the docket where indicated under ADDRESSES.
Start List of SubjectsList of Subjects in 33 CFR Part 117
- Bridges
Regulations
For the reasons set out in the preamble, the Coast Guard is amending Part 117 of Title 33, Code of Federal Regulations, as follows:
Start PartPART 117—DRAWBRIDGE OPERATION REGULATIONS
End Part Start Amendment Part1. The authority citation for part 117 continues to read as follows:
End Amendment Part Start Amendment Part2. From 12:01 a.m. on December 15, 2003, through 9 a.m. on March 15, 2004, § 117.T409 is added to read as follows:
End Amendment PartUpper Mississippi River.Clinton Railroad Drawbridge, Mile 518.0, Upper Mississippi River. From 12:01 a.m., December 15, 2003 through 9 a.m., March 15, 2004, the drawspan requires 24 hours advance notice for bridge operation. Bridge opening requests must be made 24 hours in advance by calling Clinton Yardmaster's office at (319) 244-3204 at anytime; or (319) 244-3269 weekdays between 7 a.m. and 3:30 p.m.; or Mr. Tomaz Gawronski, office (515) 263-4536 or cell phone (515) 710-6829.
Dated: September 22, 2003.
R.F. Duncan,
Rear Admiral, U. S. Coast Guard, Commander, Eighth Coast Guard District.
[FR Doc. 03-26866 Filed 10-23-03; 8:45 am]
BILLING CODE 4910-15-P
Document Information
- Effective Date:
- 12/15/2003
- Published:
- 10/24/2003
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Temporary final rule.
- Document Number:
- 03-26866
- Dates:
- This temporary rule is effective from 12:01 a.m. December 15, 2003 until 9 a.m. on March 15, 2004.
- Pages:
- 60848-60850 (3 pages)
- Docket Numbers:
- CGD08-03-035
- RINs:
- 1625-AA09: Drawbridge Regulations
- RIN Links:
- https://www.federalregister.gov/regulations/1625-AA09/drawbridge-regulations
- Topics:
- Bridges
- PDF File:
- 03-26866.pdf
- CFR: (1)
- 33 CFR 117.T409