2012-26133. Don W. Gilbert Hydro Power, LLC; Notice of Application Accepted for Filing With the Commission; Intent To Waive Scoping; Soliciting Motions To Intervene and Protests; Ready for Environmental Analysis; and Soliciting Comments, Terms and ...  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

    a. Type of Application: Original Minor License.

    b. Project No.: 14367-001.

    c. Date filed: May 30, 2012.

    d. Applicant: Don W. Gilbert Hydro Power, LLC.

    e. Name of Project: Gilbert Hydroelectric Project.

    f. Location: The project would utilize unnamed springs near the Bear River, eight miles southwest of Grace, Caribou County, Idaho. The project would not occupy any federal lands.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r). (2006).

    h. Applicant Contact: Don W. Gilbert and DeAnn G. Somonich, Don W. Gilbert Hydro Power, LLC, 1805 Grace Power Plant Road, Grace, Idaho 83241. Phone: (801) 725-1754.

    i. FERC Contact: Kelly Wolcott, (202) 502-6480 or kelly.wolcott@ferc.gov.

    j. Deadline for filing motions to intervene and protests, requests for cooperating agency status, comments, terms and conditions, recommendations, and prescriptions: 60 days from the issuance date of this notice; reply comments are due 105 days from the issuance date of this notice.

    All documents may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE., Washington, DC 20426.

    The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

    k. This application has been accepted for filing and is now ready for environmental analysis.

    l. The Gilbert Project would consist of the following new features: (1) A 8-foot-long, 3-foot-wide, 3-foot-deep drop inlet structure; (2) a 2-foot-diameter, 700-foot-long partially buried steel or plastic penstock; (3) a powerhouse containing two 45-kilowatt (kW) turbine/generator units for a total installed capacity of 90 kW; (4) a tailrace to convey flows from the powerhouse to the Bear River; (5) a 150-foot-long, 480-kilovolt transmission line; and (6) appurtenant facilities. The project is estimated to generate an average of 550 megawatthours annually. The project would be located on lands owned by the applicant.

    m. Due to the applicant's close coordination with federal and state agencies during the preparation of the application, completed studies, and agency comments, we intend to waive scoping. Based on a review of the application, resource agency consultation letters, and comments filed to date, Commission staff intends to prepare a single environmental assessment (EA). Commission staff determined that the issues that need to be addressed in its EA have been adequately identified during the pre-filing period, which included a public meeting and site visit, and no new issues are likely to be identified through additional scoping. The EA will consider assessing the potential effects of project construction and operation on geology and soils, aquatic, terrestrial, threatened and endangered species, and cultural and historic resources.

    n. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A copy is also available for inspection and reproduction at the address in item h above.

    Register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

    o. Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified intervention deadline date, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified intervention deadline date. Applications for preliminary permits will not be accepted in response to this notice.

    A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an Start Printed Page 64974unequivocal statement of intent to submit a development application. A notice of intent must be served on the applicant(s) named in this public notice.

    Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    All filings must (1) Bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “NOTICE OF INTENT TO FILE COMPETING APPLICATION,” “COMPETING APPLICATION,” “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    o. A license applicant must file no later than 60 days following the date of issuance of this notice: (1) A copy of the water quality certification; (2) a copy of the request for certification, including proof of the date on which the certifying agency received the request; or (3) evidence of waiver of water quality certification.

    p. Procedural schedule: We intend to accept the consultation that has occurred on this project during the pre-filing period as satisfying our requirements for the standard three-stage consultation process under 18 CFR 4.38 and for the National Environmental Policy Act scoping and the application will be processed according to the following procedural schedule. Revisions to the schedule may be made as appropriate.

    MilestoneTarget date
    Comments, recommendations, and terms and conditions dueDecember 17, 2012.
    Reply comments dueJanuary 30, 2013.
    Notice of the availability of the EAApril 15, 2013.
    Start Signature

    Dated: October 17, 2012.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2012-26133 Filed 10-23-12; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Comments Received:
0 Comments
Published:
10/24/2012
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2012-26133
Pages:
64973-64974 (2 pages)
Docket Numbers:
Project No. 14367-001
PDF File:
2012-26133.pdf