96-27380. Natural Gas Pipeline Company of America; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 208 (Friday, October 25, 1996)]
[Notices]
[Pages 55282-55283]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-27380]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP97-41-000]
Natural Gas Pipeline Company of America; Notice of Request Under
Blanket Authorization
October 21, 1996.
Take notice that on October 17, 1996, Natural Gas Pipeline Company
of America (Natural), 701 East 22nd Street, Lombard, Illinois 60148,
filed in Docket No. CP97-41-000 a request pursuant to Sections 157.205
and 157.211 of the Commission's Regulations under the Natural Gas Act
(18 CFR 157.205, 157.211) for authorization to operate an existing
receipt/delivery point in Ford County, Kansas, and to construct and
operate approximately 400 feet of twelve-inch lateral to connect the
existing point to a twelve-inch bi-directional meter to be constructed
by the end-user, under Natural's blanket certificate issued in Docket
No. CP82-
[[Page 55283]]
402-000 pursuant to Section 7 of the Natural Gas Act, all as more fully
set forth in the request that is on file with the Commission and open
to public inspection.
Specifically Natural proposes to operate an existing point to both
deliver and receive gas from MidContinent Market Center, Inc., (MCMC),
a Hinshaw pipeline, and to construct and operate the 400-feet lateral
to a new twelve-inch bi-directional meter to be constructed by MCMC,
for the purpose of providing Part 284 transportation service.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene of notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 96-27380 Filed 10-24-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/25/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-27380
- Pages:
- 55282-55283 (2 pages)
- Docket Numbers:
- Docket No. CP97-41-000
- PDF File:
-
96-27380.pdf