96-27380. Natural Gas Pipeline Company of America; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 208 (Friday, October 25, 1996)]
    [Notices]
    [Pages 55282-55283]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-27380]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-41-000]
    
    
    Natural Gas Pipeline Company of America; Notice of Request Under 
    Blanket Authorization
    
    October 21, 1996.
        Take notice that on October 17, 1996, Natural Gas Pipeline Company 
    of America (Natural), 701 East 22nd Street, Lombard, Illinois 60148, 
    filed in Docket No. CP97-41-000 a request pursuant to Sections 157.205 
    and 157.211 of the Commission's Regulations under the Natural Gas Act 
    (18 CFR 157.205, 157.211) for authorization to operate an existing 
    receipt/delivery point in Ford County, Kansas, and to construct and 
    operate approximately 400 feet of twelve-inch lateral to connect the 
    existing point to a twelve-inch bi-directional meter to be constructed 
    by the end-user, under Natural's blanket certificate issued in Docket 
    No. CP82-
    
    [[Page 55283]]
    
    402-000 pursuant to Section 7 of the Natural Gas Act, all as more fully 
    set forth in the request that is on file with the Commission and open 
    to public inspection.
        Specifically Natural proposes to operate an existing point to both 
    deliver and receive gas from MidContinent Market Center, Inc., (MCMC), 
    a Hinshaw pipeline, and to construct and operate the 400-feet lateral 
    to a new twelve-inch bi-directional meter to be constructed by MCMC, 
    for the purpose of providing Part 284 transportation service.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene of notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-27380 Filed 10-24-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/25/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-27380
Pages:
55282-55283 (2 pages)
Docket Numbers:
Docket No. CP97-41-000
PDF File:
96-27380.pdf