96-27475. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 61, Number 208 (Friday, October 25, 1996)]
    [Notices]
    [Pages 55294-55295]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-27475]
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5474-3]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared October 7, 1996 through 
    October 11, 1996 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 564-7167. An explanation of the ratings assigned to draft 
    environmental impact statements (EISs) was published in FR dated April 
    5, 1996 (61 FR 15251).
    
    Draft EISs
    
    ERP No. D-AFS-K65186-NV Rating EC2, Spring Mountains National 
    Recreation Area General Management Plan, Toiyabe National Forest Land 
    and Resource Management Plan, Amendment, Implementation, Clark and Nye 
    Counties, NV.
    
        Summary: EPA requested that these issues be further addressed in 
    the Final document.
    
    ERP No. D-AFS-L65269-OR Rating EC2, Augusta Timber Sale, 
    Implementation, Willamette National Forest, Blue River Ranger District, 
    Willamette Meridian, Blue River, Lane County, OR.
    
        Summary: EPA expressed environmental concerns based on water 
    quality and air quality aspects of the project area.
    
    ERP No. D-COE-E30037-FL Rating EC2, Brevard County Shore Protection 
    Study, Implementation, Beach Restoration Project, Brevard County, FL.
    
        Summary: EPA expressed environmental concerns regarding the long-
    term consequences of inundating hard-bottom habitat as well as how this 
    action meshes with other, similar anticipated beach nourishment 
    projects. The additional information derived from the mitigation and 
    subsequent monitoring plan will be necessary to determine how this 
    project fits into the larger issue of the environmental consequences of 
    proposed shoreline protection.
    
    ERP No. D-COE-K81024-CA Rating EC2, US Food and Drug Administration 
    Laboratory, Land Acquisition, Construction and Operation on the North 
    Campus Area at the University of California, Irvine, Orange County, CA.
    
        Summary: EPA expressed environmental concerns regarding energy 
    efficency, water conservation and pollution prevention. EPA also 
    requested addition information regarding air quality and applicable 
    federal hazardous waste requirements.
    ERP No. D-FHW-L40199-WA Rating EC2, WA-509 Extension/South Access Road 
    Corridor Project, Construction, Funding and Possible COE Section 404 
    Permit, the Cities of SeaTac, Des Moines, Kent and Federal Way, King 
    County, WA.
    
        Summary: EPA expressed environmental concerns regarding air
    
    [[Page 55295]]
    
    quality, water quality, wetlands and noise issues.
    ERP No. D-NOA-G39030-TX Rating LO, Texas Combined Coastal Management 
    Program, Implementation, Federal Approval, Gulf of Mexico, TX.
    
        Summary: EPA had no objection to the selection of the preferred 
    alternative described in the draft EIS.
    
    ERP No. DS-VAD-G99005-OK Rating LO, Oklahoma City Area National 
    Cemetery Construction and Operation, Updated Information on a New 
    Potential Site, Fort Sill, Comache County, OK.
    
        Summary: EPA had no objection to the selection of the preferred 
    alternative.
    
    Final EISs
    
    ERP No. F-AFS-G65060-TX Texas National Forests and Grasslands Revised 
    Land and Resource Management Plan, Implementation, several counties, 
    TX.
    
        Summary: EPA had no objection to the selection of the preferred 
    alternative described in the Final EIS.
    
    ERP No. F-AFS-L60101-ID Secesh River Subdivision Access Roads, 
    Implementation, Special-Use-Permit, Idaho County, ID.
    
        Summary: Review of the Final EIS has been completed and the project 
    found to be satisfactory.
    
    ERP No. F-AFS-L65257-ID Beaver/Cedar Land Change Project, 
    Implementation, Clearwater National Forest, North Fork and Palause 
    Ranger Districts, Clearwater and Latah Counties, ID.
    
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
    
    ERP No. F-COE-E32076-NC Cape Fear-Northeast Cape Fear Rivers 
    Comprehensive Study for Deepening of the Wilmington Harbor Ship 
    Channel, Navigation Improvement, New Hanover and Brunswick Counties, 
    NC.
    
        Summary: EPA's previous concerns have been lessened to an 
    acceptable level due to the mitigation measures, therefore EPA has no 
    objection to the action as proposed.
    
    ERP No. F-FHW-K40213-NV Tier 1--FEIS Northern and Western Las Vegas 
    Beltway Establishment, Need for and Location of a Transportation 
    Corridor, Clark County, NV.
    
        Summary: Federal Highway Administration's addressed all of EPA's 
    previous concerns, therefore EPA has no objection to the project as 
    proposed.
    
    ERP No. F-FRC-E05047-GA North Georgia Hydroelectric Project, (FERC. No. 
    2354-018) Issuance of Relicensing, Savannah River Basin, Tallulah, 
    Tugalo and Chattooga Rivers, GA and SC.
    
        Summary: EPA's review found that most project impacts were 
    adequately described. Additional information on sewage/water quality 
    impacts associated with increased recreational activities would have 
    been desirable.
    
    ERP No. F-NPS-K60100-AZ Programmatic EIS--Juan Bautista de Anza 
    National Historic Trail Comprehensive Management Plan, Implementation, 
    several counties, AZ and CA.
    
        Summary: Review of the Final EIS was not deemed necessary. No 
    formal comment letter was sent to the preparing agency.
    
    ERP No. FS-SCS-G36081-TX Attoyac Bayou Watershed, Flood Prevention and 
    Watershed Protection, New Information concerning Installation of a 
    Multiple-purpose Reservoir on the Naconiche Creek Watershed for Flood 
    Prevention and Recreational Storage, Funding, Nacogdoches, Shelby, Rusk 
    and San Augustine Counties, TX.
    
        Summary: EPA had no objection to the selection of the preferred 
    alternative as described in the Final EIS.
    
        Dated: October 22, 1996.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 96-27475 Filed 10-24-96; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
10/25/1996
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
96-27475
Pages:
55294-55295 (2 pages)
Docket Numbers:
ER-FRL-5474-3
PDF File:
96-27475.pdf