99-27761. Addendum to Subagreement Pertaining to State Resident Engineers Between the Nuclear Regulatory Commission and the State of Illinois  

  • [Federal Register Volume 64, Number 205 (Monday, October 25, 1999)]
    [Notices]
    [Pages 57487-57488]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-27761]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    
    Addendum to Subagreement Pertaining to State Resident Engineers 
    Between the Nuclear Regulatory Commission and the State of Illinois
    
    AGENCY: Nuclear Regulatory Commission.
    
    ACTION: Publication of Addendum No. 1 to Subagreement No. 3 Between NRC 
    and the State of Illinois.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Nuclear Regulatory Commission (NRC) and the State of 
    Illinois entered into Subagreement No. 3 on December 18, 1990 (55 FR 
    51973). The Subagreement defined the way in which the NRC and the 
    State, with the assistance of State Resident Engineers, cooperate in 
    planning and conducting inspections of nuclear power plants in Illinois 
    to ensure compliance with NRC regulations. The purpose of Addendum No. 
    1 is to modify Subagreement No. 3 to address inspections at permanently 
    shut down nuclear power plants in Illinois that remain under license by 
    the NRC. The text of Addendum No. 1 between the NRC and the State of 
    Illinois follows.
    
    FOR FURTHER INFORMATION CONTACT: Spiros C. Droggitis, Office of State 
    Programs, telephone (301) 415-2367, e-mail scd@nrc.gov.
    
        Dated at Rockville, Maryland this 19th day of October, 1999.
        For the Nuclear Regulatory Commission.
    Paul H. Lohaus,
    Director Office of State Programs.
    
    Addendum No. 1 to Subagreement No. 3 Pertaining to State Resident 
    Engineers Between the U.S. Nuclear Regulatory Commission and the 
    State of Illinois
    
    I. Purpose
    
        The purpose of this Addendum is to modify Subagreement No. 3 
    pertaining to State Resident Engineers between the U.S. Nuclear 
    Regulatory Commission (NRC) and the State of Illinois (State), 
    hereafter referred to as Subagreement No. 3, to address State 
    inspections at permanently shut down nuclear power plants in Illinois 
    that remain under license by the NRC.
    
    II. Background
    
        A. The NRC and the State entered into Subagreement No. 3 to define 
    the way in which NRC and the State, with the assistance of State 
    Resident Engineers will cooperate in planning and conducting 
    inspections at operating nuclear power plants in Illinois. Subagreement 
    No. 3 provided, among other things, for interaction and cooperation 
    between State Resident Engineers and NRC Resident Inspectors. Since the 
    entry into Subagreement No. 3, ``State Resident Engineers'' as referred 
    to in Subagreement No. 3, have become known as ``State Resident 
    Inspectors.''
        B. Since the entry into Subagreement No. 3, NRC has received notice 
    that a licensed nuclear power plant in Illinois has permanently ceased 
    operations and has begun decommissioning.
        C. It is NRC's practice to, approximately one year after shut down, 
    withdraw its resident inspectors from licensed nuclear power plants 
    that have permanently ceased operations and are undergoing 
    decommissioning and to conduct inspections of such power plants with 
    staff from its Regional offices.
        D. The NRC has requested and the State of Illinois has agreed, in 
    accordance with Section X. of Subagreement 3, to modify the 
    Subagreement to recognize the changed circumstances for licensed power 
    plants that are permanently shut down, are undergoing decommissioning, 
    and are no longer inspected by NRC resident inspectors, and to provide 
    for continued cooperation and coordination with the State of Illinois 
    with regard to inspections at such plants.
    
    III. Modifications
    
        A. Subagreement No. 3 is modified as provided in this Addendum. 
    Subagreement No. 3 shall remain in full and complete effect except as 
    specifically modified in this Addendum. Insofar as any provisions in 
    Subagreement No. 3 are inconsistent with this Addendum, this Addendum 
    shall control for the purposes of decommissioning inspections at 
    permanently shut down commercial nuclear power reactors.
        B. The title to Subagreement No. 3 is modified to read 
    ``SUBAGREEMENT NO. 3 BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND 
    THE STATE OF ILLINOIS PERTAINING TO STATE RESIDENT INSPECTORS AND STATE 
    INSPECTORS FOR DECOMMISSIONING PLANTS.''
    
    [[Page 57488]]
    
        C. Section VI.C.13 of Subagreement No. 3 is modified to read as 
    follows: All written communications with the licensee will be made 
    through NRC. After completing its portion of a safety inspection, the 
    State will document to NRC its inspection's scope, details, and results 
    in a report written in the format described in the NRC Inspection 
    Manual. The NRC will use the information, as appropriate, in 
    preparation of the NRC's final report. The State is responsible for the 
    technical adequacy of State Resident Inspector's or State Inspector's 
    inspection reports.
        D. ``State Resident Engineer'' is modified in Subagreement No. 3 to 
    read ``State Resident Inspector.''
        E. State personnel who conduct decommissioning inspections pursuant 
    to this Addendum and who need not be resident at nuclear power plants 
    shall be referred to as ``State Inspectors.''
        F. After NRC's withdrawal of its resident inspectors from licensed 
    nuclear power plants in Illinois that have permanently ceased 
    operations, State participation in NRC decommissioning inspections at 
    these facilities will be governed by Subagreement 3 and this Addendum. 
    This Addendum will not apply to State inspections conducted pursuant to 
    any authority other than Subagreement No. 3.
        G. State Inspectors will be State Resident Inspectors qualified and 
    certified by the State in accordance with the NRC Inspection Manual, or 
    its equivalent, for the specific inspection function they are to 
    perform.
        H. The State will utilize the NRC's Master Inspection Plan as the 
    basis for proposing State Inspectors' participation in NRC scheduled 
    decommissioning inspections. The State will submit inspection 
    recommendations to the NRC Regional Administrator, Region III (or 
    designee), at least one month prior to the scheduled inspection to 
    allow sufficient time for NRC review and approval.
        I. The State will perform decommissioning safety inspections only 
    in accordance with the inspection plans using applicable procedures in 
    the NRC Inspection Manual.
        J. To facilitate cooperation and efficient use of resources, NRC 
    and State Inspectors will conduct joint team decommissioning 
    inspections under this Addendum. An NRC inspector will lead the team 
    and be in charge of the inspection.
        K. The principal senior management contacts for this Addendum will 
    be the Director, Division of Nuclear Materials Safety, Region III, and 
    the Manager, Office of Nuclear Facility Safety, Illinois Department of 
    Nuclear Safety.
    
        Dated: September 28, 1999.
    
        For the U.S. Nuclear Regulatory Commission.
    Frank J. Miraglia,
    Acting Executive Director for Operations.
        Dated: October 4, 1999.
    
        For the State of Illinois.
    Thomas W. Ortciger,
    Director, Illinois Department of Nuclear Safety.
    [FR Doc. 99-27761 Filed 10-22-99; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
10/25/1999
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Publication of Addendum No. 1 to Subagreement No. 3 Between NRC and the State of Illinois.
Document Number:
99-27761
Pages:
57487-57488 (2 pages)
PDF File:
99-27761.pdf