2010-26823. Tallulah Gas Storage, LLC; Notice of Intent To Prepare an Environmental Assessment for the Proposed Tallulah Gas Storage Project, Request for Comments on Environmental Issues, and Notice of Onsite Environmental Review
-
Start Preamble
October 18, 2010.
The staff of the Federal Energy Regulatory Commission (FERC or Commission) will prepare an environmental assessment (EA) that will discuss the environmental impacts of the Tallulah Gas Storage Project, involving construction and operation of facilities by Tallulah Gas Storage, LLC (TGS) in Madison Parish, Louisiana. This EA will be used by the Commission in its decision-making process to determine whether the project is in the public convenience and necessity.
This notice announces the opening of the scoping process the Commission will use to gather input from the public and interested agencies on the project. Your input will help the Commission staff determine what issues need to be evaluated in the EA. Please note that the scoping period will close on November 17, 2010. Further details on how to submit written comments are provided in the Public Participation section of this notice.
On November 3, 2010, the Office of Energy Projects staff will conduct on onsite environmental review of the project area to gather data for its environmental analysis of the proposed project. Staff will examine the specific pipeline route, leaching plant location, caverns, well locations, and alternative locations filed by TGS. Viewing of this area is anticipated to be from public access points and TGS' right-of-way.
All interested parties are invited to attend but must provide their own transportation. Those attending should meet at the following location and time:
- On November 3, 2010 at 1 p.m. Central Time in the parking area of the TA Travel Center at 224 Highway 65 in Tallulah, Louisiana at Exit 171 of Interstate-20. Meet by the company truck with the “Tallulah Gas Storage” sign.
This notice is being sent to the Commission's current environmental mailing list for this project. State and local government representatives are asked to notify their constituents of this project and encourage them to comment on their areas of concern.
If you are a landowner receiving this notice, you may be contacted by a storage company representative about the acquisition of an easement to construct, operate, and maintain the proposed facilities. The company would seek to negotiate a mutually acceptable agreement. However, if the project is approved by the Commission, that approval conveys with it the right of eminent domain. Therefore, if easement negotiations fail to produce an agreement, the company could initiate condemnation proceedings where compensation would be determined in accordance with State or Federal law.
A fact sheet prepared by the FERC entitled “An Interstate Natural Gas Facility On My Land? What Do I Need To Know?” was attached to the project notice TGS provided to landowners. This fact sheet addresses a number of typically-asked questions, including the use of eminent domain and how to participate in the Commission's proceedings. It is also available for viewing on the FERC Web site (http://www.ferc.gov).
Summary of the Proposed Project
TGS proposes to construct a new natural gas storage facility within a geologic salt dome in Madison Parish, Louisiana. The Tallulah Gas Storage Project would include three salt dome storage caverns, each with a capacity of 11.4 billion cubic feet (Bcf), for a total facility capacity of 34.2 Bcf. According to TGS, its project would provide storage services through interconnections with four nearby interstate natural gas transmission pipelines.
The Tallulah Gas Storage Project would consist of the following facilities:
- Three storage caverns;
- Dual 3.29-mile-long, 24-inch-diameter bidirectional natural gas pipelines;
- One 28,410-horsepower compressor station;
- A leaching plant;
- 14 salt water disposal wells, 3 raw water supply wells, and 1 observation well;
- Other appurtenant water and brine disposal pipelines; and
- 4.5 miles of nonjurisdictional electric distribution lines and additional electric facilities.
The general location of the project facilities is shown in appendix 1.[1]
Land Requirements for Construction
Construction of the proposed facilities would disturb about 147 acres of land for the storage facility, the pipeline rights-of-way, and additional temporary workspaces. Following construction, about 74 acres would be maintained for permanent operation of the project's facilities; the remaining acreage would be restored and allowed to revert to former uses.
The EA Process
The National Environmental Policy Act (NEPA) requires the Commission to take into account the environmental impacts that could result from an action whenever it considers the issuance of a Start Printed Page 65476Certificate of Public Convenience and Necessity. NEPA also requires us [2] to discover and address concerns the public may have about proposals. This process is referred to as “scoping”. The main goal of the scoping process is to focus the analysis in the EA on the important environmental issues. By this notice, the Commission requests public comments on the scope of the issues to address in the EA. All comments received will be considered during the preparation of the EA.
In the EA, we will discuss impacts that could occur as a result of the construction and operation of the proposed project under these general headings:
- Geology and soils;
- Land use;
- Water resources, fisheries, and wetlands;
- Cultural resources;
- Vegetation and wildlife;
- Air quality and noise;
- Endangered and threatened species; and
- Public safety.
We will also evaluate reasonable alternatives to the proposed project or portions of the project, and make recommendations on how to lessen or avoid impacts on the various resource areas.
Our independent analysis of the issues will be presented in the EA. The EA will be placed in the public record and, depending on the comments received during the scoping process, may be published and distributed to the public. A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission. To ensure your comments are considered, please carefully follow the instructions in the Public Participation section below.
With this notice, we are asking agencies with jurisdiction and/or special expertise with respect to environmental issues to formally cooperate with us in the preparation of the EA. These agencies may choose to participate once they have evaluated the proposal relative to their responsibilities. Agencies that would like to request cooperating agency status should follow the instructions for filing comments provided under the Public Participation section of this notice.
Consultations Under Section 106 of the National Historic Preservation Act
In accordance with the Advisory Council on Historic Preservation's implementing regulations for section 106 of the National Historic Preservation Act, we are using this notice to initiate consultation with the Louisiana State Historic Preservation Office (SHPO), and to solicit its views and those of other government agencies, interested Indian tribes, and the public on the project's potential effects on historic properties.[3] We will define the project-specific Area of Potential Effects (APE) in consultation with the SHPO as the project is further developed. On natural gas facility projects, the APE at a minimum encompasses all areas subject to ground disturbance (examples include construction right-of-way, contractor/pipe storage yards, compressor stations, and access roads). Our EA for this project will document our findings on the impacts on historic properties and summarize the status of consultations under section 106.
Public Participation
You can make a difference by providing us with your specific comments or concerns about the project. Your comments should focus on the potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts.
The more specific your comments, the more useful they will be. To ensure that your comments are timely and properly recorded, please send them so that they will be received in Washington, DC on or before November 17, 2010.
For your convenience, there are three methods which you can use to submit your comments to the Commission. In all instances please reference the project docket number (CP10-494-000) with your submission. The Commission encourages electronic filing of comments and has expert eFiling staff available to assist you at (202) 502-8258 or efiling@ferc.gov.
(1) You may file your comments electronically by using the eComment feature, which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. An eComment is an easy method for interested persons to submit brief, text-only comments on a project;
(2) You may file your comments electronically by using the eFiling feature, which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. With eFiling you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on “eRegister.” You will be asked to select the type of filing you are making. A comment on a particular project is considered a “Comment on a Filing”; or
(3) You may file a paper copy of your comments at the following address: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.
Environmental Mailing List
The environmental mailing list includes Federal, State, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American Tribes; other interested parties; and local libraries and newspapers. This list also includes all affected landowners (as defined in the Commission's regulations) who are potential right-of-way grantors, whose property may be used temporarily for project purposes, or who own homes within certain distances of aboveground facilities, and anyone who submits comments on the project. We will update the environmental mailing list as the analysis proceeds to ensure that we send the information related to this environmental review to all individuals, organizations, and government entities interested in and/or potentially affected by the proposed project.
If the EA is published for distribution, copies will be sent to the environmental mailing list for public review and comment. If you would prefer to receive a paper copy of the document instead of the CD version or would like to remove your name from the mailing list, please return the attached Information Request (appendix 2).
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want to become an “intervenor” which is an official party to the Commission's proceeding. Intervenors play a more formal role in the process and are able to file briefs, appear at hearings, and be heard by the courts if they choose to appeal the Commission's final ruling. An intervenor formally participates in the proceeding by filing a request to intervene. Instructions for becoming an intervenor are included in the User's Guide under the “e-filing” link on the Commission's Web site.Start Printed Page 65477
Additional Information
Additional information about the project is available from the Commission's Office of External Affairs at (866) 208-FERC, or on the FERC Web site at http://www.ferc.gov using the “eLibrary” link. Click on the eLibrary link, click on “General Search” and enter the docket number, excluding the last three digits in the Docket Number field (i.e., CP10-494). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, contact (202) 502-8659. The eLibrary link also provides access to the texts of formal documents issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to http://www.ferc.gov/esubscribenow.htm.
Any public meetings or additional site visits will be posted on the Commission's calendar located at http://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.
Finally, to request additional information on the project or to provide comments directly to the project sponsor, you can contact TGS through its parent company Icon NGS by calling toll free at 1-877-318-3938 or by e-mail at info@icon-ngs.com. Also, TGS has established an Internet Web site at http://www.tallulahgas.com with additional information about the project. In addition, TGS has made information about the project available to the local community by placing the public portion of the its FERC application in the Madison Parish Library located at 403 North Mulberry in Tallulah, Louisiana.
Start SignatureKimberly D. Bose,
Secretary.
Footnotes
1. The appendices referenced in this notice are not being printed in the Federal Register. Copies of appendices were sent to all those receiving this notice in the mail and are available at http://www.ferc.gov using the link called “eLibrary” or from the Commission's Public Reference Room, 888 First Street, NE., Washington, DC 20426, or call (202) 502-8371. For instructions on connecting to eLibrary, refer to the last page of this notice.
Back to Citation2. “We,” “us,” and “our” refer to the environmental staff of the Commission's Office of Energy Projects.
Back to Citation3. The Advisory Council on Historic Preservation's regulations are at Title 36 of the Code of Federal Regulations, Part 800. Historic properties are defined in those regulations as any prehistoric or historic district, site, building, structure, or object included in or eligible for inclusion in the National Register for Historic Places.
Back to Citation[FR Doc. 2010-26823 Filed 10-22-10; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 10/25/2010
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2010-26823
- Pages:
- 65475-65477 (3 pages)
- Docket Numbers:
- Docket No. CP10-494-000
- EOCitation:
- of 2010-10-18
- PDF File:
- 2010-26823.pdf