2019-23325. Georgia Power Company; Notice of Application Accepted for Filing, Soliciting Comments, Motions To Intervene, and Protests  

  • Start Preamble

    Take notice that the following hydroelectric application has been filed with the Federal Energy Regulatory Commission and is available for public inspection:

    a. Type of Application: Non-Project Use of Project lands and Waters—Sand Mine.

    b. Project No.: 2413-126.

    c. Date Filed: August 30, 2019.

    d. Applicant: Georgia Power Company (licensee).

    e. Name of Project: Wallace Pumped Storage Hydroelectric Project.

    f. Location: The proposed non-project sand mine is located in the northern Start Printed Page 57410part of Lake Oconee, the project reservoir, in Greene County, Georgia.

    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.

    h. Applicant Contact: Herbie Johnston, Hydro General Manager, 600 North 18th Street, Bin 16N-8180, Birmingham, AL 35203.

    i. FERC Contact: Michael Calloway at (202) 502-8041 or michael.calloway@ferc.gov.

    j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance of this notice by the Commission. The Commission strongly encourages electronic filing. Please file motions to intervene, protests, and comments using the Commission's eFiling system at http://www.ferc.gov/​docs-filing/​efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/​docs-filing/​ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-2413-126.

    k. Description of Request: The license filed a request to permit a non-project use of project lands and waters to allow River Sand Incorporated to dredge throughout an approximately 2-mile stretch of the upper project reservoir in Greene County, Georgia for the purposes of commercial sand mining. The sorting area will be located on 6 acres of privately-owned land within the project boundary that the licensee has flowage rights over. The mine operator expects the year round operation of the sand mine will extract 5,000 to 25,000 tons of sediment per year. The operation will not be conducted on U.S. Forest Service Land.

    l. Locations of the Application: A copy of the application is available for inspection and reproduction at the Commission's Public Reference Room, located at 888 First Street NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371. This filing may also be viewed on the Commission's website at http://www.ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document. You may also register online at http://www.ferc.gov/​docs-filing/​esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, call (866) 208-3676 or email FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659. A copy is also available for inspection and reproduction at the address in item (h) above.

    m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.

    n. Comments, Protests, or Motions to Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

    o. Filing and Service of Responsive Documents: Any filing must (1) bear in all capital letters the title COMMENTS; PROTEST, or MOTION TO INTERVENE as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). All comments, motions to intervene, or protests should relate to the non-project use application. Agencies may obtain copies of plans directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

    Start Signature

    Dated: October 21, 2019.

    Kimberly D. Bose,

    Secretary.

    End Signature End Preamble

    [FR Doc. 2019-23325 Filed 10-24-19; 8:45 am]

    BILLING CODE 6717-01-P

Document Information

Published:
10/25/2019
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
2019-23325
Pages:
57409-57410 (2 pages)
Docket Numbers:
Project No. 2413-126
PDF File:
2019-23325.pdf