98-28574. Panhandle Eastern Pipe Line Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 63, Number 206 (Monday, October 26, 1998)]
    [Notices]
    [Page 57113]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-28574]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP99-17-000]
    
    
    Panhandle Eastern Pipe Line Company; Notice of Request Under 
    Blanket Authorization
    
    October 20, 1998.
        Take notice that on October 13, 1998, Panhandle Eastern Pipe Line 
    Company (Panhandle), P.O. Box 1642, Houston, Texas 77251-1642, filed in 
    Docket No. CP99-17-000 a request pursuant to Sections 157.205, 157.211 
    and .216 of the Commission's Regulations under the Natural Gas Act (18 
    CFR 157.205, 157.211 and 157.216) for authorization to upgrade the 
    Central Illinois Public Service (CIPSCO) Quincy M&R Station, an 
    existing delivery point located in Adams County, Illinois, under 
    Panhandle's blanket certificate issued in Docket No. CP83-83-000, 
    pursuant to Section 7 of the Natural Gas Act, all as more fully set 
    forth in the request that is on file with the Commission and open to 
    public inspection.
        Panhandle states that it proposes to replace the regulators 
    associated with the existing M&R Station with short lengths of pipe so 
    as to allow an increase in pressure from 90 psig to 240 psig. Panhandle 
    also states the upgrade facilities will enable the above-ground meter 
    runs to deliver natural gas supplies to CIPSCO at a pressure sufficient 
    to accommodate CIPSCO's increased customer pressure requirements, and 
    that the maximum capacity of the Quincy M&R Station will not change as 
    a result of these proposed modifications. Panhandle further states that 
    the proposed upgrade of the Qunicy M&R Station will not increase the 
    existing firm entitlement of CIPSCO under its currently effective 
    service agreements, but will better enable CIPSCO to provide its 
    customers with requested delivery pressures.
        Panhandle states the estimated cost to upgrade the existing 
    facilities is $11,600, and the CIPSCO will reimburse Panhandle for the 
    cost of modification.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the National Gas Act (18 CFR 157.205) a protest 
    to the request. If no protest is filed within the time allowed 
    therefor, the proposed activity shall be deemed to be authorized 
    effective the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-28574 Filed 10-23-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/26/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-28574
Pages:
57113-57113 (1 pages)