98-28574. Panhandle Eastern Pipe Line Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 206 (Monday, October 26, 1998)]
[Notices]
[Page 57113]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-28574]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-17-000]
Panhandle Eastern Pipe Line Company; Notice of Request Under
Blanket Authorization
October 20, 1998.
Take notice that on October 13, 1998, Panhandle Eastern Pipe Line
Company (Panhandle), P.O. Box 1642, Houston, Texas 77251-1642, filed in
Docket No. CP99-17-000 a request pursuant to Sections 157.205, 157.211
and .216 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205, 157.211 and 157.216) for authorization to upgrade the
Central Illinois Public Service (CIPSCO) Quincy M&R Station, an
existing delivery point located in Adams County, Illinois, under
Panhandle's blanket certificate issued in Docket No. CP83-83-000,
pursuant to Section 7 of the Natural Gas Act, all as more fully set
forth in the request that is on file with the Commission and open to
public inspection.
Panhandle states that it proposes to replace the regulators
associated with the existing M&R Station with short lengths of pipe so
as to allow an increase in pressure from 90 psig to 240 psig. Panhandle
also states the upgrade facilities will enable the above-ground meter
runs to deliver natural gas supplies to CIPSCO at a pressure sufficient
to accommodate CIPSCO's increased customer pressure requirements, and
that the maximum capacity of the Quincy M&R Station will not change as
a result of these proposed modifications. Panhandle further states that
the proposed upgrade of the Qunicy M&R Station will not increase the
existing firm entitlement of CIPSCO under its currently effective
service agreements, but will better enable CIPSCO to provide its
customers with requested delivery pressures.
Panhandle states the estimated cost to upgrade the existing
facilities is $11,600, and the CIPSCO will reimburse Panhandle for the
cost of modification.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the National Gas Act (18 CFR 157.205) a protest
to the request. If no protest is filed within the time allowed
therefor, the proposed activity shall be deemed to be authorized
effective the day after the time allowed for filing a protest. If a
protest is filed and not withdrawn within 30 days after the time
allowed for filing a protest, the instant request shall be treated as
an application for authorization pursuant to Section 7 of the Natural
Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-28574 Filed 10-23-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/26/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-28574
- Pages:
- 57113-57113 (1 pages)
- Docket Numbers:
- Docket No. CP99-17-000
- PDF File:
-
98-28574.pdf