E9-25238. Notice of Intent, Pursuant to the Authority in Section 2(h)(7) of the Commodity Exchange Act and Commission Rule 36.3(c)(3), To Undertake a Determination Whether the PJM WH Real Time Peak Daily Contract; PJM WH Real Time Peak Contract; PJM ...
-
Start Preamble
AGENCY:
Commodity Futures Trading Commission.
ACTION:
Notice of action and request for comment.
SUMMARY:
The Commodity Futures Trading Commission (“CFTC” or “Commission”) is undertaking a review to determine whether the PJM [1] WH [2] Real Time Peak Daily (“PDP”) contract; PJM WH Real Time Peak (“PJM”) contract; PJM WH Real Time Off-Peak (“OPJ”) contract; PJM WH Day Ahead LMP [3] Peak Daily (“PDA”) contract; and PJM WH Real Time Off-Peak Daily (“ODP”) contract, offered for trading on the IntercontinentalExchange, Inc. (“ICE”), an exempt commercial market (“ECM”) under Sections 2(h)(3)-(5) of the Commodity Exchange Act (“CEA” or the “Act”), perform significant price discovery functions. Authority for this action is found in Section 2(h)(7) of the CEA and Commission rule 36.3(c) promulgated thereunder. In connection with this evaluation, the Commission invites comment from interested parties.
DATES:
Comments must be received on or before November 10, 2009.
ADDRESSES:
Comments may be submitted by any of the following methods:
- Follow the instructions for submitting comments: Federal eRulemaking Portal: http://www.regulations.gov.
- E-mail: secretary@cftc.gov. Include PJM WH Real Time Peak Daily (PDP) Contract; PJM WH Real Time Peak (PJM) Contract; PJM WH Real Time Off-Peak (OPJ) Contract; PJM WH Day Ahead LMP Peak Daily (PDA) Contract; and/or PJM WH Real Time Off-Peak Daily (ODP) Contract in the subject line of the message, depending on the subject contract(s) to which the comments apply.
- Fax: (202) 418-5521.
- Mail: Send to David A. Stawick, Secretary, Commodity Futures Trading Commission, Three Lafayette Centre, 1155 21st Street, NW., Washington, DC 20581.
- Courier: Same as mail above.
All comments received will be posted without change to http://www.CFTC.gov/.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Gregory K. Price, Industry Economist, Division of Market Oversight, Commodity Futures Trading Commission, Three Lafayette Centre, 1155 21st Street, NW., Washington, DC Start Printed Page 5496720581. Telephone: (202) 418-5515. E-mail: gprice@cftc.gov; or Susan Nathan, Senior Special Counsel, Division of Market Oversight, same address. Telephone: (202) 418-5133. E-mail: snathan@cftc.gov.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Introduction
On March 16, 2009, the CFTC promulgated final rules implementing provisions of the CFTC Reauthorization Act of 2008 (“Reauthorization Act”) [4] which subjects ECMs with significant price discovery contracts (“SPDCs”) to self-regulatory and reporting requirements, as well as certain Commission oversight authorities, with respect to those contracts. Among other things, these rules and rule amendments revise the information-submission requirements applicable to ECMs, establish procedures and standards by which the Commission will determine whether an ECM contract performs a significant price discovery function, and provide guidance with respect to compliance with nine statutory core principles applicable to ECMs with SPDCs. These rules became effective on April 22, 2009.
In determining whether an ECM's contract is or is not a SPDC, the Commission will consider the contract's material liquidity, price linkage to other contracts, potential for arbitrage with other contracts traded on designated contract markets or derivatives transaction execution facilities, use of the ECM contract's prices to execute or settle other transactions, and other factors.
In order to facilitate the Commission's identification of possible SPDCs, Commission rule 36.3(c)(2) requires that an ECM operating in reliance on section 2(h)(3) promptly notify the Commission and provide supporting information or data concerning any contract: (i) That averaged five trades per day or more over the most recent calendar quarter; and (ii)(A) for which the ECM sells price information regarding the contract to market participants or industry publications; or (B) whose daily closing or settlement prices on 95 percent or more of the days in the most recent quarter were within 2.5 percent of the contemporaneously determined closing, settlement, or other daily price of another agreement.
II. Determination of a SPDC
A. The SPDC Determination Process
Commission rule 36.3(c)(3) establishes the procedures by which the Commission makes and announces its determination on whether a specific ECM contract serves a significant price discovery function. Under those procedures, the Commission will publish a notice in the Federal Register that it intends to undertake a determination as to whether the specified agreement, contract, or transaction performs a significant price discovery function and to receive written data, views, and arguments relevant to its determination from the ECM and other interested persons.[5] After prompt consideration of all relevant information,[6] the Commission will, within a reasonable period of time after the close of the comment period, issue an order explaining its determination. Following the issuance of an order by the Commission that the ECM executes or trades an agreement, contract, or transaction that performs a significant price discovery function, the ECM must demonstrate, with respect to that agreement, contract, or transaction, compliance with the core principles under section 2(h)(7)(C) of the CEA [7] and the applicable provisions of Part 36. If the Commission's order represents the first time it has determined that one of the ECM's contracts performs a significant price discovery function, the ECM must submit a written demonstration of its compliance with the core principles within 90 calendar days of the date of the Commission's order. For each subsequent determination by the Commission that the ECM has an additional SPDC, the ECM must submit a written demonstration of its compliance with the core principles within 30 calendar days of the Commission's order.
B. PJM WH Real Time Peak Daily Contract
The PDP contract is a daily contract that is cash settled based on the arithmetic average of hourly, real-time LMPs during the specified calendar day for the Western Hub, which are published by the PJM Interconnection for all peak hours during a particular date of production. The LMPs are published by PJM Interconnection on its Web site under the heading, “Daily Real-Time LMP Files.” The LMPs are derived from power trades that result in physical delivery. The size of the PDP contract is 800 megawatt hours (“MWh”), and the unit of trading is any multiple of 800 MWh. The PDP contract is listed for up to 38 consecutive calendar days. Based upon a required quarterly notification filed on July 27, 2009 (mandatory under Rule 36.3(c)(2)), the ICE reported that, with respect to its PDP contract, 48,072 separate trades occurred in the second quarter of 2009, resulting in a daily average of 751.1 trades. During the same period, the PDP contract had a total trading volume of 68,586 contracts (which was an average of 1,071.7 contracts per day). As of June 30, 2009, open interest in the PDP contract was 1,856 contracts. It appears that the ICE PDP contract may satisfy the material liquidity and material price reference factors for SPDC determination. With respect to material liquidity, trading in the PDP contract averaged over 1,000 contracts on a daily basis with more than 750 separate transactions each day. In regard to material price reference, while it did not specifically address the power contracts under review, the ECM Study stated that, in general, market participants view the ICE as a price discovery market for certain electricity contracts. Power contracts based on actively-traded hubs are transacted heavily on the ICE's electronic trading platform, with the remainder being completed over-the-counter and potentially submitted for clearing by voice brokers. In addition, the ICE sells its price data to market participants in a number of different packages which vary in terms of the hubs covered, time periods, and whether the data are daily only or historical. For example, the ICE offers “PJM Power End of Day” and “OTC Power End of Day” data packages with access to all price data or just 12, 24, 36, or 48 months of historical data.
C. PJM WH Real Time Peak Contract
The PJM contract is a monthly contract that is cash settled based on the arithmetic average of hourly, real-time LMPs during the specified calendar Start Printed Page 54968month for the Western Hub, which are published by the PJM Interconnection for all peak hours during the month of production. The LMPs are published by PJM Interconnection on its Web site under the heading, “Daily Real-Time LMP Files.” The LMPs are derived from power trades that result in physical delivery. The size of the PJM contract is 800 MWh, and the unit of trading is the contract size multiplied by the number of peak days in the calendar month. The PJM contract is listed for up to 110 consecutive calendar months.
Based upon a required quarterly notification filed on July 27, 2009 (mandatory under Rule 36.3(c)(2)), the ICE reported that, with respect to its PJM contract, 7,990 separate trades occurred in the second quarter of 2009, resulting in a daily average of 124.8 trades. During the same period, the PJM contract had a total trading volume of 268,489 (which was an average of 4,195.1 contracts per day). As of June 30, 2009, open interest in the PJM contract was 318,788 contracts.
It appears that the ICE PJM contract may satisfy the material liquidity and material price reference factors for SPDC determination. With respect to material liquidity, trading in the PJM contract averaged 4,200 contracts on a daily basis with more than 120 separate transactions each day. In addition, the open interest in the subject contract was significant. In regard to material price reference, while it did not specifically address the power contracts under review, the ECM Study stated that, in general, market participants view the ICE as a price discovery market for certain electricity contracts. Power contracts based on actively-traded hubs are transacted heavily on the ICE's electronic trading platform, with the remainder being completed over-the-counter and potentially submitted for clearing by voice brokers. In addition, the ICE sells its price data to market participants in a number of different packages which vary in terms of the hubs covered, time periods, and whether the data are daily only or historical. For example, the ICE offers “PJM Power End of Day” and “OTC Power End of Day” data packages with access to all price data or just 12, 24, 36, or 48 months of historical data.
D. PJM WH Real-Time Off-Peak Contract
The OPJ contract is a monthly contract that is cash settled based on the arithmetic average of hourly, real-time LMPs during the specified calendar month for the Western Hub, which are published by the PJM Interconnection for all off-peak hours during the month of production. The LMPs are published by PJM Interconnection on its Web site under the heading, “Daily Real-Time LMP Files.” The LMPs are derived from power trades that result in physical delivery. The size of the OPJ contract is 50 MWh, and the unit of trading is determined by multiplying the contract size by the number of off-peak days in the calendar month traded. The OPJ contract is listed for up to 86 calendar months with four complete calendar years. Based upon a required quarterly notification filed on July 27, 2009 (mandatory under Rule 36.3(c)(2)), the ICE reported that, with respect to its OPJ contract, 437 separate trades occurred in the second quarter of 2009, resulting in a daily average of 6.8 trades. During the same period, the OPJ contract had a total trading volume of 325,799 contracts (which was an average of 5,090.6 contracts per day). As of June 30, 2009, open interest in the OPJ contract was 2,976,492 contracts.
It appears that the ICE OPJ contract may satisfy the material liquidity and material price reference factors for SPDC determination. With respect to material liquidity, trading in the OPJ contract averaged over 5,000 contracts on a daily basis with more than six separate transactions each day. In addition, the open interest in the subject contract was extremely large. In regard to material price reference, while it did not specifically address the power contracts under review, the ECM Study stated that, in general, market participants view the ICE as a price discovery market for certain electricity contracts. Power contracts based on actively-traded hubs are transacted heavily on the ICE's electronic trading platform, with the remainder being completed over-the-counter and potentially submitted for clearing by voice brokers. In addition, the ICE sells its price data to market participants in a number of different packages which vary in terms of the hubs covered, time periods, and whether the data are daily only or historical. For example, the ICE offers “PJM Power End of Day” and “OTC Power End of Day” data packages with access to all price data or just 12, 24, 36, or 48 months of historical data.
E. PJM WH Day-Ahead LMP Peak Daily Contract
The PDA contract is a daily contract that is cash settled based on the arithmetic average of hourly, day-ahead LMPs during the specified day for the Western Hub, which are published by the PJM Interconnection for all peak hours during a particular date of production. The LMPs are published by PJM Interconnection on its Web site under the heading, “Day-Ahead LMP Data.” The LMPs are derived from power trades that result in physical delivery. The size of the PDA contract is 800 MWh. The PDA contract is listed for up to 38 consecutive calendar days.
Based upon a required quarterly notification filed on July 27, 2009 (mandatory under Rule 36.3(c)(2)), the ICE reported that, with respect to its PDA contract, 1,063 separate trades occurred in the second quarter of 2009, resulting in a daily average of 16.6 trades. During the same period, the PDA contract had a total trading volume of 1,435 contracts (which was an average of 22.4 contracts per day). As of June 30, 2009, open interest in the PDA contract was 75 contracts.
It appears that the ICE PDA contract may satisfy the material liquidity and material price reference factors for SPDC determination. With respect to material liquidity, trading in the PDA contract averaged over 20 contracts on a daily basis with more than 15 separate transactions each day. In regard to material price reference, while it did not specifically address the power contracts under review, the ECM Study stated that, in general, market participants view the ICE as a price discovery market for certain electricity contracts. Power contracts based on actively-traded hubs are transacted heavily on the ICE's electronic trading platform, with the remainder being completed over-the-counter and potentially submitted for clearing by voice brokers. In addition, the ICE sells its price data to market participants in a number of different packages which vary in terms of the hubs covered, time periods, and whether the data are daily only or historical. For example, the ICE offers “PJM Power End of Day” and “OTC Power End of Day” data packages with access to all price data or just 12, 24, 36, or 48 months of historical data.
F. PJM WH Real-Time Off-Peak Daily Contract
The ODP contract is a daily contract that is cash settled based on the arithmetic average of hourly, real-time LMPs during the specified calendar day for the Western Hub, which are published by the PJM Interconnection for all off-peak hours during the particular date of production. The LMPs are published by PJM Interconnection on its Web site under the heading, “Daily Real-Time LMP Files.” The LMPs are derived from power trades that result in physical delivery. The size of the ODP contract is 50 MWh, and the unit of trading is any multiple of 50 MWh. The ODP contract is listed for up to 38 consecutive calendar days. Based upon a required quarterly notification Start Printed Page 54969filed on July 27, 2009 (mandatory under Rule 36.3(c)(2)), the ICE reported that, with respect to its ODP contract, 723 separate trades occurred in the second quarter of 2009, resulting in a daily average of 11.3 trades. During the same period, the ODP contract had a total trading volume of 7,448 contracts (which was an average of 116.4 contracts per day). As of June 30, 2009, open interest in the ODP contract was 256 contracts.
It appears that the ICE ODP contract may satisfy the material liquidity and material price reference factors for SPDC determination. With respect to material liquidity, trading in the ODP contract averaged over 110 contracts on a daily basis with more than 10 separate transactions each day. In regard to material price reference, while it did not specifically address the power contracts under review, the ECM Study stated that, in general, market participants view the ICE as a price discovery market for certain electricity contracts. Power contracts based on actively-traded hubs are transacted heavily on the ICE's electronic trading platform, with the remainder being completed over-the-counter and potentially submitted for clearing by voice brokers. In addition, the ICE sells its price data to market participants in a number of different packages which vary in terms of the hubs covered, time periods, and whether the data are daily only or historical. For example, the ICE offers “PJM Power End of Day” and “OTC Power End of Day” data packages with access to all price data or just 12, 24, 36, or 48 months of historical data.
III. Request for Comment
In evaluating whether an ECM's agreement, contract, or transaction performs a significant price discovery function, section 2(h)(7) of the CEA directs the Commission to consider, as appropriate, four specific criteria: Price linkage, arbitrage, material price reference, and material liquidity. As it explained in Appendix A to the Part 36 rules,[8] the Commission, in making SPDC determinations, will apply and weigh each factor, as appropriate, to the specific contract and circumstances under consideration.
As part of its evaluation, the Commission will consider the written data, views, and arguments from any ECM that lists the potential SPDC and from any other interested parties. Accordingly, the Commission requests comment on whether the PDP, PJM, OPJ, PDA, and/or ODP contracts perform significant price discovery functions. Commenters' attention is directed particularly to Appendix A of the Commission's Part 36 rules for a detailed discussion of the factors relevant to a SPDC determination. The Commission notes that comments which analyze the contracts in terms of these factors will be especially helpful to the determination process. In order to determine the relevance of comments received, the Commission requests that commenters explain in what capacity are they knowledgeable about the subject contracts. Moreover, because five contracts are included in this notice, it is important that commenters identify to which contract(s) their comments apply.
IV. Related Matters
A. Paperwork Reduction Act
The Paperwork Reduction Act of 1995 (“PRA”) [9] imposes certain requirements on federal agencies, including the Commission, in connection with their conducting or sponsoring any collection of information, as defined by the PRA. Certain provisions of final Commission rule 36.3 impose new regulatory and reporting requirements on ECMs, resulting in information collection requirements within the meaning of the PRA; OMB previously has approved and assigned OMB control number 3038-0060 to this collection of information.
B. Cost-Benefit Analysis
Section 15(a) of the CEA [10] requires the Commission to consider the costs and benefits of its actions before issuing an order under the Act. By its terms, section 15(a) does not require the Commission to quantify the costs and benefits of an order or to determine whether the benefits of the order outweigh its costs; rather, it requires that the Commission “consider” the costs and benefits of its action. Section 15(a) further specifies that the costs and benefits shall be evaluated in light of five broad areas of market and public concern: (1) Protection of market participants and the public; (2) efficiency, competitiveness, and financial integrity of futures markets; (3) price discovery; (4) sound risk management practices; and (5) other public interest considerations.
The bulk of the costs imposed by the requirements of Commission Rule 36.3 relate to significant and increased information-submission and reporting requirements adopted in response to the Reauthorization Act's directive that the Commission take an active role in determining whether contracts listed by ECMs qualify as SPDCs. The enhanced requirements for ECMs will permit the Commission to acquire the information it needs to discharge its newly mandated responsibilities and to ensure that ECMs with SPDCs are identified as entities with the elevated status of registered entity under the CEA and are in compliance with the statutory terms of the core principles of section 2(h)(7)(C) of the Act. The primary benefit to the public is to enable the Commission to discharge its statutory obligation to monitor for the presence of SPDCs and extend its oversight to the trading of SPDCs.
Start SignatureIssued in Washington, DC on October 14, 2009 by the Commission.
David A. Stawick,
Secretary of the Commission.
Footnotes
1. The acronym “PJM” stands for Pennsylvania New Jersey Maryland Interconnection, LLC (“PJM Interconnection”), and signifies the regional electricity transmission organization that coordinates the generation and distribution of electricity in all or parts of 13 states and the District of Columbia.
Back to Citation2. The acronym WH signifies the PJM's Western Hub.
Back to Citation3. The term “LMP” stands for “locational marginal price” and represents the additional cost associated with producing an incremental amount of electricity. LMPs account for generation costs, congestion along the transmission lines, and electricity loss.
Back to Citation4. 74 FR 12178 (Mar. 23, 2009); these rules became effective on April 22, 2009.
Back to Citation5. The Commission may commence this process on its own initiative or on the basis of information provided to it by an ECM pursuant to the notification provisions of Commission rule 36.3(c)(2).
Back to Citation6. Where appropriate, the Commission may choose to interview market participants regarding their impressions of a particular contract. Further, while they may not provide direct evidentiary support with respect to a particular contract, the Commission may rely for background and context on resources such as its October 2007 Report on the Oversight of Trading on Regulated Futures Exchanges and Exempt Commercial Markets (“ECM Study”). http://www.cftc.gov/stellent/groups/public/@newsroom/documents/file/pr5403-07_ecmreport.pdf.
Back to Citation8. 17 CFR 36, Appendix A.
Back to Citation[FR Doc. E9-25238 Filed 10-23-09; 8:45 am]
BILLING CODE 6351-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 10/26/2009
- Department:
- Commodity Futures Trading Commission
- Entry Type:
- Notice
- Action:
- Notice of action and request for comment.
- Document Number:
- E9-25238
- Dates:
- Comments must be received on or before November 10, 2009.
- Pages:
- 54966-54969 (4 pages)
- PDF File:
- e9-25238.pdf