[Federal Register Volume 60, Number 208 (Friday, October 27, 1995)]
[Notices]
[Pages 55020-55021]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26742]
-----------------------------------------------------------------------
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-5230-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General
Information (202) 260-5076 OR (202) 260-5075.
Weekly receipt of Environmental Impact Statements Filed October 16,
1995 Through October 20, 1995 Pursuant to 40 CFR 1506.9.
EIS No. 950472, DRAFT EIS, AFS, CA, Trinity Alps Wilderness Plan,
Implementation, Shasta-Trinity National Forest, Klamath National Forest
and Six Rivers National Forest, Humboldt, Siskiyou and Trinity
Counties, CA, Due: January 26, 1996, Contact: Karyn L. Wood (916) 246-
5222.
EIS No. 950473, DRAFT EIS, FHW, PA, Marshalls Creek Traffic Relief
Study, Construction, Connector between PA-209, Business 209 and PA-402,
COE Section 404 and NPDES Permits, Monroe County, PA, Due: December
[[Page 55021]]
18, 1995, Contact: Manual Mark (717) 782-3461.
EIS No. 950474, DRAFT EIS, COE, KY, TN, Fort Campbell Rail Connector,
Construction between the Government-Owned Line Railroad and CSX Line,
Hopkinsville and Clarkville, Christian Co., KY and Montgomery and
Stewart Counties, TN, Due: December 11, 1995, Contact: William Ray
Haynes (502) 582-6475.
EIS No. 950475, FINAL EIS, DOE, WA, OR, Resource Contingency Program,
Construction and Operation, Site Specific, Hermiston Power Project,
Umattilla County, OR, Due: November 27, 1995, Contact: Rob Diffely
(503) 230-4213.
EIS No. 950476, DRAFT EIS, FRC, OR, Leaburg-Walterville Hydroelectric
(FERC. No. 2496) Project, Issuance of New License (Relicense), Funding
and Land Trust Acquisition, McKenzie River, Lane County, OR, Due:
December 26, 1995, Contact: Edward R. Meyer (202) 208-7998.
EIS No. 950477, DRAFT EIS, AFS, OR, Upper Deschutes Wild and Scenic
River and State Scenic Waterway, Management Plan, Implementation,
Deschutes National Forest, Deschutes County, OR, Due: December 15,
1995, Contact: Mollie Chaudet (503) 383-4769.
EIS No. 950478, FINAL EIS, AFS, MT, Two Joe Timber Sales,
Implementation, Lolo National Forest, Superior Ranger District, St.
Regis River, Mineral County, MT, Due: November 27, 1995, Contact: Terry
Egenhoff (406) 822-4233.
EIS No. 950479, DRAFT EIS, FRC, GA, SC, North Georgia Hydroelectric
Project, (FERC. No. 2354-018) Issuance of Relicensing, Savannah River
Basin, Tallulah, Tugalo and Chattooga Rivers, GA and SC, Due: December
26, 1995, Contact: Joe Davis (202) 219-2865.
EIS No. 950480, DRAFT EIS, FHW, WI, WI-10 Highway Corridor,
Construction between Village of Fremont and WI-45 near Appleton Urban
Area, Funding and COE Section 404 Permit, Winnebago, Outagamic, Waupaca
and Waushara Counties, WI, Due: December 11, 1995, Contact: Johnny M.
Gerbitz (608) 829-7500.
EIS No. 950481, DRAFT EIS, AFS, CA, NV, North Shore Ecosystem
Management Project, Implementation, Lake Tahoe Basin Management Unit,
Washoe and Placer County, CA and NV, Due: December 19, 1995, Contact:
Joe Oden (916) 573-2600.
EIS No. 950482, FINAL EIS, FHW, CA, CA-150/Rincon Creek Two Bridges
Replacement, 1.0 mile east of CA-101 to 1.9 miles east of CA-101,
Funding, Santa Barbara and Ventura Counties, CA, Due: November 27,
1995, Contact: John R. Schultz (916) 498-5867.
EIS No. 950483, FINAL EIS, NRC, UT, Muddy Creek Orderville Watershed
Plan, Offsite Salt and Sediment Damage to Water Quality in the Virgin
River and the Colorado River, Wildlife Habitat and Rangeland
Productivity Enhancements, Approvals and Funding, Kane County, UT, Due:
November 27, 1995, Contact: Philip L. Nelson (801) 524-5050.
EIS No. 950484, DRAFT EIS, BOP, HI, Honolulu, Hawaii Detention
Facility, Construction and Operation, Site Selection, Fort Armstrong,
Ualena Street, Lagoon Drive, Elliott Street, HI, Due: December 11,
1995, Contact: David J. Dorworth (202) 514-6470.
EIS No. 950485, DRAFT EIS, COE, LA, Programmatic EIS--Marsh Management
Project, Hydrologic Manipulation, COE Section 10 and 404 Permit
Issuance, Coastal Wetland of Louisiana a part of the Coastal Wetlands
Planning, Protection and Restoration Act (CWPPRA) River Basins, LA,
Due: December 26, 1995, Contact: Robert Bonsenberg (504) 862-2522.
EIS No. 950486, FINAL EIS, DOE, TX, ID, NV, SC, TN, Programmatic EIS--
Tritium Supply and Recycling Facilities Siting, Construction and
Operation, Implementation, Idaho National Engineering Laboratory, ID;
Nevada Test Site, NV; Oak Ridge Reservation, TN; Pantex Plant, TX or
Savannah River Site, SC, Due: November 27, 1995, Contact: Stephen M.
Sohinki (202) 586-0838.
EIS No. 950487, DRAFT EIS, DOE, TN, SC, VA, Disposition of Surplus
Weapons-Usable Highly Enriched Uranium (HEU) to Low Enriched Uranium
(LEU), Site Selection, Y-12 Plant Oak Ridge, TN; Savannah River Site,
Aiken, SC; Babcock & Wilcox Naval Nuclear Fuel Division, Lynchburg, VA
and Nuclear Fuel Services Plant, Erwin, TN, Due: December 11, 1995,
Contact: J. David Nulton (202) 586-4513.
EIS No. 950488, DRAFT EIS, SFW, TX, Balcones Canyonlands Conservation
Plan, Issuance of a Permit to Allow Incidental Take of Gold-Cheeked
Warbler, Black-capped Vireo and Six Karst Invertebrates, Travis County,
TX, Due: December 11, 1995, Contact: Joseph E. Johnston (512) 490-0063.
EIS No. 950489, DRAFT EIS, COE, IN, Indiana Harbor and Canal Dredging
and Confined Disposal Facility, Construction and Operation,
Comprehensive Management Plan, East Chicago, Lake County, ID, Due:
February 01, 1996, Contact: Keith Ryder (312) 353-7795.
Dated: October 24, 1995.
William D. Dickerson,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 95-26742 Filed 10-26-95; 8:45 am]
BILLING CODE 6560-50-U