DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application
October 21, 1997.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Major New License.
b. Project No.: 2778-005.
c. Date filed: May 29, 1997.
d. Applicant: Idaho Power Company.
e. Name of Project: Shoshone Falls.
f. Location: On the Snake River, at river mile 615 from the
confluence with the Columbia River in Jerome and Twin Falls Counties,
Idaho.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Secs. 791(a)-
825(r).
h. Applicant Contact: Robert W. Stahman, Idaho Power Company, 1221
West Idaho Street, P.O. Box 70, Boise, ID 83707, (208) 388-2676.
i. FERC Contact: Alan D. Mitchnick, (202) 219-2826.
j. Deadline for filing interventions and protests: December 18,
1997.
k. Status of Environmental Analysis: This application is not ready
for environmental analysis at this time--see attached paragraph E.
l. Brief Description of Project: The existing project consists of:
(1) a diversion dam consisting of four sections with a total length of
798.4 feet; (2) a reinforced concrete intake structure; (3) a 450-foot-
long tunnel and 120-foot-long penstock; (4) a powerhouse containing
three generating units with an installed nameplate capacity of 12.5
megawatts; (5) an 86-acre impoundment with a gross storage of 1,500
acre-feet at normal operating elevation; and (6) other appurtenances.
m. This notice also consists of the following standard paragraphs:
B1, E.
n. Requests for additional studies have been filed in accordance
with section 4.32(b)(7) of the Commission's regulations. These study
requests will be addressed in any additional information request to be
issued later in the licensing proceeding.
B1. Protests or Motions to Intervene--Anyone may submit a protest
or a motion to intervene in accordance with the requirements of Rules
of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In
determining the appropriate action to take, the Commission will
consider all protests filed, but only those who file a motion to
intervene in accordance with the Commission's Rules may become a party
to the proceeding. Any protests or motions to intervene must be
received on or before the specified deadline date for the particular
application.
E. Filing and Service of Responsive Documents--The application is
not ready for environmental analysis at this time; therefore, the
Commission is not now requesting comments, recommendations, terms and
conditions, or prescriptions.
When the application is ready for environmental analysis, the
Commission will notify all persons on the service list and affected
resource agencies and Indian tribes. If any person wishes to be placed
on the service list, a motion to intervene must be filed by the
specified deadline date herein for such motions. All resource agencies
and Indian tribes that have official responsibilities that may be
affected by the issues addressed in this proceeding, and persons on the
service list will be able to file comments, terms and conditions, and
prescriptions within 60 days of the date the Commission issues a
notification letter that the application is ready for an environmental
analysis. All reply comments must be filed with the Commission within
105 days from the date of that letter.
All filings must (1) bear in all capital letters the title
``PROTEST'' or ``MOTION TO INTERVENE;'' (2) set forth in the heading
the name of the applicant and the project number of the application to
which the filing responds; (3) furnish the name, address, and telephone
number of the person protesting or intervening; and (4) otherwise
comply with the requirements of 18 CFR 385.2001 through 385.2005. Any
of these documents must be filed by providing the original and the
number of copies required by the Commission's regulations to: The
Secretary, Federal Energy Regulatory Commission, 888 First Street,
N.E., Washington, D.C. 20426. An additional copy must be sent to
Director, Division of Project Review, Office of Hydropower Licensing,
Federal Energy Regulatory Commission, at the above address. A copy of
any protest or motion to intervene must be served upon each
representative of the applicant specified in the particular
application.
Lois D. Cashell,
Secretary.
[FR Doc. 97-28337 Filed 10-24-97; 8:45 am]
BILLING CODE 6717-01-M