[Federal Register Volume 62, Number 207 (Monday, October 27, 1997)]
[Notices]
[Pages 55627-55628]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-28343]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RP98-17-000]
Dauphin Island Gathering Partners; Notice of Tariff Filing
October 21, 1997.
Take notice that on October 15, 1997, Dauphin Island Gathering
Partners (DIGP) tendered for filing as part of its FERC Gas Tariff,
Original Volume No. 1, revised tariff sheets to be effective on the
same date that DIGP's compliance tariff, filed on September 2, 1997 in
Docket No. CP97-300-002, is permitted to become effective. The revised
tariff sheets tendered by DIGP are listed on Appendix A to the filing.
DIGP states that the purpose of its filing is threefold: (i)
compliance with Order No. 636-C, which requires any pipeline with a
right-of-first refusal tariff provision containing a contract matching
term cap longer than five years to revise its tariff; (ii) compliance
with a Commission order issued on June 27, 1997, 79 FERC para. 61,391
(1997), requiring DIGP to file tariff sheets to implement the EDI/EDM
requirements proposed by the Gas Industry Standards Board and adopted
by the Commission in Order Nos. 587 et al.; and (iii) revisions to
conform the tariff to the operating capabilities of the computer system
to be used by DIGP, to more accurately reflect how the DIGP facilities
will be operated on a daily basis and to provide the same level of
flexibility that has been approved in other recently-issued Commission
orders. The tariff sheet that reflects the first category of changes,
compliance with Order No. 636-C, is Substitute Original Sheet No. 183,
Section 18.4. The tariff sheets reflecting the second category of
changes, compliance with the EDI/EDM requirements, are Substitute
Original Sheet No. 169, Section 14.1 and Substitute Original Sheet No.
226. All of the remaining tariff sheets are intended to set forth the
third category of changes.
DIGP further requests that the Commission waive sections 154.203(b)
and 154.207 of the regulations to permit the filing of the tariff
sheets and their
[[Page 55628]]
effectiveness in the manner more fully described in the filing.
DIGP states that copies of its filing are being served on parties
on the Commission's official service list in Docket No. CP97-300-000 et
al., the proceeding in the which DIGP initially received its
certificate of public convenience and necessity.
Any person desiring to be heard or to protest the filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E. Washington, D.C. 20426 in
accordance with sections 385.214 and 385.211 of the Commission's rules
and regulations.All such motions or protests must be filed in
accordance with Section 154.210 of the Commission's Regulations.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
commission and are available for public inspection in the Public
Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 97-28343 Filed 10-24-97; 8:45 am]
BILLING CODE 6717-01-M