[Federal Register Volume 59, Number 208 (Friday, October 28, 1994)]
[Unknown Section]
[Page ]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-26707]
[Federal Register: October 28, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER94-533-000, et al.]
PSI Energy, Inc., et al.; Electric Rate and Corporate Regulation
Filings
October 19, 1994.
Take notice that the following filings have been made with the
Commission:
1. PSI Energy, Inc. Docket No. ER94-533-000
Take notice that on October 11, 1994, PSI Energy, Inc. tendered for
filing an amendment in the above-referenced docket.
Comment date: November 2, 1994, in accordance with Standard
Paragraph E at the end of this notice.
2. Cenergy, Inc. Docket No. ER94-1402-000
Take notice that on October 11, 1994, Cenergy, Inc. tendered for
filing an amendment in the above-referenced docket.
Comment date: November 2, 1994, in accordance with Standard
Paragraph E at the end of this notice.
3. PSI Energy, Inc. Docket No. ER94-1473-000
Take notice that on October 12, 1994, PSI Energy, Inc. (PSI),
tendered for filing an amended Service Schedule in the FERC Filing in
Docket No. ER94-1473-000 to comply with a FERC Staff request.
Copies of the filing were served on the Electric Clearinghouse,
Inc., Texas Public Utility Commission and the Indiana Utility
Regulatory Commission.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
4. PSI Energy, Inc. Docket No. ER94-1603-000
Take notice that on October 11, 1994, PSI Energy, Inc. (PSI),
tendered for filing a Certificate of Concurrence between PSI and LG&E
Power Marketing, Inc. (LPM).
Copies of the filing were served on LG&E Power Marketing, Inc.,
Virginia State Corporation Commission and the Indiana Utility
Regulatory Commission.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
5. Wisconsin Power and Light Company Docket No. ER95-22-000
Take notice that on October 7, 1994, Wisconsin Power and Light
Company (WP&L), tendered for filing a signed Service Agreement under
WP&L's Bulk Power Tariff between itself and ENRON Corporation. WP&L
respectfully requests a waiver of the Commission's notice requirements,
and an effective date of October 1, 1994.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
6. Wisconsin Power and Light Company Docket No. ER95-23-000
Take notice that on October 7, 1994, Wisconsin Power and Light
Company (WP&L), tendered for filing a signed Service Agreement under
WP&L's Bulk Power Tariff between itself and Wisconsin Public Service
Corporation. WP&L respectfully requests a waiver of the Commission's
notice requirements, and an effective date of November 1, 1994.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
7. Wisconsin Power and Light Company Docket No. ER95-24-000
Take notice that on October 7, 1994, Wisconsin Power and Light
Company (WP&L), tendered for filing a signed Service Agreement under
WP&L's T-2 Transmission Tariff between itself and ENRON Corporation.
WP&L respectfully requests a waiver of the Commission's notice
requirements, and an effective date of October 1, 1994.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
8. Wisconsin Power and Light Company Docket No. ER95-25-000
Take notice that on October 7, 1994, Wisconsin Power and Light
Company (WP&L), tendered for filing a signed Service Agreement under
WP&L's T-2 Transmission Tariff between itself and Consolidated Water
Power Company. WP&L respectfully requests a waiver of the Commission's
notice requirements, and an effective date of September 12, 1994.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
9. Carolina Power & Light Company Docket No. ER95-27-000
Take notice that on October 7, 1994, Carolina Power & Light
Company, tendered for filing with the Commission contract amendments to
Rate Schedules contained in CP&L's Interchange Agreements with:
Duke Power Company (CP&L Rate Schedule FERC No. 45)
Virginia Electric and Power Company (CP&L Rate Schedule
FERC No. 96)
South Carolina Electric & Gas Company (CP&L Rate Schedule
FERC No. 97)
South Carolina Public Service Authority (CP&L Rate
Schedule FERC No. 1040)
These contract amendments have been filed for the purpose of:
Reducing the amount of time one company can obtain
emergency capacity from the other without a demand charge, and
Eliminate those references to Spinning Reserve which are
not consistent with the Operating Guidelines of the North American
Electric Reliability Council (NERC).
A copy of this filing has been sent to affected utility, the North
Carolina Utilities Commission, and the South Carolina Public Service
Commission.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
10. Thomas J. May Docket No. ID-2313-001
Take notice that on October 12, 1994, Thomas J. May, tendered for
filing an application under Section 305(b) of the Federal Power Act to
hold the following positions:
Chairman and Chief Executive Officer--Boston Edison Company
Director--New England Mutual Life Insurance Company
Director--Bank of Boston Corporation
Director--The First National Bank of Boston
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
11. Altresco-Pittsfield, L.P. Docket No. QF88-21-005
On October 6, 1994, Altresco-Pittsfield, L.P. (Applicant), of 235
Merrill Road, Pittsfield, Massachusetts 01201, submitted for filing an
application for recertification of a facility as a qualifying
cogeneration facility pursuant to Section 292.207(b) of the
Commission's Regulations. No determination has been made that the
submittal constitutes a complete filing.
According to the applicant, the topping-cycle cogeneration facility
is located in Pittsfield, Massachusetts. The Commission previously
certified the facility as a qualifying cogeneration facility in
Altresco-Pittsfield, Inc., 42 FERC 62,021 (1988) and recertified the
facility in Altresco-Pittsfield, L.P., 51 FERC 62,274 (1990) and in
Connecticut National Bank, 54 FERC 62,092 (1991). A notice of self-
recertification for the facility was filed on August 25, 1994. The
instant request for recertification is due to a change in ownership of
the facility.
Comment date: Within 30 days after the date of publication in the
Federal Register, in accordance with Standard Paragraph E at the end of
this notice.
12. Enron Power Marketing, Inc. Docket No. TX95-1-000
Take notice that on October 11, 1994, Enron Power Marketing, Inc.
(``Enron Power'') tendered for filing an application requesting the
Commission order Consolidated Edison Company of New York (ConEd) to
provide transmission services pursuant to Section 211 of the Federal
Power Act.
Enron Power requests a standing transmission arrangement to begin
as soon as possible, for as available, point(s)-to-point(s) non-firm
transmission service to be called upon by Enron Power from time to time
and on terms and conditions comparable to those ConEd provides for
itself and other parties in similar circumstances. As the need for
specific transactions arises, they will be scheduled, provided and paid
for in accordance with ConEd's then current scheduling procedures,
across or within ConEd's system. Enron Power may request any amount of
transmission capacity up to the amount available on ConEd's system at
the time of a specific request is scheduled. Service would commence as
soon as possible and last for an indefinite term, at a minimum long
enough to accommodate specific transactions lasting several years.
Comment date: November 3, 1994, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-26707 Filed 10-27-94; 8:45 am]
BILLING CODE 6717-01-P