94-26707. PSI Energy, Inc., et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 59, Number 208 (Friday, October 28, 1994)]
    [Unknown Section]
    [Page ]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-26707]
    
    
    [Federal Register: October 28, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER94-533-000, et al.]
    
    
    PSI Energy, Inc., et al.; Electric Rate and Corporate Regulation 
    Filings
    
    October 19, 1994.
        Take notice that the following filings have been made with the 
    Commission:
        1. PSI Energy, Inc. Docket No. ER94-533-000
        Take notice that on October 11, 1994, PSI Energy, Inc. tendered for 
    filing an amendment in the above-referenced docket.
        Comment date: November 2, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        2. Cenergy, Inc. Docket No. ER94-1402-000
        Take notice that on October 11, 1994, Cenergy, Inc. tendered for 
    filing an amendment in the above-referenced docket.
        Comment date: November 2, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        3. PSI Energy, Inc. Docket No. ER94-1473-000
        Take notice that on October 12, 1994, PSI Energy, Inc. (PSI), 
    tendered for filing an amended Service Schedule in the FERC Filing in 
    Docket No. ER94-1473-000 to comply with a FERC Staff request.
        Copies of the filing were served on the Electric Clearinghouse, 
    Inc., Texas Public Utility Commission and the Indiana Utility 
    Regulatory Commission.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        4. PSI Energy, Inc. Docket No. ER94-1603-000
        Take notice that on October 11, 1994, PSI Energy, Inc. (PSI), 
    tendered for filing a Certificate of Concurrence between PSI and LG&E 
    Power Marketing, Inc. (LPM).
        Copies of the filing were served on LG&E Power Marketing, Inc., 
    Virginia State Corporation Commission and the Indiana Utility 
    Regulatory Commission.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        5. Wisconsin Power and Light Company Docket No. ER95-22-000
        Take notice that on October 7, 1994, Wisconsin Power and Light 
    Company (WP&L), tendered for filing a signed Service Agreement under 
    WP&L's Bulk Power Tariff between itself and ENRON Corporation. WP&L 
    respectfully requests a waiver of the Commission's notice requirements, 
    and an effective date of October 1, 1994.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        6. Wisconsin Power and Light Company Docket No. ER95-23-000
        Take notice that on October 7, 1994, Wisconsin Power and Light 
    Company (WP&L), tendered for filing a signed Service Agreement under 
    WP&L's Bulk Power Tariff between itself and Wisconsin Public Service 
    Corporation. WP&L respectfully requests a waiver of the Commission's 
    notice requirements, and an effective date of November 1, 1994.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        7. Wisconsin Power and Light Company Docket No. ER95-24-000
        Take notice that on October 7, 1994, Wisconsin Power and Light 
    Company (WP&L), tendered for filing a signed Service Agreement under 
    WP&L's T-2 Transmission Tariff between itself and ENRON Corporation. 
    WP&L respectfully requests a waiver of the Commission's notice 
    requirements, and an effective date of October 1, 1994.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        8. Wisconsin Power and Light Company Docket No. ER95-25-000
        Take notice that on October 7, 1994, Wisconsin Power and Light 
    Company (WP&L), tendered for filing a signed Service Agreement under 
    WP&L's T-2 Transmission Tariff between itself and Consolidated Water 
    Power Company. WP&L respectfully requests a waiver of the Commission's 
    notice requirements, and an effective date of September 12, 1994.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        9. Carolina Power & Light Company Docket No. ER95-27-000
        Take notice that on October 7, 1994, Carolina Power & Light 
    Company, tendered for filing with the Commission contract amendments to 
    Rate Schedules contained in CP&L's Interchange Agreements with:
         Duke Power Company (CP&L Rate Schedule FERC No. 45)
         Virginia Electric and Power Company (CP&L Rate Schedule 
    FERC No. 96)
         South Carolina Electric & Gas Company (CP&L Rate Schedule 
    FERC No. 97)
         South Carolina Public Service Authority (CP&L Rate 
    Schedule FERC No. 1040)
        These contract amendments have been filed for the purpose of:
         Reducing the amount of time one company can obtain 
    emergency capacity from the other without a demand charge, and
         Eliminate those references to Spinning Reserve which are 
    not consistent with the Operating Guidelines of the North American 
    Electric Reliability Council (NERC).
        A copy of this filing has been sent to affected utility, the North 
    Carolina Utilities Commission, and the South Carolina Public Service 
    Commission.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        10. Thomas J. May Docket No. ID-2313-001
        Take notice that on October 12, 1994, Thomas J. May, tendered for 
    filing an application under Section 305(b) of the Federal Power Act to 
    hold the following positions:
    
    Chairman and Chief Executive Officer--Boston Edison Company
    Director--New England Mutual Life Insurance Company
    Director--Bank of Boston Corporation
    Director--The First National Bank of Boston
    
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
        11. Altresco-Pittsfield, L.P. Docket No. QF88-21-005
        On October 6, 1994, Altresco-Pittsfield, L.P. (Applicant), of 235 
    Merrill Road, Pittsfield, Massachusetts 01201, submitted for filing an 
    application for recertification of a facility as a qualifying 
    cogeneration facility pursuant to Section 292.207(b) of the 
    Commission's Regulations. No determination has been made that the 
    submittal constitutes a complete filing.
        According to the applicant, the topping-cycle cogeneration facility 
    is located in Pittsfield, Massachusetts. The Commission previously 
    certified the facility as a qualifying cogeneration facility in 
    Altresco-Pittsfield, Inc., 42 FERC 62,021 (1988) and recertified the 
    facility in Altresco-Pittsfield, L.P., 51 FERC 62,274 (1990) and in 
    Connecticut National Bank, 54 FERC 62,092 (1991). A notice of self-
    recertification for the facility was filed on August 25, 1994. The 
    instant request for recertification is due to a change in ownership of 
    the facility.
        Comment date: Within 30 days after the date of publication in the 
    Federal Register, in accordance with Standard Paragraph E at the end of 
    this notice.
        12. Enron Power Marketing, Inc. Docket No. TX95-1-000
        Take notice that on October 11, 1994, Enron Power Marketing, Inc. 
    (``Enron Power'') tendered for filing an application requesting the 
    Commission order Consolidated Edison Company of New York (ConEd) to 
    provide transmission services pursuant to Section 211 of the Federal 
    Power Act.
        Enron Power requests a standing transmission arrangement to begin 
    as soon as possible, for as available, point(s)-to-point(s) non-firm 
    transmission service to be called upon by Enron Power from time to time 
    and on terms and conditions comparable to those ConEd provides for 
    itself and other parties in similar circumstances. As the need for 
    specific transactions arises, they will be scheduled, provided and paid 
    for in accordance with ConEd's then current scheduling procedures, 
    across or within ConEd's system. Enron Power may request any amount of 
    transmission capacity up to the amount available on ConEd's system at 
    the time of a specific request is scheduled. Service would commence as 
    soon as possible and last for an indefinite term, at a minimum long 
    enough to accommodate specific transactions lasting several years.
        Comment date: November 3, 1994, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-26707 Filed 10-27-94; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
10/28/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-26707
Dates:
November 2, 1994, in accordance with Standard Paragraph E at the end of this notice.
Pages:
0-0 (None pages)
Docket Numbers:
Federal Register: October 28, 1994, Docket No. ER94-533-000, et al.