[Federal Register Volume 62, Number 208 (Tuesday, October 28, 1997)]
[Notices]
[Pages 55799-55800]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-28465]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. TM98-2-29-000]
Transcontinental Gas Pipe Line Corporation; Notice of Proposed
Changes in FERC Gas Tariff
October 22, 1997.
Take notice that on October 17, 1997, Transcontinental Gas Pipe
Line Corporation (Transco), tendered for filing its FERC Gas Tariff,
Third Revised Volume No. 1, certain revised tariff sheets which are
enumerated in Appendix A attached to the filing, with an effective date
of October 1, 1997.
Transco states that the purpose of the instant filing is to track
rate changes attributable to (1) storage service purchased from
National Fuel Gas Supply Corporation (National Fuel) under its Rate
Schedule SS-1, the costs of which are included in the rates and charges
payable under Transco's Rate Schedules LSS and SS-2, (2) storage
service purchased from CNG Transmission Corporation (CNG) under its
Rate Schedule GSS, the costs of which are included in the rates and
charges payable under Transco's Rate Schedules LSS and GSS, (3)
transportation service purchased from National Fuel under its Rate
Schedule X-54, the costs of which are included in the rates and charges
payable under Transco's Rate Schedule SS-2, (4) transportation service
purchased from Texas Gas Transmission Corporation (Texas Gas) under its
rate schedule FT, the costs of which are included in the rates and
charges payable under Transco's Rate Schedule FT-NT, and (5) storage
service purchased from Texas Eastern Transmission Corporation (TETCO)
under its Rate Schedule X-28, the costs of which are included in the
rates and charges payable under Transco's Rate Schedule S-2.
Transco states that this tracking filing is being made pursuant to
tracking provisions under Section 4 of Transco's Rate Schedule LSS,
Section 4 of Transco's Rate Schedule SS-2, Section 4 of Transco's Rate
Schedule FT-NT, Section 3 of Transco's Rate Schedule GSS, and Section
26 of the General Terms and Conditions of Transco's Volume No. 1
Tariff. Transco also filed therein Substitute Eighth Revised Sheet No.
28 to incorporate changes originally filed August 26, 1997 in Docket
No. TM97-12-29, to be effective August 1, 1997. Such filing
inadvertently omitted a change to Transco's Rate Schedule S-2 Demand
Charge Adjustment.
Transco states that included in Appendices B through E attached to
the filing are explanations of the rate changes and details regarding
the computation of the revised Rate Schedules LSS, SS-2, FT-NT, S-2 and
GSS rates.
Transco states that copies of the filing are being mailed to each
of its LSS, SS-2, FT-NT, S-2 and GSS customers and interested State
Commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Sections 385.214 and 385.211 of the
[[Page 55800]]
Commission's Rules and Regulations. All such motions or protests must
be filed as provided in Section 154.210 of the Commission's
Regulations. Protests will be considered by the Commission in
determining the appropriate action to be taken, but will not serve to
make protestants parties to the proceeding. Any person wishing to
become a party must file a motion to intervene. Copies of this filing
are on file with the Commission and are available for public inspection
in the Public Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 97-28465 Filed 10-27-97; 8:45 am]
BILLING CODE 6717-01-M