[Federal Register Volume 64, Number 208 (Thursday, October 28, 1999)]
[Notices]
[Pages 58055-58056]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-28194]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Notice of Application Accepted for Filing and Soliciting Motions
To Intervene and Protests
October 22, 1999.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Type of Application: Preliminary Permit.
b. Project No.: P-11794-000.
c. Date filed: July 16, 1999.
d. Applicant: Shelby Electric Cooperative, Inc.
e. Name of Project: Lake Shelbyville Project.
f. Location: At the Corps of Engineer's Shelbyville Dam, on the
Kaskaskia River, near the Town of Shelbyville, Shelby County, Illinois.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. Secs. 791(a)-
825(r).
h. Applicant Contact: Mr. James E. Coleman, Shelby Electric
Cooperative, Route 128 and North 6th Street, Shelbyville, Illinois
62565, (217) 774-3986.
i. FERC Contact: Michael Spencer, [email protected],
(202) 219-2846.
j. Deadline for filing motions to intervene and protest: 60 days
from the issuance date of this notice.
All documents (original and eight copies) should be filed with:
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888
First Street, NE, Washington, DC 20426.
The Commission's Rules and Practice and Procedure require all
intervenors filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervenor files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Project: The proposed project would utilize the
Corps of Engineer's Shelbyville dam and consist of the following: (1) a
12.25-inch-diameter, 332-foot-long steel penstock, constructed in the
existing outlet works; (2) a powerhouse containing one generating unit
with a total capacity of 6.1 MW and an estimated average annual
generation of 21.2 GWh; and (3) a 800-foot-long transmission line.
l. Locations of the application: A copy of the application is
available for inspection and reproduction at the Commission's Public
Reference and Files Maintenance Branch, located at 888 First Street,
N.W., Room 2A, Washington, D.C. 20426, or by calling (202) 219-1371.
This filing may be viewed on the web at http://www.ferc.fed.us/online/
rims.htm (Call (202) 208-2222 for assistance). A copy is also available
for inspection and reproduction at the address in item h above.
Preliminary Permit--Any qualified development applicant desiring to
file a competing development application must submit to the Commission,
on or before a specified comment date for the particular application,
either a competing development application or a notice of intent to
file such an application. Submission of a timely notice of intent to
file a development application allows an interested person to file the
competing application no later than 120 days after the specified
comment date for the particular application. A competing license
application must conform with 18 CFR 4.30(b) and 4.36.
Notice of intent--A notice of intent must specify the exact name,
business address, and telephone number of the prospective applicant,
and must include an unequivocal statement of intent to submit, if such
an application may be filed, either a preliminary permit application or
a development application (specify which type of application). A notice
of intent must be served on the applicant(s) named in this public
notice.
Proposed Scope of Studies under Permit--A preliminary permit, if
issued, does not authorize construction. The term of the proposed
preliminary permit would be 36 months. The work proposed under the
preliminary permit would include economic analysis, preparation of
preliminary engineering plans, and a study of environmental impacts.
Based on the results of these studies, the Applicant would decide
whether to proceed with the preparation of a development application to
construct and operate the project.
Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a
[[Page 58056]]
party to the proceeding. Any comments, protests, or motions to
intervene must be received on or before the specified comment date for
the particular application.
Filing and Service of Responsive Documents--Any filings must bear
in all capital letters the title ``COMMENTS'', ``NOTICE OF INTENT TO
FILE COMPETING APPLICATION'', ``COMPETING APPLICATION'', ``PROTEST'',
``MOTION TO INTERVENE'', as applicable, and the Project Number of the
particular application to which the filing refers. Any of the above-
named documents must be filed by providing the original and the number
of copies provided by the Commission's regulations to: The Secretary,
Federal Energy Regulatory Commission, 888 First Street, N.E.,
Washington, D.C. 20426. An additional copy must be sent to Director,
Division of Project Review, Federal Energy Regulatory Commission, at
the above-mentioned address. A copy of any notice of intent, competing
application or motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
Agency Comments--Federal, state, and local agencies are invited to
file comments on the described application. A copy of the application
may be obtained by agencies directly from the Applicant. If an agency
does not file comments within the time specified for filing comments,
it will be presumed to have no comments. One copy of an agency's
comments must also be sent to the Applicant's representatives.
David P. Boergers,
Secretary.
[FR Doc. 99-28194 Filed 10-27-99; 8:45 am]