96-27647. Williston Basin Interstate Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 210 (Tuesday, October 29, 1996)]
    [Notices]
    [Pages 55798-55799]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-27647]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-29-000]
    
    
    Williston Basin Interstate Pipeline Company; Notice of Request 
    Under Blanket Authorization
    
    October 23, 1996.
        Take notice that on October 16, 1996, Williston Basin Pipeline 
    Company (Williston Basin), 200 North Third Street, Suite 300, Bismarck, 
    North Dakota 58501, filed in Docket No. CP97-29-000 a request pursuant 
    to Sections 157.205 and 157.211 of the Commission's Regulations under 
    the Natural Gas Act (18 CFR 157.205, 157.211) for authorization to 
    operate an existing tap to accommodate deliveries of gas to Montana-
    Dakota Utilities Co. in Custer County, Montana, under Williston Basin's 
    blanket certificate issued in Docket No. CP82-487-000, pursuant to 
    Section 7 of the Natural Gas Act, all as more fully set forth in the 
    request that is on file with the Commission and open to public 
    inspection.
        Williston Basin proposes to utilize the tap for the delivery of 100 
    Mcf of natural gas per day to M-D Utilities, a local distribution 
    company. It is started that the end use of the gas will be residential. 
    Williston Basin proposes to transport gas to M-D Utilities under its 
    Rate Schedules FT-1 and/or IT-1. It is asserted that the proposed 
    deliveries will have no significant effect on Williston Basin's peak 
    day or annual requirements. It is stated that Williston Basin has 
    sufficient capacity to make the deliveries and that Williston Basin's 
    tariff does not prohibit the addition of new delivery points. It is 
    further stated that the deliveries are within the existing entitlement 
    of M-D Utilities.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section
    
    [[Page 55799]]
    
    157.205 of the Regulations under the Natural Gas Act (18 CFR 157.205) a 
    protest to the request. If no protest is filed within time allowed 
    therefor, the proposed activity shall be deemed to be authorized 
    effective the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-27647 Filed 10-28-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/29/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-27647
Pages:
55798-55799 (2 pages)
Docket Numbers:
Docket No. CP97-29-000
PDF File:
96-27647.pdf