98-28930. Baltimore Gas and Electric Company, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 209 (Thursday, October 29, 1998)]
    [Notices]
    [Pages 58022-58026]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-28930]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. EC99-5-000, et al.]
    
    
    Baltimore Gas and Electric Company, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    October 22, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Baltimore Gas and Electric Company
    
    [Docket No. EC99-5-000]
    
        Take notice that on October 19, 1998, Baltimore Gas and Electric 
    Company (Applicant) filed, pursuant to Section 203 of the Federal Power 
    Act (FPA), 16 U.S.C. Sec. 824b (1994), and Part 33 of the Commission's 
    Regulations, 18 CFR Part 33, an Application for an order authorizing 
    and approving the implementation of a holding company structure.
        Pursuant to a share exchange, owners of BGE's common stock will 
    exchange, one for one, their shares of stock for shares of the common 
    stock of a new corporation (HoldCo). The subsidiaries of BGE will 
    become subsidiaries of HoldCo.
        A copy of the Application has been served on the state utility 
    regulatory commission of Maryland and Pennsylvania.
        Comment date: November 18, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. M-S-R Public Power Agency; Modesto Irrigation District; City of 
    Santa Clara, California; City of Redding, California
    
    [Docket No. EL99-4-000]
    
        Take notice that on October 16, 1998, the M-S-R Public Power 
    Agency, the Modesto Irrigation District, the City of Santa Clara, 
    California and the City of Redding, California, tendered for filing, in 
    a joint pleading, independent requests for waiver of the separation of 
    function requirements of Commission Order No. 889.
        Comment date: November 23, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 58023]]
    
    3. Duke Energy Corporation
    
    [Docket Nos. ER97-2099-002 and ER97-2212-002]
    
        Take notice that on October 19, 1998, Duke Energy Corporation 
    (Duke), tendered for filing a compliance report in the above-referenced 
    dockets in response to the Federal Energy Regulatory Commission's 
    September 17, 1998, Order in Docket No. ER97-2099-002. The report 
    relates to refunds in connection with transmission services for the 
    Seneca Light and Water Board, Seneca, South Carolina and the 
    Commissioners of Public Works of the City of Greenwood, South Carolina.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. MidAmerican Energy Company
    
    [Docket No. ER97-4555-000]
    
        Take notice that on October 19, 1998, MidAmerican Energy Company 
    (MidAmerican), P.O. Box 657, 666 Grand Avenue, Des Moines, Iowa 50303, 
    tendered for filing a notice of withdrawal of the changes to its Open 
    Access Transmission Tariff previously filed in the above-referenced 
    docket.
        Copies of the notice of withdrawal were served on all parties to 
    this proceeding.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. California Independent System Operator Corporation
    
    [Docket No. ER98-1846-001]
    
        Take notice that on October 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing the executed 
    Amendment No. 1, to the Meter Service Agreement for Scheduling 
    Coordinators between Electric Clearinghouse, Inc., and the ISO for 
    acceptance by the Commission. The ISO states that this filing revises 
    the Meter Service Agreement for Scheduling Coordinators, as directed by 
    the Commission, to comply with the Commission's order issued December 
    17, 1997 in Pacific Gas and Electric Co., 81 FERC para. 61,320 (1997).
        The ISO states that this filing has been served on all parties 
    listed on the official service list in the above-referenced dockets.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Rochester Gas and Electric Corporation
    
    [Docket No. ER98-3921-001 and ER98-3922-001]
    
        Take notice that on October 19, 1998, Rochester Gas and Electric 
    Corporation (RG&E), tendered for filing with the Federal Energy 
    Regulatory Commission (Commission) the revised form of service 
    agreements and network operating agreements for the provision of 
    network service to the Villages of Spencerport and Angelica, New York, 
    in compliance with the Commission's September 18, 1998, order in the 
    above-referenced proceeding.
        A copy of this filing letter has been served on all parties on the 
    Commission's official service list.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Duquesne Light Company
    
    [Docket No. ER98-4159-001]
    
        Take notice that on October 19, 1998, Duquesne Light Company 
    (Duquesne), tendered for filing its Code of Conduct in compliance with 
    the Commission's Order of October 2, 1998 in Docket No. ER98-4159-000.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Constellation Energy Source, Inc.
    
    [Docket No. ER99-198-000]
    
        Take notice that on October 16, 1998, Constellation Energy Source, 
    Inc. (CES), tendered for filing an amendment to its October 14, 1998, 
    application filed in the above-referenced docket.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Rochester Gas and Electric Corporation
    
    [Docket No. ER99-234-000]
    
        Take notice that on October 19, 1998, Rochester Gas and Electric 
    Corporation (RG&E), filed a Market Based Service Agreement between RG&E 
    and Southern Company Energy Marketing (Customer). This Service 
    Agreement specifies that the Customer has agreed to the rates, term and 
    conditions of RG&E's FERC Electric Rate Schedule No. 3, Original Volume 
    No. 1 (Power Sales Tariff) accepted by the Commission.
        RG&E requests waiver of the Commission's sixty (60) day notice 
    requirements and an effective date of October 14, 1998, for Southern 
    Company Energy Marketing Service Agreement.
        RG&E has served copies of the filing on the New York State Public 
    Service Commission and on the Customer.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Black Hills Corporation
    
    [Docket No. ER99-236-000]
    
        Take notice that on October 19, 1998, Black Hills Corporation which 
    operates its electric utility business under the assumed name of Black 
    Hills Power and Light Company (Black Hills), tendered for filing an 
    Umbrella Service Agreement for Short-Term Firm Point-to-Point 
    Transmission Service with Merchant Energy Group of the Americas, Inc.
        Black Hills requests that the Agreements be made effective on 
    October 14, 1998.
        Copies of the filing were provided to the regulatory commission of 
    each of the states of Montana, South Dakota, and Wyoming.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Allegheny Power Service Corporation, on behalf of Monongahela 
    Power Co., The Potomac Edison Company, and West Penn Power Company; 
    (Allegheny Power)
    
    [Docket No. ER99-237-000]
    
        Take notice that on October 19, 1998, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power or AP), tendered 
    for filing Amendment No. 2, to AP's Pro Forma Open Access Transmission 
    Tariff to update the Tariff to include current information and 
    Commission approved practices.
        Allegheny Power requests an October 15, 1998, effective date for 
    this amendment.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Illinois Power Company
    
    [Docket No. ER99-240-000]
    
        Take notice that on October 19, 1998, Illinois Power Company 
    (Illinois Power), 500 South 27th Street, Decatur, Illinois 62526, 
    tendered for filing a
    
    [[Page 58024]]
    
    Power Sales Tariff, Service Agreement under which Enserch Energy 
    Services, Inc., will take service under Illinois Power Company's Power 
    Sales Tariff. The agreements are based on the Form of Service Agreement 
    in Illinois Power's tariff.
        Illinois Power has requested an effective date of September 29, 
    1998.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. FirstEnergy System
    
    [Docket No. ER99-241-000]
    
        Take notice that on October 19, 1998, FirstEnergy System tendered 
    for filing a Service Agreement to provide Firm Point-to-Point 
    Transmission Service for Consumers Energy Company and The Detroit 
    Edison Company (referred to collectively as the Michigan Companies), 
    the Transmission Customers. Services are being provided under the 
    FirstEnergy System's Open Access Transmission Tariff submitted for 
    filing by the Federal Energy Regulatory Commission in Docket No. ER97-
    412-000.
        The proposed effective date under the Service Agreement is October 
    1, 1998, for the above mentioned Service Agreement in this filing.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Ohio Valley Electric Corporation Indiana-Kentucky Electric 
    Corporation
    
    [Docket No. ER99-242-000]
    
        Take notice that on October 19, 1998, Ohio Valley Electric 
    Corporation (including its wholly-owned subsidiary, Indiana-Kentucky 
    Electric Corporation) (OVEC), tendered for filing a Service Agreement 
    for Non-Firm Point-To-Point Transmission Service, dated October 8, 1998 
    (the Service Agreement), between Statoil Energy Trading, Inc. (SETI) 
    and OVEC.
        OVEC proposes an effective date of October 8, 1998, and requests 
    waiver of the Commission's notice requirement to allow the requested 
    effective date. The Service Agreement provides for non-firm 
    transmission service by OVEC to SETI.
        In its filing, OVEC states that the rates and charges included in 
    the Service Agreement are the rates and charges set forth in OVEC's 
    Open Access Transmission Tariff.
        A copy of this filing was served upon SETI.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. California Independent System Operator Corporation
    
    [Docket No. ER99-243-000]
    
        Take notice that on October 19, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing a Meter Service 
    Agreement for ISO Metered Entitles (Meter Service Agreement) between 
    the ISO and the Monsanto Company (Monsanto) for acceptance by the 
    Commission.
        The ISO states that this filing has been served on Monsanto and the 
    California Public Utilities Commission.
        The ISO is requesting waiver of the 60-day notice requirement to 
    allow the Meter Service Agreement to be made effective as of October 
    13, 1998.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Central Hudson Gas and Electric Corporation
    
    [Docket No. ER99-245-000]
    
        Take notice that on October 19, 1998, Central Hudson Gas and 
    Electric Corporation (CHG&E), tendered for filing pursuant to Section 
    35.12 of the Federal Energy Regulatory Commission's (Commission) 
    Regulations in 18 CFR a Service Agreement between CHG&E and Amerada 
    Hess Corporation. The terms and conditions of service under this 
    Agreement are made pursuant to CHG&E's FERC Electric Rate Schedule, 
    Original Volume No. 1 (Power Sales Tariff), accepted by the Commission 
    in Docket No. ER97-890-000.
        CHG&E also has requested waiver of the 60-day notice provision 
    pursuant to 18 CFR Section 35.11 and an effective date of September 30, 
    1998 for the service agreement.
        A copy of this filing has been served on the Public Service 
    Commission of the State of New York.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. American Ref-Fuel Company of Delaware Valley, L.P.
    
    [Docket No. ER99-246-000]
    
        Take notice that on October 19, 1998, American Ref-Fuel Company of 
    Delaware Valley, L.P., tendered for filing notice of succession of 
    American Ref-Fuel Company of Delaware County, L.P. to report its name 
    change to American Ref-Fuel Company of Delaware Valley, L.P.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Allegheny Power Service Corporation, on behalf of Monongahela 
    Power Co., The Potomac Edison Company and West Penn Power Company; 
    (Allegheny Power)
    
    [Docket No. ER99-249-000]
    
        Take notice that on October 19, 1998, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (Allegheny Power), tendered for 
    filing Supplement No. 6 to add one (1) new Customer to the Market Rate 
    Tariff under which Allegheny Power offers generation services.
        Allegheny Power requests a waiver of notice requirements to make 
    service available as of October 16, 1998, to Baltimore Gas and Electric 
    Company.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    parties of record.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Public Service Company of New Mexico
    
    [Docket No. ER99-250-000]
    
        Take notice that on October 19, 1998, Public Service Company of New 
    Mexico (PNM), submitted for filing an executed service agreement for 
    point-to-point transmission service under the terms of PNM's Open 
    Access Transmission Service Tariff, with Tucson Electric Power Company 
    (TEP), dated October 12, 1998, for Non-Firm Service. PNM's filing is 
    available for public inspection at its offices in Albuquerque, New 
    Mexico.
        PNM requests an effective date of February 17, 1997, for the 
    service agreement.
        Comment date: November 10, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Nancy Lampton
    
    [Docket No. ID-3245-000]
    
        Take notice that on October 6, 1998, Nancy Lampton (Applicant) 
    tendered for filing with the Federal Energy Regulatory Commission an 
    application under Section 305(b) of the Federal Power Act to hold the 
    following positions: Director--Baltimore Gas and Electric Company, 
    Director--Bank One Kentucky, N.A.
    
    [[Page 58025]]
    
        Comment date: November 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. U.S. Department of Energy, Southwestern Power Administration
    
    [Docket No. NJ98-2-000]
    
        Take notice that on October 16, 1998, Southwestern Power 
    Administration tendered for filing a change to its Standards of Conduct 
    with Partial Waiver in compliance with the Commission's order in this 
    docket issued on September 18, 1998, 84 FERC 61,257. This filing covers 
    services in excess of those required to fulfill deliveries of Federal 
    Power in accordance with Southwestern's mission under Section 5 of the 
    Flood Control Act of 1944.
        The Commission's order granted Southwestern's request for waiver of 
    the separation of functions requirements and directed Southwestern to 
    submit revised Standards of Conduct. Southwestern has complied with the 
    Commission's order to assure non-discriminatory, non-preferential 
    application of the open-access tariff provisions covered by this 
    filing.
        Comment date: November 23, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Big Rivers Electric Corporation
    
    [Docket No. NJ98-5-000]
    
        Take notice that on October 15, 1998, Big Rivers Electric 
    Corporation (Big Rivers) submitted for filing a revised Standard of 
    Conduct pursuant to 18 CFR 37.4 in compliance with the Commission's 
    September 18, 1998 order in Docket No. NJ98-5-000 reported at 84 FERC 
    para. 61,257 (1998). These Standards of Conduct relate to Big Rivers' 
    implementation of its open access transmission tariff, which tariff was 
    found to constitute a reciprocal tariff in a declaratory order issued 
    by the Commission on September 18, 1998.
        Comment date: November 23, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Consolidated Edison Company of New York, Inc.
    
    [Docket No. OA96-138-005]
    
        Take notice that on October 16, 1998, Consolidated Edison Company 
    of New York, Inc. (Con Edison) tendered for filing revised tariff 
    sheets in compliance with the Commission's September 18, 1998 letter 
    order in this proceeding.
        The September 18 order approved a settlement resolving all of the 
    issues in this proceeding that were not reserved for hearing. The order 
    directed Con Edison to file revised tariff sheets reflecting the 
    approved settlement rates effective as of July 9, 1996. Con Edison 
    states that the revised tariff sheets conform to the terms of the 
    approved settlement agreement.
        Comment date: November 23, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Atlantic City Electric Company
    
    [Docket No. OA97-97-002
    
        Take notice that on October 19, 1998, Atlantic City Electric 
    Company tendered for filing revised Standards of Conduct in compliance 
    with the Commission's September 18, 1998 Order.
        Comment date: November 23, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. Delmarva Power & Light Company
    
    [Docket No. OA97-467-002
    
        Take notice that on October 19, 1998, Delmarva Power & Light 
    Company tendered for filing revised Standards of Conduct in compliance 
    with the Commission's September 18, 1998 Order.
        Comment date: November 23, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. Coso Finance Partners (Navy I Facility)
    
    [Docket No. QF84-327-005
    
        On October 16, 1998, Coso Finance Partners, 302 South 36th Street, 
    Omaha, Nebraska 68131, filed with the Federal Energy Regulatory 
    Commission an application for recertification of a facility as a 
    qualifying small power production facility pursuant to Section 
    292.207(b) and (d)(2) of the Commission's regulations. No determination 
    has been made that the submittal constitutes a complete filing.
        The Commission previously certified the facility as a qualifying 
    small power production facility on July 30, 1984 in Docket No. QF84-
    327-000 and recertified the facility in Docket Nos. QF84-327-001 and 
    QF84-327-003. Recertification is being sought to reflect a change in 
    the status of one of the owners of the facility.
        Comment date: November 16, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. Coso Energy Developers (BLM Facility)
    
    [Docket No. QF86-590-007]
    
        On October 16, 1998, Coso Energy Developers, 302 South 36th Street, 
    Omaha, Nebraska 68131, filed with the Federal Energy Regulatory 
    Commission an application for recertification of a facility as a 
    qualifying small power production facility pursuant to Section 
    292.207(b) and (d)(2) of the Commission's regulations. No determination 
    has been made that the submittal constitutes a complete filing.
        The Commission previously certified the facility as a qualifying 
    small power production facility in 1986 in Docket No. QF86-590-000 and 
    recertified the facility in Docket Nos. QF86-590-001, -003 and -005. 
    Recertification is being sought to reflect a change in the status of 
    one of the owners of the facility.
        Comment date: November 16, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Coso Power Developers (Navy II Facility)
    
    [Docket No. QF86-591-007]
    
        On October 16, 1998, Coso Power Developers, 302 South 36th Street, 
    Omaha, Nebraska 68131, filed with the Federal Energy Regulatory 
    Commission an application for recertification of a facility as a 
    qualifying small power production facility pursuant to Section 
    292.207(b) and (d)(2) of the Commission's regulations. No determination 
    has been made that the submittal constitutes a complete filing.
        The Commission previously certified the facility as a qualifying 
    small power production facility on August 6, 1986 in Docket No. QF86-
    591-000 and recertified the facility in Docket Nos. QF86-591-001 to -
    003 and -005. Recertification is being sought to reflect a change in 
    the status of one of the owners of the facility.
        Comment date: November 16, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. Norcon Power Partners L.P.
    
    [Docket No. QF89-299-004]
    
        On October 16, 1998, Norcon Power Partners L.P., 302 South 36th 
    Street, Omaha, Nebraska 68131, filed with the Federal Energy Regulatory 
    Commission an application for recertification of a facility as a 
    qualifying cogeneration facility pursuant to Section 292.207(b) and 
    (d)(2) of the Commission's regulations. No determination has been made 
    that the submittal constitutes a complete filing.
        The Commission previously certified the facility as a qualifying 
    cogeneration facility on October 23, 1989, in Docket No. QF89-299-000. 
    Recertification is being sought to reflect a change in the status of 
    one of the owners of the facility.
        Comment date: November 16, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 58026]]
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-28930 Filed 10-28-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
10/29/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-28930
Dates:
November 18, 1998, in accordance with Standard Paragraph E at the end of this notice.
Pages:
58022-58026 (5 pages)
Docket Numbers:
Docket No. EC99-5-000, et al.
PDF File:
98-28930.pdf