2024-24963. Monthly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations  

  • License Amendment Requests

    Florida Power & Light Company, et al.; St. Lucie Plant, Unit 2; St. Lucie County, FL
    Docket No 50-389.
    Application date September 11, 2024.
    ADAMS Accession No ML24255A118.
    Location in Application of NSHC Pages 8-9 of Enclosure 1.
    Brief Description of Amendment The proposed license amendment would revise St. Lucie Plant, Unit 2, Technical Specification (TS) 5.6.3, “Core Operating Limits Report,” by updating the listing of NRC-approved analytical methods used to determine the core operating limits. Specifically, changes to the fuel thermal-mechanics, core thermal-hydraulics, emergency core cooling, nuclear design, and select design basis event analyses are proposed using NRC-approved advanced codes and methods in support of a St. Lucie Plant, Unit 2, transition to 24-month fuel cycles.
    Proposed Determination NSHC.
    Name of Attorney for Licensee, Mailing Address James Petro, Managing Attorney—Nuclear, Florida Power & Light Company, 700 Universe Boulevard, MS LAW/JB, Juno Beach, FL 33408-0420.
    NRC Project Manager, Telephone Number Natreon Jordan, 301-415-7410.
    Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Appling County, GA
    Docket Nos 50-321, 50-366.
    Application date September 11, 2024.
    ADAMS Accession No ML24255A892.
    Location in Application of NSHC Pages E-1 to E-3 of the Enclosure.
    Brief Description of Amendments The proposed amendments would modify the Edwin I. Hatch Nuclear Plant, Units 1 and 2, technical specifications (TS) to adopt Technical Specifications Task Force (TSTF)-591, “Revise Risk Informed Completion Time (RICT) Program.” TSTF-591 revises TS Section 5.5 Program, “Risk Informed Completion Time Program,” to reference Regulatory Guide 1.200, Revision 3 (instead of Revision 2) and to make other changes. Also, a new report would be added to TS Section 5.6, “Reporting Requirements,” to inform the NRC of newly developed methods used to calculate a RICT.
    Proposed Determination NSHC.
    Name of Attorney for Licensee, Mailing Address Millicent Ronnlund, Vice President and General Counsel, Southern Nuclear Operating Co., Inc., P.O. Box 1295, Birmingham, AL 35201-1295.
    NRC Project Manager, Telephone Number Dawnmathews Kalathiveettil, 301-415-5905.
    Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2; Houston County, AL
    Docket Nos 50-348, 50-364.
    Application date September 4, 2024.
    ADAMS Accession No ML24248A273.
    Location in Application of NSHC Pages E-6 through E-8 of the Enclosure.
    Brief Description of Amendments The proposed amendments would revise Technical Specification (TS) 3.4.14, “[Reactor Coolant System] Pressure Isolation Valve (PIV) Leakage,” Surveillance Requirement (SR) 3.4.14.3 Acceptance Criteria, remove obsolete requirements found in TS 3.4.14, TS SR 3.4.14.2, and TS 3.3.5, “Loss of Power [LOP] Diesel Generator (DG) Start Instrumentation,” in addition to making editorial corrections resulting from these changes.
    Proposed Determination NSHC.
    Name of Attorney for Licensee, Mailing Address Millicent Ronnlund, Vice President and General Counsel, Southern Nuclear Operating Co., Inc., P.O. Box 1295, Birmingham, AL 35201-1295.
    NRC Project Manager, Telephone Number Zachary Turner 415-6303.
    Tennessee Valley Authority; Sequoyah Nuclear Plant, Units 1 and 2; Hamilton County, TN
    Docket Nos 50-327, 50-328.
    Application date August 28, 2024.
    ( print page 85997)
    ADAMS Accession No ML24247A185 (Package).
    Location in Application of NSHC Pages E1-11-E1-13 of Enclosure 1.
    Brief Description of Amendments The proposed amendments would revise the Sequoyah Nuclear Plant, Units 1 and 2, fuel handling accident analysis, delete Technical Specification (TS) 3.9.4, “Containment Penetrations,” and modify TS 3.3.6, “Containment Ventilation Isolation Instrumentation.”
    Proposed Determination NSHC.
    Name of Attorney for Licensee, Mailing Address David Fountain, Executive VP and General Counsel, Tennessee Valley Authority, 400 West Summit Hill Drive, WT 6A-K, Knoxville, TN 37902.
    NRC Project Manager, Telephone Number Perry Buckberg, 301-415-1383.
    Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1; Coffey County, KS
    Docket No 50-482.
    Application date August 14, 2024.
    ADAMS Accession No ML24227A556.
    Location in Application of NSHC Pages 3-4 of Attachment I.
    Brief Description of Amendment The proposed amendment would adopt Technical Specifications Task Force (TSTF) Traveler TSTF-569-A, Revision 2, “Revise Response Time Testing Definition.” The proposed changes would revise the technical specification definitions for engineered safety feature and reactor trip system response times.
    Proposed Determination NSHC.
    Name of Attorney for Licensee, Mailing Address Chris Johnson, Corporate Counsel Director, Evergy, One Kansas City Place, 1KC-Missouri HQ 16, 1200 Main Street, Kansas City, MO 64105.
    NRC Project Manager, Telephone Number Samson Lee, 301-415-3168.

    III. Notice of Issuance of Amendments to Facility Operating Licenses and Combined Licenses

    During the period since publication of the last monthly notice, the Commission has issued the following amendments. The Commission has determined for each of these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR chapter I, which are set forth in the license amendment.

    A notice of consideration of issuance of amendment to facility operating license or combined license, as applicable, proposed NSHC determination, and opportunity for a hearing in connection with these actions, were published in the Federal Register as indicated in the safety evaluation for each amendment.

    Unless otherwise indicated, the Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these amendments. If the Commission has prepared an environmental assessment under the special circumstances provision in 10 CFR 51.22(b) and has made a determination based on that assessment, it is so indicated in the safety evaluation for the amendment.

    For further details with respect to each action, see the amendment and associated documents such as the Commission's letter and safety evaluation, which may be obtained using the ADAMS accession numbers indicated in the following table. The safety evaluation will provide the ADAMS accession numbers for the application for amendment and the Federal Register citation for any environmental assessment. All of these items can be accessed as described in the “Obtaining Information and Submitting Comments” section of this document.

    License Amendment Issuances

    Constellation FitzPatrick, LLC and Constellation Energy Generation, LLC; James A. FitzPatrick Nuclear Power Plant; Oswego County, NY
    Docket No 50-333.
    Amendment Date September 4, 2024.
    ADAMS Accession No ML24165A038.
    Amendment No 356.
    Brief Description of Amendment The amendment revised the technical specifications to change the fuel handling accident analyses in support of the transition from the refuel bridge mast NF-400 ( i.e., triangular mast) to the new NF-500 mast.
    Public Comments Received as to Proposed NSHC (Yes/No) No.
    Entergy Operations, Inc.; Arkansas Nuclear One, Unit 2; Pope County, AR
    Docket No 50-368.
    Amendment Date October 4, 2024.
    ADAMS Accession No ML24185A260.
    Amendment No 335.
    Brief Description of Amendment The amendment corrected three typographical errors to Arkansas Nuclear One, Unit 2 (ANO-2) Technical Specification (TS) 6.5.18, “Surveillance Frequency Control Program,” and TS 6.6.8, “Specific Activity,” which were inadvertently introduced into the ANO-2 TSs by License Amendments Nos. 315 (ML19063B948) and 326 (ML21313A008).
    ( print page 85998)
    Public Comments Received as to Proposed NSHC (Yes/No) No.
    Nebraska Public Power District; Cooper Nuclear Station; Nemaha County, NE
    Docket No 50-298.
    Amendment Date October 8, 2024.
    ADAMS Accession No ML24250A205.
    Amendment No 278.
    Brief Description of Amendment The amendment revised Technical Specification (TS) Table 3.3.2.1-1, “Control Rod Block Instrumentation,” to reference the core operating limits report and added a reference to TS 5.6.5, “Core Operating Limits Report (COLR).”
    Public Comments Received as to Proposed NSHC (Yes/No) No.
    NextEra Energy Seabrook, LLC; Seabrook Station, Unit No. 1; Rockingham County, NH
    Docket No 50-443.
    Amendment Date September 20, 2024.
    ADAMS Accession No ML24239A538.
    Amendment No 175.
    Brief Description of Amendment The amendment modified technical specification limiting condition for operation (LCO) 3.8.1.1, “A.C. Sources—Operating,” by increasing the allowed outage time for an inoperable offsite circuit from 72 hours (3 days) to 240 hours (10 days). The change allowed Seabrook Station, Unit No. 1, to change plant modes from Cold Shutdown (MODE 5) to Startup (MODE 2) to support the replacement of the main generator breaker and outage startup activities while one independent circuit between the offsite transmission network and the onsite Class 1E Distribution System is out of service.
    Public Comments Received as to Proposed NSHC (Yes/No) No.
    Nine Mile Point Nuclear Station, LLC and Constellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Units 1 and 2; Oswego County, NY
    Docket Nos 50-220, 50-410.
    Amendment Date September 26, 2024.
    ADAMS Accession No ML24190A001.
    Amendment Nos 252 (Unit 1), 197 (Unit 2).
    Brief Description of Amendments The amendments removed the Nine Mile Point 3 Nuclear Project, LLC, (NMP3) designation from the NMP1 and NMP2 technical specifications (TSs) which is not applicable to the current design features of the NMP site. Specifically, Section 5.0, “Design Features,” (Section 5.1, “Site” and Figure 5.1-1) in the NMP1 Technical Specifications (TSs) and Section 4.0, “Design Features,” (Figure 4.1-1) in the NMP2 TS is revised to reflect as the TSs were at the time Constellation Energy Nuclear Group, LLC, the previous owners of NMP1 and NMP2, were pursuing a combined license for NMP3. Additionally, the name “Entergy Nuclear FitzPatrick, LLC” is revised in NMP1 TS Figure 5.1-1 and NMP2 TS Figure 4.1-1 to “Constellation FitzPatrick, LLC,” to reflect the current owner for the James A. FitzPatrick nuclear power plant site.
    Public Comments Received as to Proposed NSHC (Yes/No) No.
    Northern States Power Company; Monticello Nuclear Generating Plant; Wright County, MN
    Docket No 50-263.
    Amendment Date October 1, 2024.
    ADAMS Accession No ML24199A175.
    Amendment No 212.
    Brief Description of Amendment The amendment revised Technical Specification 3.8.6, “Battery Parameters,” Surveillance Requirement 3.8.6.6, acceptance criteria for the capacity of the 125-volt direct current batteries.
    Public Comments Received as to Proposed NSHC (Yes/No) No.
    Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Goodhue County, MN
    Docket Nos 50-282, 50-306.
    Amendment Date September 27, 2024.
    ADAMS Accession No ML24221A362.
    Amendment Nos 245 (Unit 1), 233 (Unit 2).
    Brief Description of Amendments The amendments revised Technical Specification 3.8.1, AC [Alternating Current] Sources—Operating and Surveillance Requirement 3.8.1.2, Note 3, to remove details of a modified diesel generator start and reference to manufacturer's recommendations.
    Public Comments Received as to Proposed NSHC (Yes/No) No.
    ( print page 85999)
    Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1; Coffey County, KS
    Docket No 50-482.
    Amendment Date September 17, 2024.
    ADAMS Accession No ML24199A171.
    Amendment No 241.
    Brief Description of Amendment The amendment revised Technical Specification 5.5.11.b for the Ventilation Filter Testing Program by changing the testing requirements for the in place test of the charcoal absorber penetration and system bypass.
    Public Comments Received as to Proposed NSHC (Yes/No) No.

Document Information

Published:
10/29/2024
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Monthly notice.
Document Number:
2024-24963
Dates:
Comments must be filed by November 29, 2024. A request for a hearing or petitions for leave to intervene must be filed by December 30, 2024. This monthly notice includes all amendments issued, or proposed to be issued, from September 13, 2024, to October 10, 2024. The last monthly notice was published on October 1, 2024.
Pages:
85994-85999 (6 pages)
Docket Numbers:
NRC-2024-0187
PDF File:
2024-24963.pdf