95-24488. Transcontinental Gas Pipe Line Corp.; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 60, Number 191 (Tuesday, October 3, 1995)]
    [Notices]
    [Page 51788]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-24488]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. TM96-2-29-000]
    
    
    Transcontinental Gas Pipe Line Corp.; Notice of Proposed Changes 
    in FERC Gas Tariff
    
    September 27, 1995.
        Take notice that on September 22, 1995, Transcontinental Gas Pipe 
    Line Corporation (Transco) tendered for filing certain revised tariff 
    sheets to its FERC Gas Tariff Third Revised Volume No. 1 enumerated in 
    Appendix A attached to the filing.
        Transco states that the instant filing is submitted pursuant to 
    Section 44 of the General Terms and Conditions of Transco's Volume No. 
    1 Tariff which provides that Transco will reflect in its rates the 
    costs incurred for the transportation and compression of gas by others 
    (hereinafter ``TBO''). Section 44 provides that Transco will file to 
    reflect net changes in its TBO rates at least 30 days prior to the 
    November 1 effective date of each annual TBO filing. Transco states 
    that Appendix B attached to the filing, sets forth Transco's estimated 
    TBO demand costs for the period November 1, 1995 through October 31, 
    1996, and the derivation of the TBO unit rate reflected on the tariff 
    sheets included in Appendix A.
        Transco states that it is serving copies of the instant filing to 
    its customers, State Commissions and other interested parties.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, NE., Washington, DC. 
    20426, in accordance with Sections 385.214 and 385.211 of the 
    Commission's Rules and Regulations. All such motions or protests should 
    be filed on or before October 4, 1995. Protests will be considered by 
    the Commission in determining the appropriate action to be taken, but 
    will not serve to make protestants parties to the proceedings. Any 
    person wishing to become a party must file a motion to intervene. 
    Copies of this filing are on file with the Commission and are available 
    for public inspection in the Public Reference Room.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-24488 Filed 10-2-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
10/03/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-24488
Pages:
51788-51788 (1 pages)
Docket Numbers:
Docket No. TM96-2-29-000
PDF File:
95-24488.pdf