95-24499. Transcontinental Gas Pipe Line Corp.; Notice of Proposed Changes in FERC Gas Tariff
[Federal Register Volume 60, Number 191 (Tuesday, October 3, 1995)]
[Notices]
[Page 51790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-24499]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. GT95-62-000]
Transcontinental Gas Pipe Line Corp.; Notice of Proposed Changes
in FERC Gas Tariff
September 27, 1995.
Take notice that on September 22, 1995 Transcontinental Gas Pipe
Line Corporation (Transco) tendered for filing to become part of its
FERC Gas Tariff, Third Revised Volume No. 1, certain revised tariff
sheets in Appendix A attached to the filing. The proposed effective
date of such tariff sheets is November 1, 1995.
Transco states that the purpose of the instant filing is to
terminate Section 7(c) firm transportation service under Rate Schedule
FT-NT and to convert such service to service provided under Rate
Schedule FT pursuant to Transco's blanket transportation certificate
and Part 284 of the Commission's regulations effective November 1,
1995.
Transco states that the rates applicable to the converted services
are the generally applicable charges under Rate Schedule FT (including
fuel), plus reservation and commodity rate surcharges as set forth on
Sheet No. 40D to Transco's Third Revised Volume No. 1 Tariff. Sheet No.
40D sets forth the charges applicable to FT-NT annual firm
transportation service which has been converted from individually
certificated Section 7(c) firm transportation service to service under
Transco's blanket certificate and Part 284 of the Commission's
regulations.
Transco states that copies of the filing are being mailed to NUI,
Piedmont, NAU and interested State Commissions.
Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Sections 385.214 and 385.211 of the
Commission's Rules and Regulations. All such motions or protests should
be filed on or before October 4, 1995. Protests will be considered by
the Commission in determining the appropriate action to be taken, but
will not serve to make protestants parties to the proceedings. Any
person wishing to become a party must file a motion to intervene.
Copies of this filing are on file with the Commission and are available
for public inspection in the Public Reference Room.
Lois D. Cashell,
Secretary.
[FR Doc. 95-24499 Filed 10-2-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/03/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-24499
- Pages:
- 51790-51790 (1 pages)
- Docket Numbers:
- Docket No. GT95-62-000
- PDF File:
-
95-24499.pdf