95-24527. Drawbridge Operation Regulations; Mullica River, NJ  

  • [Federal Register Volume 60, Number 191 (Tuesday, October 3, 1995)]
    [Rules and Regulations]
    [Page 51732]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-24527]
    
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF TRANSPORTATION
    33 CFR Part 117
    
    [CGD05 94-093]
    
    
    Drawbridge Operation Regulations; Mullica River, NJ
    
    AGENCY: Coast Guard, DOT.
    
    ACTION: Final rule.
    
    -----------------------------------------------------------------------
    
    SUMMARY: At the request of Burlington County, the Coast Guard is 
    changing the regulations governing the Lower Bank bridge over the 
    Mullica River at mile 15.0 between Atlantic and Burlington Counties, 
    New Jersey. This change will extend the period during the winter months 
    to include April when a four-hour advance notice for all bridge 
    openings is required. This change is being made because there have been 
    few requests for bridge openings during this time period.
    
    EFFECTIVE DATE: November 2, 1995.
    
    FOR FURTHER INFORMATION CONTACT:
    Mr. G. Kassof, Bridge Administrator--NY, Fifth Coast Guard District 
    (212) 668-7069.
    
    SUPPLEMENTARY INFORMATION: 
    
    Drafting Information
    
        The principal persons involved in drafting this document are Mr. J. 
    Arca, Fifth Coast Guard District, Bridge Branch-NY, Project Manager, 
    and CAPT R. A. Knee, Fifth Coast Guard District Legal Office, Project 
    Counsel.
    
    Regulatory History
    
        On February 13, 1995, the Coast Guard published a Notice of 
    Proposed Rulemaking entitled ``Drawbridge Operation Regulations, 
    Mullica River, New Jersey'' in the Federal Register (60 FR 8209). The 
    comment period ended May 15, 1995. The Coast Guard received one comment 
    on the notice of proposed rulemaking supporting the Coast Guard's 
    proposed change to the regulations. A public hearing was not requested, 
    and one was not held.
    
    Background and Purpose
    
        The Lower Bank highway bascule bridge over the Mullica River in 
    Lower Bank, New Jersey, was replaced in 1993. The present bridge has a 
    vertical clearance of 13 feet above mean high water (MHW) in the closed 
    position which is 4 feet higher than the previous bridge. During the 
    period from December 1993 through April 1994, a period of 151 days, the 
    bridge opened on request on only 34 days. The current operating 
    regulations implemented in January 1988 require the Lower Bank bridge 
    to open on signal, except from April 1 through November 30 from 11 p.m. 
    to 7 a.m., and from December 1 through March 31 from 4:30 p.m. to 8 
    a.m., a 4-hour advance notice is required for a bridge opening. This 
    change to the regulations will include April in the winter seasonal 
    restrictions and increase the 4-hour advance notice requirement to 
    apply to all requests for bridge openings from December through April. 
    This change will provide the bridge owner with relief from constantly 
    having a person available to open the bridge at times when openings are 
    not needed.
    
    Regulatory Evaluation
    
        This rule is not a significant regulatory action under section 3(f) 
    of Executive Order 12866 and does not require an assessment of 
    potential costs and benefits under section 6(a)(3) of that order. It 
    has been exempted from review by the Office of Management and Budget 
    under that order. It is not significant under the regulatory policies 
    and procedures of the Department of Transportation (DOT) (44 FR 11040; 
    February 26, 1979). The Coast Guard expects the economic impact of this 
    rule to be so minimal that a full Regulatory Evaluation under paragraph 
    10e of the regulatory policies and procedures of DOT is unnecessary. 
    This conclusion is based on the fact that the regulation will not 
    prevent mariners from passing through the Lower Bank Bridge, but will 
    require mariners to provide a 4-hour advance notice of their arrival 
    from May 1 through November 30 between 11 p.m. and 7 a.m., and from 
    December 1 to April 30 at all times. At all other times, the bridge 
    will open on signal.
    
    Small Entities
    
        Under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.), the 
    Coast Guard must consider whether this final rule will have a 
    significant economic impact on a substantial number of small entities. 
    ``Small entities'' include independently owned and operated small 
    businesses that are not dominant in their fields and that otherwise 
    qualify as ``small business concerns'' under section 3 of the Small 
    Business Act (15 U.S.C. 632). Because it expects the impact of this 
    rule to be minimal, the Coast Guard certifies under 5 U.S.C. 605(b) 
    that this rule will not have a significant economic impact on a 
    substantial number of small entities.
    
    Collection of Information
    
        This rule contains no collection of information requirements under 
    the Paperwork Reduction Act (44 U.S.C. 3501 et seq.).
    
    Federalism
    
        The Coast Guard has analyzed this rule under the principles and 
    criteria contained in Executive Order 12612 and it has determined that 
    this rule does not have sufficient federalism implications to warrant 
    preparation of a Federalism Assessment.
    
    Environment
    
        The Coast Guard considered the environmental impact of this rule 
    and concluded that, under section 2.B.2.e. (32)(e) of Commandant 
    Instruction M16475.1B (as amended, 59 FR 38654, 29 July 1994), this 
    rule is categorically excluded from further environmental 
    documentation. A Categorical Exclusion Determination statement has been 
    prepared and placed in the rulemaking docket.
    
    List of Subjects in 33 CFR Part 117
    
        Bridges.
    
        In consideration of the foregoing, the Coast Guard is amending part 
    117 of Title 33, Code of Federal Regulations to read as follows:
    
    PART 117--DRAWBRIDGE OPERATION REGULATIONS
    
        1. The authority citation for Part 117 continues to read as 
    follows:
    
        Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 CFR 1.05-1(g).
    
        2. In section 117.731a paragraph (a) is revised to read as follows:
    
    
    Sec. 117.731a  Mullica River.
    
    * * * * *
        (a) The draw of the Lower Bank bridge, mile 15.0, need not open 
    during the following periods unless at least four hours notice is 
    given:
        (1) From May 1 through November 30, from 11 p.m. to 7 a.m.
        (2) From December 1 through April 30, at all times.
    * * * * *
        Dated: September 14, 1995.
    W.J. Ecker,
    Rear Admiral, U.S. Coast Guard, Commander, Fifth Coast Guard District.
    [FR Doc. 95-24527 Filed 10-2-95; 8:45 am]
    BILLING CODE 4910-14-M
    
    

Document Information

Effective Date:
11/2/1995
Published:
10/03/1995
Department:
Transportation Department
Entry Type:
Rule
Action:
Final rule.
Document Number:
95-24527
Dates:
November 2, 1995.
Pages:
51732-51732 (1 pages)
Docket Numbers:
CGD05 94-093
PDF File:
95-24527.pdf
CFR: (1)
33 CFR 117.731a