02-25122. Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, Protests, Recommendations, and Terms and Conditions
-
Start Preamble
September 27, 2002.
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:
a. Type of Application: Conduit Exemption.
b. Project No.: 12374-000.
c. Date filed: September 17, 2002.
d. Applicant: Kane County Water Conservancy District.Start Printed Page 62053
e. Name of Project: Orderville Hydroelectric Facility.
f. Location: The project would be located on the existing Orderville Pressurized Irrigation Line in Kane County, Utah. The Irrigation Line diverts water from the East Fork Virgin River. The project would not occupy federal or tribal lands.
g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Michael E. Noel, Kane County Water Conservancy District, 981 South Vermillion Drive, Kanab, UT 84741, (801) 644-3996.
i. FERC Contact: James Hunter, (202) 502-6086.
j. Status of Environmental Analysis: This application is ready for environmental analysis at this time—see the following paragraphs about filing responsive documents.
k. Deadline for filing comments, protests, and motions to intervene: October 28, 2002.
All documents (original and eight copies) should be filed with: Magalie R. Salas, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. Comments, protests, and interventions may be filed electronically via the Internet in lieu of paper; see 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's web site under the “e-Filing” link. The Commission strongly encourages electronic filings. Please include the project number (P-12374-000) on any comments or motions filed.
The Commission's Rules of Practice and Procedure require all interveners filing documents with the Commission to serve a copy of that document on each person in the official service list for the project. Further, if an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
l. Description of Project: The project would involve construction of a 75-foot by 75-foot powerhouse containing a 200-kilowatt generating unit at the end of the pressurized pipeline and a tailrace returning flows used for generation to the East Fork Virgin River. The average annual generation would be 897,000 kilowatthours.
m. This filing is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website at http://www.ferc.gov using the “FERRIS” link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, call (202) 502-8222 or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the address in item h. above.
n. Development Application—Any qualified applicant desiring to file a competing application must submit to the Commission, on or before the specified deadline date for the particular application, a competing development application, or a notice of intent to file such an application. Submission of a timely notice of intent allows an interested person to file the competing development application no later than 120 days after the specified deadline date for the particular application. Applications for preliminary permits will not be accepted in response to this notice.
o. Notice of Intent—A notice of intent must specify the exact name, business address, and telephone number of the prospective applicant, and must include an unequivocal statement of intent to submit, if such an application may be filed, either a preliminary permit application or a development application (specify which type of application). A notice of intent must be served on the applicant(s) named in this public notice.
p. Protests or Motions to Intervene—Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 385.211, and 385.214. In determining the appropriate action to take, the Commission will consider all protests filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified deadline date for the particular application.
q. Filing and Service of Responsive Documents—The application is ready for environmental analysis at this time, and the Commission is requesting comments, reply comments, recommendations, terms and conditions, and prescriptions.
r. The Commission directs, pursuant to Section 4.34(b) of the Regulations (see Order No. 533 issued May 8, 1991, 56 FR 23108, May 20, 1991) that all comments, recommendations, terms and conditions and prescriptions concerning the application be filed with the Commission within 30 days from the issuance date of this notice. All reply comments must be filed with the Commission within 45 days from the date of this notice.
s. All filings must (1) bear in all capital letters the title “PROTEST”, “MOTION TO INTERVENE”, “NOTICE OF INTENT TO FILE COMPETING APPLICATION,” “COMPETING APPLICATION,” “COMMENTS,” “REPLY COMMENTS,” “RECOMMENDATIONS,” “TERMS AND CONDITIONS,” or “PRESCRIPTIONS;” (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. All comments, recommendations, terms and conditions or prescriptions must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b). Agencies may obtain copies of the application directly from the applicant. Any of these documents must be filed by providing the original and the number of copies required by the Commission's regulations to: The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426. An additional copy must be sent to Director, Division of Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at the above address. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application. A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Start SignatureLinwood A. Watson, Jr.
Deputy Secretary.
[FR Doc. 02-25122 Filed 10-2-02; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Published:
- 10/03/2002
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 02-25122
- Pages:
- 62052-62053 (2 pages)
- EOCitation:
- of 2002-09-27
- PDF File:
- 02-25122.pdf