02-25190. Drawbridge Operation Regulations; Gasparilla Island Causeway Swingbridge, Gulf Intracoastal Waterway, Boca Grande, Charlotte County, FL  

  • Start Preamble

    AGENCY:

    Coast Guard, DOT.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, Seventh Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Gasparilla Island Causeway Swingbridge, across the Gulf Intracoastal Waterway, mile 34.3, at Boca Grande, Florida. This deviation allows the bridge to remain in the closed position from 7 p.m. on October 14, 2002, until 7 a.m. on October 15, 2002, and from 7 p.m. on October 15, 2002 until 7 a.m. on October 16, 2002. This temporary deviation is required to allow the bridge owner to safely complete emergency replacement of the bridge couplings.

    DATES:

    This deviation is effective from 7 p.m. on October 14, 2002 until 7 a.m. on October 16, 2002.

    ADDRESSES:

    Material received from the public, as well as documents indicated in this preamble as being available in the docket [CGD07-02-120] will become part of this docket and will be available for inspection or copying at Commander (obr), Seventh Coast Guard District, 909 S.E. 1st Avenue, Room 432, Miami, FL 33131 between 7:30 a.m. and 4 p.m., Monday through Friday, except Federal holidays.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Mr. Barry Dragon, Project Officer, Seventh Coast Guard District, Bridge Section at (305) 415-6743.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The existing regulations for the Gasparilla Island Causeway Swingbridge in 33 CFR Start Printed Page 61988117.287(a-1), requires the swingbridge to open on signal; except that from January 1 to May 31, from 7 a.m. to 5 p.m., the draw need open only on the hour, quarter hour, half hour, and three quarter hour.

    The Gasparilla Island Bridge Authority notified the Coast Guard on September 13, 2002 that they needed to close the bridge to vessel traffic for two twelve hour periods to effect emergency replacement of the couplings. The Commander, Seventh Coast Guard District has granted a temporary deviation from the operating requirements listed in 33 CFR 117.287(a-1) to complete repairs to the swingbridge. Under this deviation, the Gasparilla Island Causeway Swingbridge, mile 34.3 at Boca Grande, need not open to vessel traffic, from 7 p.m. on October 14, 2002 until 7 a.m. on October 15, 2002 and from 7 p.m. on October 15, 2002 until 7 a.m. on October 16, 2002.

    Start Signature

    Dated: September 26, 2002.

    Greg Shapley,

    Chief, Bridge Administration Branch, Seventh Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. 02-25190 Filed 10-2-02; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Effective Date:
10/14/2002
Published:
10/03/2002
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
02-25190
Dates:
This deviation is effective from 7 p.m. on October 14, 2002 until 7 a.m. on October 16, 2002.
Pages:
61987-61988 (2 pages)
Docket Numbers:
CGD07-02-120
PDF File:
02-25190.pdf
CFR: (1)
33 CFR 117