95-26807. Wisconsin Electric Power Company; Point Beach Nuclear Plant, Units 1 and 2 Correction to Notice of Exemption
[Federal Register Volume 60, Number 209 (Monday, October 30, 1995)]
[Notices]
[Page 55287]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-26807]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-266 and 50-301]
Wisconsin Electric Power Company; Point Beach Nuclear Plant,
Units 1 and 2 Correction to Notice of Exemption
On July 24, 1995, the Federal Register published the Notice of
Exemption from certain technical requirements of Appendix R to 10 CFR
Part 50 for Point Beach Nuclear Power, Units 1 and 2. On page 37909,
the fifth sentence in the third full paragraph in the third column
incorrectly refers to cable tray GCO1-O2 instead of cable tray GGO1-O4.
On page 37910, the second sentence in the second full paragraph in the
second column incorrectly states the separation between the steam-
driven auxiliary feedwater pumps as 29 feet instead of 44 feet. These
corrections do not impact the findings providing the basis for granting
the exemption.
Dated at Rockville, Maryland, this 24th day of October 1995.
For the Nuclear Regulatory Commission.
Allen G. Hansen,
Project Manager, Project Directorate III-3, Division of Reactor
Projects III/IV, Office of Nuclear Reactor Regulation.
[FR Doc. 95-26807 Filed 10-27-95; 8:45 am]
BILLING CODE 7590-01-P
Document Information
- Published:
- 10/30/1995
- Department:
- Nuclear Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 95-26807
- Pages:
- 55287-55287 (1 pages)
- Docket Numbers:
- Docket Nos. 50-266 and 50-301
- PDF File:
-
95-26807.pdf