95-26807. Wisconsin Electric Power Company; Point Beach Nuclear Plant, Units 1 and 2 Correction to Notice of Exemption  

  • [Federal Register Volume 60, Number 209 (Monday, October 30, 1995)]
    [Notices]
    [Page 55287]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-26807]
    
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket Nos. 50-266 and 50-301]
    
    
    Wisconsin Electric Power Company; Point Beach Nuclear Plant, 
    Units 1 and 2 Correction to Notice of Exemption
    
        On July 24, 1995, the Federal Register published the Notice of 
    Exemption from certain technical requirements of Appendix R to 10 CFR 
    Part 50 for Point Beach Nuclear Power, Units 1 and 2. On page 37909, 
    the fifth sentence in the third full paragraph in the third column 
    incorrectly refers to cable tray GCO1-O2 instead of cable tray GGO1-O4. 
    On page 37910, the second sentence in the second full paragraph in the 
    second column incorrectly states the separation between the steam-
    driven auxiliary feedwater pumps as 29 feet instead of 44 feet. These 
    corrections do not impact the findings providing the basis for granting 
    the exemption.
    
        Dated at Rockville, Maryland, this 24th day of October 1995.
    
        For the Nuclear Regulatory Commission.
    Allen G. Hansen,
    Project Manager, Project Directorate III-3, Division of Reactor 
    Projects III/IV, Office of Nuclear Reactor Regulation.
    [FR Doc. 95-26807 Filed 10-27-95; 8:45 am]
    BILLING CODE 7590-01-P
    
    

Document Information

Published:
10/30/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-26807
Pages:
55287-55287 (1 pages)
Docket Numbers:
Docket Nos. 50-266 and 50-301
PDF File:
95-26807.pdf