DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Environmental Impact Statement: Ketchikan, Alaska
AGENCY: Federal Highway Administration (FHWA), Department of
Transportation (DOT).
ACTION: Cancellation of Notice of Intent to prepare an environmental
impact statement. Reference: Federal Register, Volume 54, Number 90,
Thursday, May 11, 1989.
-----------------------------------------------------------------------
SUMMARY: The FHWA is issuing this notice to inform the public that an
environmental impact statement (EIS) will not be prepared for the
proposed upgrading of the Ketchikan transportation system from Ward
Cove to Deermount Street. The scope of the proposed improvements has
been significantly reduced. An EIS will not be prepared because
significant environment impacts should not result from this project.
FOR FURTHER INFORMATION CONTACT:
Phillip Smith, Field Operations Engineer, Federal Highway
Administration, P.O. Box 021648, Juneau, AK 99802-1648 or; William F.
Ballard, Regional Environmental Coordinator, Alaska Department of
Transportation and Public Facilities (ADOT&PF), 6860 Glacier Highway,
Juneau, AK 99801-7999.
SUPPLEMENTARY INFORMATION: The new project scope involves improvements
along Tongass Avenue between the Airport Ferry Terminal and Deermount
Street, rehabilitation and reconstruction of viaduct sections along
Tongass Avenue including realignment of the S-Curve, and installation
of traffic signals and underground utilities. In addition to the
improvements on Tongass Avenue, the project would construct a two lane
road connecting the existing Third Avenue with Schoenbar Road. This
will enable drivers and bicyclists to avoid a portion of Tongass
Avenue, which will relieve congestion.
This revised proposal is based on written comments and the results
of public meetings held from May, 1989, to March 1993 regarding the
proposed project. Members of the public and agency representatives
discussed potential alternatives and identified relevant issues at
these meetings. Input received indicates that there is not strong
support at this time for additional improvements to Tongass Avenue and
North Tongass Highway. The revised scope adequately meets the stated
need. And Environmental Assessment/Draft Section 4(f) Evaluation will
be available for review in late 1994.
Issued on: October 12, 1994.
Robert E. Ruby,
Division Administrator, Federal Highway Administration, Juneau, Alaska.