Altresco Pittsfield, L.P., et al.; Electric Rate and Corporate
Regulation Filings
October 24, 1994.
Take notice that the following filings have been made with the
Commission:
1. Altresco Pittsfield, L.P.
[Docket No. EG95-4-000]
On October 11, 1994, Altresco Pittsfield, L.P. (``Altresco''), with
its address at One Bowdoin Square, Boston MA 02114, filed with the
Federal Energy Regulatory Commission (the ``Commission'') an
application for determination of exempt wholesale generator status
pursuant to part 365 of the Commission's regulations.
Altresco is the lessee and operator of an approximately 165 MW
(net) gas-fired cogeneration facility (the ``Facility'') located in
Pittsfield, Massachusetts. The Facility commenced commercial operation
in September, 1990. Altresco will sell all of the electric energy
produced by the Facility at wholesale. Electric energy produced by the
Facility is sold to New England Power Company, Commonwealth Electric
Company and Cambridge Electric Light Company.
Comment date: November 14, 1994, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
2. Nevada Power Company
[Docket No. EL92-41-002]
Take notice that on September 30, 1994, Nevada Power Company
tendered for filing a revised copy of its refund report in the above-
referenced docket.
Comment date: November 7, 1994, in accordance with Standard
Paragraph E at the end of this notice.
3. Midwest Power Systems, Inc.
[Docket No. ER94-985-000]
Take notice that on October 5, 1994, Midwest Power Systems, Inc.
tendered for filing Amendment No. 2 to the Electric Interchange and
Interconnection Agreement with Indianola Waterworks.
Comment date: November 7, 1994, in accordance with Standard
Paragraph E at the end of this notice.
4. New England Power Company
[Docket No. ER94-1155-000]
Take notice that on October 17, 1994, New England Power Company
tendered for filing an amendment to its April 14, 1994, filing in the
above-referenced docket.
Comment date: November 7, 1994, in accordance with Standard
Paragraph E at the end of this notice.
5. LG&E Power Marketing, Inc.
[Docket No. ER94-1188-002]
Take notice that on October 11, 1994, LG&E Power Marketing, Inc.
(LG&E) filed certain information as required by the Commission's August
19, 1994, order in Docket No. ER94-1188-000. Copies of LG&G's
informational filing are on file with the Commission and are available
for public inspection.
6. Camelot Energy Services
[Docket No. ER94-1457-001]
Take notice that on October 11, 1994, Camelot Energy Services (CES)
filed certain information as required by the Commission's September 30,
1994, letter order in Docket No. ER94-1457-000. Copies of CES's
informational filing are on file with the Commission and are available
for public inspection.
7. Central Maine Power Company
[Docket No. ER94-1669-000]
Take notice that on October 17, 1994, Central Maine Power Company
(CMP), tendered for filing supplemental information in support of a
Power Purchase Agreement between CMP and Unnamed Subsidiary, under
which CMP will purchase and Subsidiary will sell all of the energy and
capacity from a 32 MW biomass-fueled generating facility located in the
Town of Fort Fairfield, Maine. CMP now provides supplemental
information containing a formula for determining the Capacity Charge
component of the rate.
Comment date: November 7, 1994, in accordance with Standard
Paragraph E at the end of this notice.
8. Virginia Electric and Power Company
[Docket No. ER95-37-000]
Take notice that on October 14, 1994, Virginia Electric and Power
Company (Virginia Power) tendered for filing a Service Agreement
between AES Power, Inc. and Virginia Power, dated September 27, 1994,
under the Power Sales Tariff to Eligible Purchasers dated May 27, 1994.
Under the tendered Service Agreement Virginia Power agrees to provide
services to AES Power, Inc. under the rates, terms and conditions of
the Power Sales Tariff as agreed by the parties pursuant to the terms
of the applicable Service Schedules included in the Power Sales Tariff.
Copies of the filing were served upon the Virginia State
Corporation Commission and the North Carolina Utilities Commission.
Comment date: November 7, 1994, in accordance with Standard
Paragraph E at the end of this notice.
9. Virginia Electric and Power Company
[Docket No. ER95-38-000]
Take notice that on October 14, 1994, Virginia Electric and Power
Company (Virginia Power) tendered for filing a Service Agreement
between Ohio Edison and Virginia Power, dated September 20, 1994, under
the Power Sales Tariff to Eligible Purchasers dated May 27, 1994. Under
the tendered Service Agreement Virginia Power agrees to provide
services to Ohio Edison under the rates, terms and conditions of the
Power Sales Tariff as agreed by the parties pursuant to the terms of
the applicable Service Schedules included in the Power Sales Tariff.
Copies of the filing were served upon the Virginia State
Corporation Commission and the North Carolina Utilities Commission.
Comment date: November 7, 1994, in accordance with Standard
Paragraph E at the end of this notice.
10. Douglas M. Costle
[Docket No. ID-2855-000]
Take notice that on October 11, 1994, Douglas M. Costle (Applicant)
tendered for filing an application under section 305(b) of the Federal
Power Act to hold the following positions:
Director--Niagara Mohawk Power Corporation
Director--Air & Water Technologies Corporation
Comment date: November 10, 1994, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.