95-26917. C.C. Pace Energy Services, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 60, Number 210 (Tuesday, October 31, 1995)]
    [Notices]
    [Pages 55374-55376]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-26917]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. ER94-1181-005, et al.]
    
    
    C.C. Pace Energy Services, et al.; Electric Rate and Corporate 
    Regulation Filings
    
    October 23, 1995
        Take notice that the following filings have been made with the 
    Commission:
    
    1. C.C. Pace Energy Services
    
    [Docket No. ER94-1181-005]
    
        Take notice that on October 18, 1995, C.C. Pace Energy Services, 
    Inc. filed certain information as required by the Commission's order 
    dated July 25, 1994, in Docket No. ER94-1181-000. Copies of C.C. Pace 
    Energy Services, Inc.'s informational filing are on file with the 
    Commission and are available for public inspection.
    
    2. Ashton Energy Corporation
    
    [Docket No. ER94-1246-005]
    
        Take notice that on October 10, 1995, Ashton Energy Corporation 
    (Ashton Energy) filed certain information as required by the 
    Commission. Copies of Ashton Energy's informational filing are on file 
    with the Commission and are available for public inspection.
    
    3. AIG Trading Corporation
    
    [Docket No. ER94-1691-007]
    
        Take notice that on October 10, 1995, AIG Trading Corporation (AIG) 
    filed certain information as required by the Commission's January 19, 
    1995, order in Docket No. ER94-1691-000. Copies of AIG's informational 
    filing are on file with the Commission and are available for public 
    inspection.
    
    4. KCS Power Marketing, Inc.
    
    [Docket No. ER95-208-003]
    
        Take notice that on October 11, 1995, KCS Power Marketing, Inc. 
    (KPM) filed certain information as required by the Commission's March 
    2, 1995, order in Docket No. ER95-208-000. Copies of KPM's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    5. Wilson Power & Gas Smart, Inc.
    
    [Docket No. ER95-751-003]
    
        Take notice that on October 10, 1995, Wilson Power & Gas Smart, 
    Inc. filed certain information as required by the Commission's letter 
    order dated April 25, 1995, in Docket No. ER95-751-000. Copies of 
    Wilson Power & Gas Smart Inc.'s informational filing are on file with 
    the Commission and are available for public inspection.
    
    6. Delhi Energy Services, Inc.
    
    [Docket No. ER95-940-002]
    
        Take notice that on October 18, 1995, Delhi Energy Services, Inc. 
    (Delhi) filed certain information as required by the Commission's order 
    dated June 1, 1995, in Docket No. ER95-940-000. Copies of Delhi's 
    informational filing are on file with the Commission and are available 
    for public inspection.
    
    7. Southwestern Public Service Company
    
    [Docket No. ER95-1138-002]
    
        Take notice that on October 2, 1995, Southwestern Public Service 
    Company tendered for filing a compliance filing in the above-referenced 
    docket. Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Cleveland Electric Illuminating Company
    
    [Docket No. ER95-1194-001]
    
        Take notice that on October 12, 1995, Cleveland Electric 
    Illuminating Company tendered for filing revisions to the June 9, 1995, 
    filing in the above-referenced docket.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Virginia Electric and Power Company
    
    [Docket No. ER95-1383-002]
    
        Take notice that on October 13, 1995, Virginia Electric and Power 
    Company tendered for filing its refund report in the above-referenced 
    docket.
        Comment date: November 6, 1995, on accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Otter Tail Power Company
    
    [Docket No. ER95-1555-000]
    
        Take notice that on October 10, 1995, Otter Tail Power Company 
    tendered for filing an amendment in the above-referenced docket.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. USGen Power Services, L.P.
    
    [Docket No. ER95-1625-000]
    
        Take notice that on October 17, 1995, USGen Power Services, L.P. 
    filed an amendment to its application under Section 205 of the Federal 
    Power Act.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. New York State Electric & Gas Corporation
    
    [Docket No. ER95-1678-000]
    
        Take notice that on October 6, 1995, New York State Electric & Gas 
    Corporation tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Commonwealth Edison Company
    
    [Docket No. ER96-42-000]
    
        Take notice that on October 6, 1995, Commonwealth Edison Company 
    (ComEd) submitted a Service Agreement establishing InterCoast Power 
    Marketing Company (InterCoast) as a customer under the terms of ComEd's 
    Power Sales Tariff PS-1 (PS-1 Tariff). The Commission has previously 
    designated the PS-1 Tariff as FERC Electric Tariff, Original Volume No. 
    2.
        ComEd requests an effective date of September 6, 1995, and 
    accordingly seeks waiver of the Commission's requirements. Copies of 
    this filing were served upon InterCoast and the Illinois Commerce 
    Commission.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 55375]]
    
    
    14. Wisconsin Power and Light Company
    
    [Docket No. ER96-51-000]
    
        Take notice that on October 10, 1995, Wisconsin Power and Light 
    Company (WP&L), tendered for filing a signed Service Agreement under 
    WP&L's Bulk Power Tariff between itself and Engelhard Power Marketing, 
    Inc. WP&L respectfully requests a waiver of the Commission's notice 
    requirements, and an effective date of September 10, 1995.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Rochester Gas and Electric Corporation
    
    [Docket No. ER96-52-000]
    
        Take notice that on October 10, 1995, Rochester Gas and Electric 
    Corporation (RG&E), tendered for filing a Service Agreement for 
    acceptance by the Federal Energy Regulatory Commission (Commission) 
    between RG&E and Koch Power Service, Inc. The terms and conditions of 
    service under this Agreement are made pursuant to RG&E's FERC Electric 
    Rate Schedule, Original Volume I (Power Sales Tariff) acceptance by the 
    Commission in Docket No. ER94-1279. RG&E also has requested waiver of 
    the 60-day notice provision pursuant to 18 CFR 35.11.
        A copy of this filing has been served on the Public Service 
    Commission of the State of New York.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. MidAmerican Energy Company
    
    [Docket No. ER96-53-000]
    
        Take notice that on October 10, 1995, MidAmerican Energy Company 
    (MidAmerican) filed with the Commission a Service Agreement with 
    Electric Clearinghouse, Inc. (ECI) dated September 25, 1995, entered 
    into pursuant to Section 4.0 of MidAmerican's Point-to-Point 
    Transmission Service Tariff which was accepted for filing by the 
    Commission in Docket No. ER95-1542-000. MidAmerican requests an 
    effective date of September 25, 1995, for the Agreement with ECI, and 
    accordingly seeks a waiver of the Commission's notice requirement. 
    MidAmerican has served a copy of the filing on ECI, the Iowa Utilities 
    Board, the Illinois Commerce Commission and the South Dakota Public 
    Utilities Commission.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. MidAmerican Energy Company
    
    [Docket No. ER96-54-000]
    
        Take notice that on October 10, 1995, MidAmerican Energy Company 
    (MidAmerican) filed with the Commission an Umbrella Service Agreement 
    with Electric Clearinghouse, Inc. (ECI) dated September 25, 1995, 
    entered into pursuant to Section 4.0 of MidAmerican's Point-to-Point 
    Transmission Service Tariff which was accepted for filing by the 
    Commission in Docket No. ER95-1542-000.
        MidAmerican requests an effective date of September 25, 1995, and 
    accordingly seeks a waiver of the Commission's notice requirement. 
    MidAmerican has served a copy of the filing on ECI, the Iowa Utilities 
    Board, the Illinois Commerce Commission and the South Dakota Public 
    Utilities Commission.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Public Service Electric and Gas Company
    
    [Docket No. ER96-55-000]
    
        Take notice that on October 10, 1995, Public Service Electric and 
    Gas Company (PSE&G), tendered for filing an initial rate schedule to 
    provide fully interruptible transmission service to Englehard Power 
    Marketing, Inc., for delivery of non-firm wholesale electrical power 
    and associated energy output utilizing the PSE&G bulk power 
    transmission system.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Cinergy Services, Inc.
    
    [Docket No. ER96-56-000]
    
        Take notice that on October 10, 1995, Cinergy Services, Inc. 
    (CINERGY), tendered for filing on behalf of its operating companies, 
    The Cincinnati Gas & Electric Company (CG&E) and PSI Energy, Inc. 
    (PSI), an Electric Sales Agreement, dated September 1, 1995, between 
    CINERGY, CG&E, PSI and Central Illinois Light Company (CILCO).
        The Electric Sales Agreement provides for the following service 
    between CINERGY and CILCO.
    
    1. Service Schedule A--Emergency Service
    2. Service Schedule B--System Energy
    3. Service Schedule C--Negotiated Capacity and Energy
    
        CINERGY and CILCO have requested an effective date of November 1, 
    1995.
        Copies of the filing were served on Central Illinois Light Company, 
    the Illinois Commerce Commission, the Kentucky Public Service 
    Commission, Public Utilities Commission of Ohio and the Indiana Utility 
    Regulatory Commission.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. Allegheny Power Service Corporation on behalf of West Penn Power 
    Company
    
    [Docket No. ER96-57-000]
    
        Take notice that on October 10, 1995, Allegheny Power Service 
    Corporation, on behalf of West Penn Power Company, submitted Supplement 
    No. 5 to reduce rates for FERC Electric Tariff First Revised Volume No. 
    1. The annual rate decrease proposed in Supplement No. 5 results from a 
    March 1995 legislated reduction in the West Virginia Business & 
    Occupation Tax.
        Copies of the filing were served upon the jurisdictional customers 
    and the Public Utility Commission.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Allegheny Power Service Corporation, on behalf Monongahela Power 
    Company The Potomac Edison Company West Penn Power Company
    
    [Docket No. ER96-58-000]
    
        Take notice that on October 10, 1995, Allegheny Power Service 
    Corporation on behalf of Monongahela Power Company, The Potomac Edison 
    Company and West Penn Power Company (the APS Companies) filed a Network 
    Transmission Service Tariff and Point-to-Point Transmission Service 
    Tariff under which the APS Companies propose to offer open access 
    transmission services to eligible customers at cost-based rates. The 
    APS Companies propose a December 6, 1995, effective date. Sixty (60) 
    days following acceptance for filing of the Tariffs, the APS Companies 
    propose to cancel their Standard Transmission Service Rate Schedule. 
    APS will honor current reservations for service under the Rate Schedule 
    for the duration of each customer's reservation.
        Copies of the filing have been provided to the Public Utilities 
    Commission of Ohio, the Pennsylvania Public Utility Commission, the 
    Maryland Public Service Commission, the Virginia State Corporation 
    Commission, the West Virginia Public Service Commission, and all 
    affected parties.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice. 
    
    [[Page 55376]]
    
    
    22. Central Power and Light Company and West Texas Utilities Company
    
    [Docket No. ER96-61-000]
    
        Take notice that on October 11, 1995, Central Power and Light 
    Company (CPL) and West Texas Utilities Company (WTU) (jointly, ``the 
    Companies'') submitted a Transmission Service Agreement, dated 
    September 14, 1995, establishing NorAm Energy Services (``NorAm'') as a 
    customer under the terms of the ERCOT Coordination Transmission Service 
    Tariff.
        The Companies request an effective date of September 14, 1995, for 
    the service agreement. Accordingly, the Companies request waiver of the 
    Commission's notice requirements. Copies of this filing were served 
    upon NorAm and the Public Utility Commission of Texas.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Public Service Company of Oklahoma and Southwestern Electric Power 
    Company
    
    [Docket No. ER96-62-000]
    
        Take notice that on October 11, 1995, Public Service Company of 
    Oklahoma (PSO) and Southwestern Public Service Company (SWEPCO) 
    (jointly, ``the Companies'') submitted Transmission Service Agreements 
    establishing three new customers under the terms of the Companies' SPP 
    Interpool Transmission Service Tariff.
        The Companies request waiver of the Commission's notice 
    requirements. Copies of this filing were served upon the three 
    customers, the Public Utility Commission of Texas, and the Oklahoma 
    Corporation Commission.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Public Service Company of Oklahoma and Southwestern Electric Power 
    Company
    
    [Docket No. ER96-63-000]
    
        Take notice that on October 11, 1995, Public Service Company of 
    Oklahoma and Southwestern Public Service Company (collectively the 
    ``the Companies'') submitted a Transmission Service Agreement dated 
    September 28, 1995, establishing Rainbow Energy Marketing Corporation 
    (Rainbow) as a customer under the terms of the SPP Coordination 
    Transmission Service Tariff.
        The Companies request an effective date of September 28, 1995, for 
    the service agreement. Accordingly, the Companies request waiver of the 
    Commission's notice requirements. Copies of this filing were served 
    upon Rainbow, the Louisiana Public Service Commission, the Arkansas 
    Public Service Commission, and the Oklahoma Corporation Commission.
        A copy of the filing has been sent to Rainbow, the Louisiana Public 
    Service Commission, the Arkansas Public Service Commission and the 
    Oklahoma Corporation Commission.
        Comment date: November 6, 1995, in accordance this Standard 
    Paragraph E at the end of this notice.
    
    25. Central Power and Light Company and West Texas Utilities Company
    
    [Docket No. ER96-64-000]
    
        Take notice that on October 11, 1995, Central Power and Light 
    Company (CPL) and West Texas Utilities Company (WTU) (jointly ``the 
    Companies'') submitted Transmission Service Agreements establishing 
    three new customers under the terms of the ERCOT Interpool Transmission 
    Service Tariff.
        The Companies request waiver of the Commission's notice 
    requirements. Copies of this filing were served upon the three 
    customers and the Public Utility Commission of Texas.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. San Diego Gas & Electric Company
    
    [Docket No. ER96-65-000]
    
        Take notice that on October 11, 1995, San Diego Gas & Electric 
    Company (SDG&E) tendered for filing an Interchange Agreement 
    (Agreement) between SDG&E and Calpine Power Marketing Inc. (Calpine).
        SDG&E requests that the Commission allow the Agreement to become 
    effective on the 15th day of December 1995 or at the earliest date.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and Calpine.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. San Diego Gas & Electric Company
    
    [Docket No. ER96-66-000]
    
        Take notice that on October 11, 1995, San Diego Gas & Electric 
    Company (SDG&E) tendered for filing an Interchange Agreement 
    (Agreement) between SDG&E and the City of Needles, (Needles).
        SDG&E requests that the Commission allow the Agreement to become 
    effective on the 15th day of December 1995 or at the earliest date.
        Copies of this filing were served upon the Public Utilities 
    Commission of the State of California and Needles.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. PECO Energy Company
    
    [Docket No. ER96-67-000]
    
        Take notice that on October 11, 1995, PECO Energy Company (PECO) 
    filed a Service Agreement dated August 29, 1995, with Central Illinois 
    Public Service Company (CIPS) under PECO's FERC Electric Tariff 
    Original Volume No. 1 (Tariff). The Service Agreement adds CIPS as a 
    customer under the Tariff.
        PECO requests an effective date of September 15, 1995 for the 
    Service Agreement.
        PECO requests that copies of this filing have been supplied to CIPS 
    and to the Pennsylvania Public Utility Commission.
        Comment date: November 6, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C. 
    20426, in accordance with Rules 211 and 214 of the Commission's Rules 
    of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-26917 Filed 10-30-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
10/31/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-26917
Dates:
November 6, 1995, in accordance with Standard Paragraph E at the end of this notice.
Pages:
55374-55376 (3 pages)
Docket Numbers:
Docket No. ER94-1181-005, et al.
PDF File:
95-26917.pdf