96-27831. National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List  

  • [Federal Register Volume 61, Number 212 (Thursday, October 31, 1996)]
    [Proposed Rules]
    [Pages 56194-56197]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-27831]
    
    
    -----------------------------------------------------------------------
    
    
    ENVIRONMENTAL PROTECTION AGENCY
    40 CFR Part 300
    
    [FRL-5642-4]
    
    
    National Oil and Hazardous Substances Pollution Contingency Plan; 
    National Priorities List
    
    AGENCY: Environmental Protection Agency.
    
    ACTION: Notice of Intent for partial deletion of the Geneva Industries 
    Superfund Site from the National Priorities List; request for comments.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Environmental Protection Agency (EPA) Region 6 announces 
    its intent to delete the first seven components (Source Control Portion 
    of the Site) of the eight remedial action components of the Record of 
    Decision (ROD) for the Geneva Industries Superfund Site (Site) from the 
    National Priorities List (NPL) and requests public comments on this 
    proposed action. The NPL constitutes Appendix B of the National Oil and 
    Hazardous Substances Pollution Contingency Plan (NCP), 40 CFR Part 300, 
    which EPA promulgated pursuant to Section 105 of the Comprehensive 
    Environmental Response, Compensation and Liability Act (CERCLA). This 
    partial deletion of the Site is proposed in accordance with 40 CFR 
    300.425(e) and Notice of Policy Change: Partial Deletion of Sites 
    Listed on the National Priorities List (Nov. 1, 1995).
        EPA bases its proposal to delete the Source Control Portion of the 
    Site on the determination by EPA and the State of Texas, through the 
    Texas Natural Resource Conservation Commission (TNRCC), that all 
    appropriate Hazardous Substance Superfund (Fund) financed response 
    under CERCLA for the Source Control Portion of the Site has been 
    implemented to protect public health and the environment and that no 
    further response action by responsible parties is appropriate.
        This partial deletion pertains to the Source Control Portion of the 
    Site only and does not include the eighth ROD remedial action component 
    (Ground Water Portion of the Site), which will remain on the NPL with 
    remedial activities continuing for the ground water system operation.
    
    DATES: Comments concerning this proposed partial deletion may be 
    submitted on or before December 2, 1996.
    
    ADDRESSES: Comments may be mailed to Mr. Donn R. Walters, Community 
    Relations Coordinator (6SF-P), U.S. EPA Region 6, Suite 1200, 1445 Ross 
    Avenue, Dallas, Texas 75202-2733, (800) 533-3508 or (214) 665-6483.
        Comprehensive information concerning the Site, as well as 
    information specific to this proposed partial deletion, is available 
    through the EPA Region 6 public docket at EPA's Region 6 office in 
    Dallas, Texas. The Administrative Record for the Site and the Deletion 
    Docket for this proposed partial deletion are maintained at the Site 
    information repositories listed below. Public docket items and Site 
    information repository items are available for public inspection and 
    copying. The relevant locations are as follows:
    
    U.S. EPA Region 6, Library (6MD-II), Suite 1200, 1445 Ross Avenue, 
    Dallas, Texas 75202-2733, (214) 665-6424 or 665-6427, hours of 
    operation: 8:00 a.m. to 4:30 p.m. Monday through Friday, excluding 
    holidays.
    Texas Natural Resource Conservation Commission, Technical Park Center, 
    Room 190, Building D, 12118 North IH 35, Austin, Texas 78753, (512) 
    239-2920, hours of operation: 8:00 a.m. to 5:00 p.m. Monday through 
    Friday, excluding holidays.
    Central Houston Public Library, Texas and Local History Division, Julia 
    Ideson Building, 500 McKinney, Houston, Texas 77002, (713) 236-1313 
    (Main Library), (713) 247-1664 (Texas and Local History Division), 
    hours of operation: 9:00 a.m. to 6:00 p.m. Monday through Saturday, 
    excluding holidays. (Note that Texas and Local History Division hours 
    are different from Main Library hours.)
    
    FOR FURTHER INFORMATION CONTACT: Mr. Ernest R. Franke, Project Manager 
    (6SF-AT), U.S. EPA Region 6, Suite 1200, 1445 Ross Avenue, Dallas, 
    Texas 75202-2733, (214) 665-8521.
    
    SUPPLEMENTARY INFORMATION:
    
    Table of Contents
    
    I. Introduction
    II. NPL Deletion Criteria
    III. Deletion Procedures
    IV. Basis for intended Partial Site Deletion
    
    Appendix
    
    A. Deletion Docket
    B. Site Coordinate Boundaries
    
    I. Introduction
    
        The Environmental Protection Agency (EPA) Region 6 announces its 
    intent to delete the first seven components (Source Control Portion of 
    the Site) of the eight remedial action components of the Record of 
    Decision (ROD) for the
    
    [[Page 56195]]
    
    Geneva Industries Superfund Site (Site) from the National Priorities 
    List (NPL) and requests public comments on this proposed action. The 
    NPL constitutes Appendix B of the National Oil and Hazardous Substances 
    Pollution Contingency Plan (NCP), 40 CFR Part 300, which EPA 
    promulgated pursuant to Section 105 of the Comprehensive Environmental 
    Response, Compensation and Liability Act (CERCLA), 42 U.S.C. 9605. EPA 
    identifies sites that appear to present a significant risk to public 
    health or the environment and maintains the NPL as the list of those 
    sites. Sites on the NPL may be the subject of remedial actions financed 
    by the Hazardous Substance Superfund (Fund). This partial deletion of 
    the Site is proposed in accordance with 40 CFR Sec. 300.425(e) and 
    Notice of Policy Change: Partial Deletion of Sites Listed on the 
    National Priorities List (60 FR 55466 (Nov. 1, 1995)). As described in 
    40 CFR 300.425(e)(3), releases deleted from the NPL remain eligible for 
    further remedial actions if warranted by future conditions.
        EPA will accept comments concerning its intent for partial deletion 
    on or before December 2, 1996.
        Section II of this document explains the criteria for deleting 
    sites from the NPL. Section III discusses the procedures that EPA is 
    using for this proposed partial deletion. Section IV discusses the 
    Geneva Site and explains how the Site meets the deletion criteria.
    
    II. NPL Deletion Criteria
    
        The NCP establishes the criteria that EPA uses to delete sites from 
    the NPL. In accordance with 40 CFR 300.425(e), sites may be deleted 
    from the NPL where no further response is appropriate. In making such a 
    determination pursuant to Sec. 300.425(e), EPA will consider, in 
    consultation with the appropriate state, whether any of the following 
    criteria have been met:
        Section 300.425(e)(1)(i). Responsible parties or other persons have 
    implemented all appropriate response actions required;
        Section 300.425(e)(1)(ii). All appropriate Fund-financed response 
    under CERCLA has been implemented, and no further response action by 
    responsible parties is appropriate; or
        Section 300.425(e)(1)(iii). The remedial investigation has shown 
    that the release poses no significant threat to public health or the 
    environment and, therefore, taking remedial measures is not 
    appropriate.
        Deletion of a portion of a site from the NPL does not preclude 
    eligibility for subsequent Fund-financed actions for the portion 
    deleted if future site conditions warrant such actions. Section 
    300.425(e)(3) of the NCP provides that Fund-financed actions may be 
    taken at sites that have been deleted from the NPL. A partial deletion 
    of a site from the NPL does not affect or impede EPA's ability to 
    conduct CERCLA response activities for portions not deleted from the 
    NPL. In addition, deletion of a portion of a site from the NPL does not 
    affect the liability of responsible parties or impede agency efforts to 
    recover costs associated with response efforts.
        Even if a site is deleted from the NPL, where hazardous substances, 
    pollutants or contaminants remain at the site above levels that allow 
    for unlimited use and unrestricted exposure, EPA's policy is that a 
    subsequent review of the site will be conducted at least every five 
    years after the initiation of the remedial action at the site to ensure 
    that the site remains protective of public health and the environment. 
    If new information becomes available which indicates a need for further 
    action, EPA may initiate remedial actions. Whenever there is a 
    significant release from a site deleted from the NPL, the site may be 
    restored to the NPL without the application of the hazard ranking 
    system. Deletion of a portion of a site from the NPL does not of itself 
    create, alter or revoke any person's rights or obligations. The NPL is 
    designed primarily for informational purposes and to assist EPA 
    management.
    
    III. Deletion Procedures
    
        Upon determination that at least one of the criteria described in 
    Sec. 300.425(e) of the NCP has been met, EPA may formally begin 
    deletion procedures. The following procedures were used for this 
    proposed deletion of the Source Control Portion of the Site:
        (1) EPA consulted with the State of Texas through the Texas Natural 
    Resource Conservation Commission (TNRCC) on the proposed partial 
    deletion prior to developing this document;
        (2) EPA recommended the proposed partial deletion;
        (3) TNRCC concurred with the proposed partial deletion more than 
    thirty working days before publication of this document in the Federal 
    Register;
        (4) Concurrently with publication of this document in the Federal 
    Register, a document will be published in a major local newspaper of 
    general circulation at or near the Site and will be distributed to 
    appropriate federal, state and local officials and other interested 
    parties, which notices will announce a thirty calendar day public 
    comment period on the deletion package and will announce the 
    availability of copies of this notice of intent to delete at the EPA 
    Region 6 library and the information repositories; and
        (5) EPA made all relevant documents available at the EPA Region 6 
    library and the information repositories listed above, which documents 
    are available for public inspection and copying.
        The public is invited to comment on EPA's proposal to delete the 
    Source Control Portion of the Site from the NPL.
        Upon completion of the thirty calendar day public comment period, 
    EPA Region 6 will evaluate each significant comment and any significant 
    new data received before issuing a final decision concerning the 
    proposed partial deletion. EPA will prepare a responsiveness summary 
    for each significant comment and any significant new data received 
    during the public comment period and will address concerns presented in 
    such comments and data. The responsiveness summary will be made 
    available to the public at the EPA Region 6 library and the information 
    repositories listed above and will be included in the final deletion 
    package. Members of the public are encouraged to contact EPA Region 6 
    to obtain a copy of the responsiveness summary. If, after review of all 
    such comments and data, EPA determines that the partial deletion from 
    the NPL is appropriate, EPA will publish a final notice of partial 
    deletion in the Federal Register. Deletion of the Source Control 
    Portion of the Site does not actually occur until a final notice of 
    partial deletion is published in the Federal Register. A copy of the 
    final deletion package will be placed in the EPA Region 6 library and 
    the information repositories listed above after a final notice has been 
    published in the Federal Register.
    
    IV. Basis for Intended Partial Site Deletion
    
        The following information provides EPA's rationale for deletion of 
    the Source Control Portion of the Site from the NPL and explains EPA's 
    finding that the proposed partial deletion satisfies 40 CFR 
    Sec. 300.425(e) requirements:
        The Site is a thirteen and one-half acre fenced tract located at 
    9334 Canniff Road in Houston, Texas. The Site is east of Interstate 
    Highway 45 (Gulf Freeway), north of Airport Boulevard/College Street 
    and within two miles of the William P. Hobby Airport. The site has been 
    owned by the following companies since 1967:
         Geneva Industries, June 1967 to Feb. 1974;
    
    [[Page 56196]]
    
         Pilot Industries of Texas, Inc., Feb. 1974 to Dec. 1976;
         Intercostal Refining Co., Dec. 1976 to Dec. 1980;
         Lone Star Fuel Company, Dec. 1980 to May 1982 and
         Fuhrmann Energy Corporation, May 1982 to the present time. 
    Prior to June 1967, the land was used for petroleum exploration and 
    production.
        The Site is an abandoned refinery that had been used to manufacture 
    chemicals such as biphenyl, polychlorinated biphenyl (PCB), phenyl 
    phenol, naphtha and Nos. 2 and 6 fuel oils.
        In 1981, the Site and adjoining property to the south contained 
    processing tanks and piping, a large waste water lagoon, two smaller 
    lagoons, a closed lagoon containing solid PCB wastes, a diked tank 
    area, several drum storage areas, a landfill and a possible landfarm. 
    As a result of past practices at the Site, extensive soil and shallow 
    ground water contamination occurred.
        Before removal actions began, surface soil contamination had PCB 
    levels as high as 12,200 parts per million (ppm). The most prevalent 
    PCB at the Site was Aroclor 1242. A number of chlorinated non-aromatic 
    solvents (e.g., benzene), non-aromatic chlorinated solvents (e.g., 
    trichloroethylene (TCE)) and polynuclear aromatic hydrocarbons (PAHs) 
    were detected at the Site. TCE was detected consistently in the ground 
    water but was limited to the thirty-foot sand and the one hundred-foot 
    sand beneath the Site.
        Removal actions were performed by EPA and TNRCC from October 1983 
    to February 1984 to close three onsite lagoons, remove all drummed 
    waste on the surface, remove all offsite soils containing greater than 
    fifty ppm PCBs, install a temporary cap over all on-site soils 
    containing greater than fifty ppm PCBs and improve Site drainage. 
    Approximately 3,400 cubic yards of contaminated soils and sludges, 550 
    drums and thirty tons of asbestos were removed and transported to an 
    approved disposal facility in Emmelle, Alabama. Other removal actions 
    to plug abandoned onsite wells and remove storage tank materials were 
    performed in May 1984 and September 1984, respectively. The total cost 
    of these removal actions was $1,748,179.
        Removal actions also included investigation of the Site's soil 
    contamination. The Site remedial investigation, which was performed 
    from June 1984 to September 1984, further assessed the nature, degree 
    and extent of the contamination. Based on the results of detailed 
    investigations, EPA assigned the Site a hazard ranking system score of 
    59.46 and included the Site on the NPL. The Federal Register 
    promulgation date for adding the Site to the NPL was September 21, 1984 
    (49 FR 37070).
        In December 1983, EPA awarded to TNRCC a cooperative agreement in 
    the amount of $600,000 for the remedial investigation and feasibility 
    study (RI/FS). The initial Site work was completed in September 1984, 
    at which time it was determined that additional field work would be 
    required. A $300,000 increase to the cooperative agreement was awarded 
    in March 1985 for investigation of possible seismic faulting at the 
    Site. All field RI/FS work was completed by the end of October 1985.
        EPA issued a Record of Decision for the Site on September 18, 1986. 
    This ROD addressed contaminated structures, soils and ground water. The 
    remedy selected in the ROD includes eight major components:
         Removal and disposal of all surface facilities,
         Plugging and abandoning unnecessary monitoring wells,
         Excavation of 22,500 cubic yards of soils contaminated 
    with greater than one hundred ppm PCBs,
         Excavation of all drums buried onsite,
         Disposal of excavated material in an EPA-approved offsite 
    facility,
         Construction of a slurry wall barrier around the Site with 
    a pressure relief well system,
         Construction of a permanent protective cap across the Site 
    surface, and
         Recovery and treatment of TCE contaminated ground water in 
    both the thirty-foot sand and one hundred-foot sand (Ground Water 
    Portion of the Site).
        TNRCC contracted with IT Corporation for the remedial design and 
    oversight activities of the remedial action. It was decided early in 
    the project design by EPA, TNRCC, and IT Corporation to split the 
    remedial action into two distinct portions--one for the contaminated 
    soils (Source Control Portion of the Site) and the other for the 
    contaminated ground water (Ground Water Portion of the Site)--although 
    the ROD does not refer to the term ``operable units.'' IT Corporation 
    prepared the design criteria and contract documents (plans and 
    specifications) separately for the Source Control Portion of the Site 
    and the Ground Water Portion of the Site.
        Remedial action construction for the Source Control Portion of the 
    Site began in May 1988 but was stopped from October 1988 to June 1989 
    due to litigation concerning the shipping of waste from the Site to a 
    waste disposal facility in Emmelle, Alabama. Transportation of waste to 
    the Emmelle, Alabama, waste disposal facility began in July 1989 and 
    continued through September 1989. The remedial action for the Source 
    Control Portion of the Site was completed in September 1990. This 
    proposal for partial deletion pertains only to the Source Control 
    Portion of the Site, which includes disposal of 62,290 tons of 
    contaminated material (soils) at a total cost of $20,624,984. The 
    increased volume and other differences from the ROD are documented in 
    the July 1993 explanation of significant differences to the record of 
    decision. The September 1993 preliminary site closeout report further 
    documents that the remedy for the Source Control Portion of the Site is 
    complete and that the ground water pump and treat system has been 
    constructed.
        The remedial design for the Ground Water Portion of the Site was 
    completed in March 1992. Construction activities, known as Phase I, for 
    the ground water treatment system, were substantially completed in July 
    1993. The ten-year ground water pump and treatment, Phase II, is 
    currently in progress, and the ground water monitoring is currently 
    being performed. Monitoring is for TCEs and has been conducted for the 
    past three years. There are ten monitoring wells within the perimeter 
    of the slurry wall: nine monitor the thirty-foot sand, and one monitors 
    the one hundred-foot sand. Outside the perimeter of the slurry wall, 
    four wells monitor the thirty-foot sand, and three wells monitor the 
    one hundred-foot sand. Monitoring has been conducted once every three 
    months. The frequency and duration of future monitoring depend upon the 
    consistency of monitoring results.
        The Agency for Toxic Substances and Disease Registry issued an 
    April 1993 Public Health Assessment addendum concluding that the Site 
    poses no apparent public health hazard; a copy of the addendum is in 
    the EPA Region 6 library and the information repositories listed above 
    and is available for public inspection and copying.
        A permanent protective cap across the Site surface and a slurry 
    wall barrier around the Site have been constructed, and a ten-year 
    ground water pump and treatment is in progress. Hazardous substances, 
    pollutants or contaminants that will remain onsite are above health-
    based levels and do not allow unlimited use of, or unrestricted access 
    to, the Site; therefore, EPA will conduct five-year reviews as required 
    by CERCLA
    
    [[Page 56197]]
    
    section 121(c), 42 U.S.C. 9621(c), the first of which is scheduled for 
    July 1998.
        Operation and maintenance (O&M) activities are required both during 
    implementation of the remedy and during the post-closure period. The 
    major O&M during implementation is associated with the ground water 
    recovery system, which includes replacement of pumps, wells and spent 
    carbon. O&M associated with the post-closure period includes periodic 
    inspection and repair of the surface cap and operation of the pressure 
    relief and leachate collection systems. The post-closure operation and 
    maintenance plan dated January 1988 will be implemented at the Site.
        EPA, with the concurrence of TNRCC, has determined that all 
    appropriate Fund-financed response under CERCLA has been implemented 
    concerning the Source Control Portion of the Site to protect public 
    health and the environment and that no further response action by 
    responsible parties is appropriate for the Source Control Portion of 
    the Site. Therefore, EPA proposes to delete the Source Control Portion 
    of the Site from the NPL.
    
        Dated: October 8, 1996.
    
        Approved by:
    Jerry Clifford,
    Deputy Regional Administrator, U.S. Environmental Protection Agency, 
    Region 6.
    [FR Doc. 96-27831 Filed 10-30-96; 8:45 am]
    BILLING CODE 6560-50-P
    
    
    

Document Information

Published:
10/31/1996
Department:
Environmental Protection Agency
Entry Type:
Proposed Rule
Action:
Notice of Intent for partial deletion of the Geneva Industries Superfund Site from the National Priorities List; request for comments.
Document Number:
96-27831
Dates:
Comments concerning this proposed partial deletion may be submitted on or before December 2, 1996.
Pages:
56194-56197 (4 pages)
Docket Numbers:
FRL-5642-4
PDF File:
96-27831.pdf