[Federal Register Volume 62, Number 211 (Friday, October 31, 1997)]
[Notices]
[Pages 58961-58965]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-28898]
[[Page 58961]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC98-8-000, et al.]
Wisconsin Energy Corporation and ESELCO, Inc., et al.; Electric
Rate and Corporate Regulation Filings
October 27, 1997.
Take notice that the following filings have been made with the
Commission:
1. Wisconsin Energy Corporation and ESELCO, Inc.
[Docket No. EC98-8-000]
Take notice that on October 22, 1997, Wisconsin Energy Corporation
(``WEC'') and ESELCO, Inc. (``ESELCO''), on behalf of themselves and
their jurisdictional subsidiaries \1\ (collectively ``Applicants''),
tendered for filing pursuant to Section 203 of the Federal Power Act
(the ``FPA''), 16 U.S.C. Sec. 824b (1994) and Part 33, 18 CFR 33.1-
33.10, and Section 2.26, 18 CFR 2.26, of the regulations of the Federal
Energy Regulatory Commission (the ``Commission''), an Application for
Approval of Merger and Related Authorizations (``Application'').
---------------------------------------------------------------------------
\1\ The FERC jurisdictional subsidiaries of WEC are Wisconsin
Electric Power Company (``Wisconsin Electric'') and Griffin Energy
Marketing, L.L.C. (``Griffin''), a power marketer. Griffin is a
wholly-owned subsidiary of WISVEST Corporation, which, like
Wisconsin Electric, is a wholly-owned subsidiary of WEC. The FERC
jurisdictional subsidiary of ESELCO is Edison Sault Electric Company
(``Edison Sault'').
---------------------------------------------------------------------------
The merger is structured so that ESL Acquisition, Inc., a new WEC
subsidiary created solely to effectuate the merger, will be merged into
ESELCO, making ESELCO a wholly-owned subsidiary of WEC. Under the new
corporate structure, Wisconsin Electric and ESELCO will be separate,
first-tier subsidiaries of WEC, and they will retain their corporate
existence. Wisconsin Electric and Edison Sault will each retain their
own identities as public utilities and their current service
territories. Wisconsin Electric and Edison Sault will continue to
operate independently, but Applicants have proposed a single-system
open access transmission tariff.
The Applicants state that they have submitted the information
required by Part 33 of the Commission's regulations and by the
Commission's Inquiry Concerning the Commission's Merger Policy Under
the Federal Power Act; Policy Statement, Order No. 592, FERC Stats. &
Regs. para. 31,044 (1996), order on reconsideration, Order No. 592-A,
79 FERC para. 61,321 (1997), in support of the application. Applicants
represent that copies of the Application and related testimony and
exhibits have been served by overnight delivery on each of WEC's and
ESELCO's wholesale customers, on the Michigan Public Service Commission
and the Public Service Commission of Wisconsin, and on other parties
likely to be interested.
Comment date: December 22, 1997, in accordance with Standard
Paragraph E at the end of this notice.
2. Edison Sault Electric Company and ESEG, Inc.
[Docket No. EC98-9-000]
Take notice that on October 22, 1997, ESEG, Inc. (``ESEG'') and
Edison Sault Electric Company (``Edison Sault'') jointly filed an
application pursuant to Section 203 of the Federal Power Act requesting
authorization to merge ESEG into Edison Sault contingent upon the
Federal Energy Regulatory Commission's approval of the proposed merger
between Wisconsin Energy Corporation and ESELCO, Inc. Edison Sault and
ESEG are wholly-owned subsidiaries of ESELCO, Inc.
Comment date: December 22, 1997, in accordance with Standard
Paragraph E at the end of this notice.
3. Citizens Power LLC
[Docket No. EC98-10-000]
Take notice that on October 23, 1997, Citizens Power LLC led an
application for an order authorizing the proposed transfers of (1) 98%
equity interests in each of CL Power Sales Three, L.L.C., CL Power
Sales Four, L.L.C., and CL Power Sales Five, L.L.C. from Citizens Power
L.L.C. to Citizens Power Sales, and (2) 1% equity interests in each of
CL Power Sales Three, L.L.C., CL Power Sales Four, L.L.C., and CL Power
Sales Five, L.L.C. from CL Funding L.L.C. to Citizens Power Sales.
Citizens Power Sales, CL Funding L.L.C., CL Power Sales Three, L.L.C.,
CL Power Sales Four, L.L.C., and CL Power Sales Five, L.L.C. are all
direct or indirect subsidiaries or affiliates of Citizens Power LLC.
Comment date: November 24, 1997, in accordance with Standard
Paragraph E at the end of this notice.
4. Coral Power, L.L.C.
[Docket Nos. EC98-11-000 and ER96-25-008]
Take notice that Coral Power, L.L.C., a broker and marketer of
electric power, filed on October 23, 1997, a request for approval of
the disposition of jurisdictional assets that may result from the
merger of Coral's affiliates, Shell Oil Company and Tejas Gas
Corporation, and a notice of change in status relating to that merger.
Comment date: November 24, 1997, in accordance with Standard
Paragraph E at the end of this notice.
5. LG&E Energy Marketing Inc.
[Docket No. ER94-1188-018]
On October 9, 1997, LG&E Energy Marketing Inc. (``LEM''), formerly
known as LG&E Power Marketing Inc., filed a notification of a change in
status to reflect the proposed merger of LEM's parent, LG&E Energy
Corp., with KU Energy Corporation, the parent of Kentucky Utilities
Company.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
6. Public Service Company of Colorado
[Docket No. ER96-713-001]
Take notice that on October 3, 1997, Public Service Company of
Colorado filed amendments to the agreements with its wholesale
customers and a Service Agreement for Network Transmission Service, all
to comply with the Commission's letter-order issued June 13, 1997, in
Public Service Company of Colorado, 79 FERC para. 61,343 (1997).
Copies of the filing have been served on the affected customers and
on the Public Utilities Commission of the State of Colorado.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
7. Tampa Electric Company
[Docket Nos. ER97-4195-000, ER97-4390-000, ER97-4570-000 and ER97-4571-
000 (Not Consolidated)]
Take notice that on October 14, 1997, Tampa Electric Company (Tampa
Electric) amended its filings in the above-referenced dockets by
submitting amendments to its contracts for the purchase and sale of
power and energy with The Energy Authority, Inc. (TEA), Sonat Power
Marketing L.P. (Sonat), LG&E Energy Marketing Inc. (LG&E Energy), and
PECO Energy Company--Power Team (PECO).
Tampa Electric proposes that the amendments be made effective
concurrently with the contracts on August 18 (TEA), September 1
(Sonat), and September 15 (LG&E Energy and PECO), and therefore
requests waiver of the Commission's notice requirement.
Copies of the amendatory filing were served on TEA, Sonat, LG&E
Energy, PECO, and the Florida Public Service Commission.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 58962]]
8. The Washington Water Power Company
[Docket No. ER97-4350-000]
Take notice that on October 20, 1997, The Washington Water Power
Company (``WWP'') tendered for filing with the Federal Energy
Regulatory Commission an amendment in the above-referenced docket,
amending a Service Agreement for Firm Point-To-Point Transmission
Service with Duke Energy Trading and Marketing.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
9. Rochester Gas and Electric Corporation
[Docket No. ER97-4362-000]
Take notice that on October 21, 1997, Rochester Gas and Electric
Corporation (RG&E) tendered for filing an amendment to its filing in
the above-referenced proceeding.
RG&E requests waiver of the Commission's sixty (60) day notice
requirements and an effective date of August 20, 1997 for the
Pennsylvania Power & Light Company Service Agreement.
Copies of this filing have been sent to PP&L and the New York
Public Service Commission.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
10. PowerCom Corporation
[Docket No. ER97-4364-000]
Take notice that on October 20, 1997, PowerCom Corporation (PC)
filed a supplement to its application for market-based rates as power
marketer. The supplemental information pertains to the owners and
affiliates of PC. PC is owned by a group of individuals who engage in
the purchase of electricity along with other communications and
utilities services and resell them to wholesale and retail customers.
They have no affiliates.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
11. Central Vermont Public Service Corporation
[Docket No. ER98-87-000]
Take notice that on October 8, 1997, Central Vermont Public Service
Corporation (``Central Vermont''), tendered for filing a Service
Agreement with New Energy Ventures, Inc. under its FERC Electric Tariff
No. 5. The tariff provides for the sale by Central Vermont of power,
energy, and/or resold transmission capacity at or below Central
Vermont's fully allocated costs.
Central Vermont requests waiver of the Commission's regulations to
permit the service agreement to become effective on October 1, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
12. Central Vermont Public Service Corporation
[Docket No. ER98-88-000]
Take notice that on October 8, 1997, Central Vermont Public Service
Corporation (``Central Vermont''), tendered for filing a Service
Agreement with NP Energy Inc. under its FERC Electric Tariff No. 5. The
tariff provides for the sale by Central Vermont of power, energy, and/
or resold transmission capacity at or below Central Vermont's fully
allocated costs.
Central Vermont requests waiver of the Commission's regulations to
permit the service agreement to become effective on October 1, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
13. New York State Electric & Gas Corporation
[Docket No. ER98-90-000]
Take notice that on October 8, 1997, New York State Electric & Gas
Corporation (``NYSEG''), filed a Service Agreement between NYSEG and
The Dayton Power and Light Company (``Customer''). This Service
Agreement specifies that the Customer has agreed to the rates, terms
and conditions of the NYSEG open access transmission tariff filed and
effective on June 11, 1997, in Docket No. OA97-571-000.
NYSEG requests waiver of the Commission's sixty-day notice
requirements and an effective date of October 9, 1997 for the Dayton
Power and Light Company Service Agreement. NYSEG has served copies of
the filing on The New York State Public Service Commission and on the
Customer.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
14. Idaho Power Company
[Docket No. ER98-91-000]
Take notice that on October 8, 1997, Idaho Power Company (IPC),
tendered for filing with the Federal Energy Regulatory Commission a
Service Agreement under Idaho Power Company FERC Electric Tariff,
Second Revised, Volume No. 1 between Mason #3 Public Utility District
and Idaho Power Company.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
15. Montaup Electric Company
[Docket No. ER98-92-000]
Take notice that on October 7, 1997, Montaup Electric Company
(``Montaup'') filed a revised Appendix IV to its FERC Electric Tariff,
Original Volume No. IV, for system power sales. The changes consist of
(a) the replacement of a fixed revenue requirement with a formula rate
and (b) provisions for a pass-through of any NEPOOL charges for
ancillary service that NEPOOL does not charge directly to the customer.
Montaup requests a waiver of the notice requirement so that this
filing may be allowed to become effective on July 1, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
16. Wisconsin Electric Power Company
[Docket No. ER98-93-000]
Take notice that on October 8, 1997, Wisconsin Electric Power
Company (``Wisconsin Electric''), tendered for filing an addition to
its FERC Electric Tariff, Volume No. 7. The proposed Attachment J would
establish a redispatch protocol that describes how Wisconsin Electric
would bill its transmission service customers when making additional
transmission capability available by altering its generation dispatch.
Wisconsin Electric acknowledges that application of Attachment J would
require a subsequent rate filing with the Commission.
Wisconsin Electric also submits a revision to Section 17.3 of its
transmission service tariff that allows it to waive, in certain
circumstances, the deposit requirement that applies to applications for
firm point-to-point transmission service.
Wisconsin Electric respectfully requests an effective date of sixty
days after filing.
Copies of the filing have been served on all transmission service
customers, the Michigan Public Service Commission, and the Public
Service Commission of Wisconsin.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
17. Central Power and Light Company; West Texas Utilities Company
[Docket No. ER98-94-000]
Take notice that on October 8, 1997, Central Power and Light
Company (CPL) and West Texas Utilities Company (WTU) submitted for
filing thirty-four (34) executed Delivery Point and Service
Specifications sheets providing
[[Page 58963]]
for various minor changes to the Service Agreements between WTU and
nine of its wholesale customers: Brazos Electric Cooperative, Inc.,
Coleman County Electric Cooperative, Inc., Concho Valley Electric
Cooperative, Inc., Greenbelt Electric Cooperative, Inc., Lighthouse
Electric Cooperative, Inc., Midwest Electric Cooperative, Inc.,
Southwest Texas Electric Cooperative, Inc., Stamford Electric
Cooperative, Inc. and Taylor Electric Cooperative, Inc. executed under
WTU's FERC Electric Tariff, Original Volume No. 1 and a minor change to
the Service Agreement between CPL and one of its full requirements
wholesale customers, Medina Electric Cooperative, Inc., executed under
CPL's FERC Electric Tariff, 6th Revised Volume No. 1.
CPL and WTU state that copies of the filing have been sent to the
Public Utility Commission of Texas and the affected full-requirements
wholesale customers.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
18. Illinois Power Company
[Docket No. ER98-95-000]
Take notice that on October 9, 1997, Illinois Power Company
(``Illinois Power''), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing firm and non-firm transmission agreements under
which QST Energy Trading Inc. will take transmission service pursuant
to its open access transmission tariff. The agreements are based on the
Form of Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of October 1, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
19. Virginia Electric and Power Company
[Docket No. ER98-96-000]
Take notice that on October 9, 1997, Virginia Electric and Power
Company (Virginia Power), tendered for filing the Service Agreement
between Virginia Electric and Power Company and Market Responsive
Energy, Inc. under the Power Sales Tariff to Eligible Purchasers dated
May 27, 1994, as revised on December 31, 1996 (Tariff). Under the
tendered Service Agreement, Virginia Power agrees to provide services
to Market Responsive Energy, Inc. under the rates, terms and conditions
of the applicable Service Schedules included in the Tariff. Virginia
Power requests an effective date of September 12, 1997 for the Service
Agreement.
Copies of the filing were served upon Market Responsive Energy,
Inc., Virginia State Corporation Commission and the North Carolina
Utilities Commission.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
20. Virginia Electric and Power Company
[Docket No. ER98-97-000]
Take notice that on October 9, 1997, Virginia Electric and Power
Company (Virginia Power), tendered for filing Service Agreements for
Non-Firm Point-to-Point Transmission Service with EnerZ Corporation, a
subsidiary of the Zeigler Holding Co. and Market Responsive Energy,
Inc. under the Open Access Transmission Tariff to Eligible Purchasers
dated July 9, 1996. Under the tendered Service Agreement, Virginia
Power will provide non-firm point-to-point service to the Transmission
Customers under the rates, terms and conditions of the Open Access
Transmission Tariff.
Copies of the filing were served upon EnerZ Corporation, Market
Responsive Energy, Inc., the Virginia State Corporation Commission and
the North Carolina Utilities Commission.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
21. Southern California Edison Company
[Docket No. ER98-98-000]
Take notice that on October 9, 1997, Southern California Edison
Company (Edison), tendered for filing a Notice of Cancellation of FERC
Rate Schedule No. 247.38, FERC Rate Schedule No. 247.39, and all
supplements thereto.
Edison requests that this cancellation become effective September
30, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
22. Illinois Power Company
[Docket No. ER98-100-000]
Take notice that on October 9, 1997, Illinois Power Company
(``Illinois Power''), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing a Power Sales Tariff, Service Agreement under which
EnerZ Corporation will take service under Illinois Power Company's
Power Sales Tariff. The agreements are based on the Form of Service
Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of September 10,
1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
23. Illinois Power Company
[Docket No. ER98-101-000]
Take notice that on October 9, 1997, Illinois Power Company
(``Illinois Power''), 500 South 27th Street, Decatur, Illinois 62526,
tendered for filing a Power Sales Tariff, Service Agreement under which
USGen Power Services, L.P. will take service under Illinois Power
Company's Power Sales Tariff. The agreements are based on the Form of
Service Agreement in Illinois Power's tariff.
Illinois Power has requested an effective date of September 10,
1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
24. Current Energy, Inc.
[Docket No. ER98-102-000]
Take notice that on October 9, 1997, Current Energy, Inc.
(``Current'') petitioned the Commission for acceptance of Current Rate
Schedule FERC No. 1; the granting of certain blanket approvals,
including the authority to sell electricity at market-based rates; and
the waiver of certain commission regulations.
Current intends to engage in wholesale electric power and energy
purchases and sales as a marketer. Current is not in the business of
generating or transmitting electric power. Current is an independent
corporation. Affiliates under control of one or more Current principals
engage in general construction.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
25. New York State Electric & Gas Corporation
[Docket No. ER98-103-000]
Take notice that on October 9, 1997, New York State Electric & Gas
Corporation (``NYSEG''), tendered for filing pursuant to Section 35 of
the Federal Energy Regulatory Commission's Rules of Practice and
Procedure, 18 CFR 35 (1996), service agreements under which NYSEG may
provide capacity and/or energy to Central Maine Power Company
(``CMP''), Constellation Power Source, Inc. (``Constellation''), Market
Responsive Energy, Inc. (``MRE''), Minnesota Power & Light Company
(``Minnesota''), and Strategic Energy Ltd. (``SEL'')(collectively, the
``Purchasers'') in accordance with NYSEG's FERC Electric Tariff,
Original Volume No. 1.
[[Page 58964]]
NYSEG has requested waiver of the notice requirements so that the
service agreements with CMP, Constellation, MRE, Minnesota, and SEL
become effective as of October 10, 1997.
The Service Agreements are subject to NYSEG's Application for
Approval of Corporate Reorganization which was filed with the
Commission on September 1, 1997 and was assigned Docket No. EC97-52-
000.
NYSEG has served copies of the filing upon the New York State
Public Service Commission, CMP, Constellation, MRE, Minnesota, and SEL.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
26. Ohio Edison Company; Pennsylvania Power Company
[Docket No. ER98-104-000]
Take notice that on October 9, 1997, Ohio Edison Company tendered
for filing on behalf of itself and Pennsylvania Power Company, a
Service Agreement for Non-Firm Point-to-Point Transmission Service with
Williams Energy Services Company and Ohio Edison Company pursuant to
Ohio Edison's Open Access Tariff. This Service Agreement will enable
the parties to obtain Non-Firm Point-to-Point Transmission Service in
accordance with the terms of the Tariff.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
27. Fall River Rural Electric Cooperative, Inc.
[Docket No. ER98-105-000]
Take notice that on October 9, 1997, Fall River Rural Electric
Cooperative, Inc. (Fall River) submitted for filing pursuant to 205 of
the Federal Power Act (FPA), 16 U.S.C. 824d, and 35.12 of the
Regulations of the Federal Energy Regulatory Commission (Commission),
18 CFR 35.12 (1966), three rate schedules for wholesale sales or for
transmission services that Fall River provides to third parties and one
certificate of concurrence by Fall River in a rate schedule of another
public utility that was previously submitted to and accepted by the
Commission. The three rate schedules and the certificate of concurrence
are the following: Emergency Interconnection Agreement Between Fall
River, and PacifiCorp; Lease Agreement Between Fall River and
Bonneville Power Administration (BPA); Lease and Assignment Agreement--
Felt Project Between Fall River and Bonneville Pacific Corporation, as
assigned to CDM Hydroelectric Company; and, Fall River's certificate of
concurrence in the Transmission Service and Interconnection Agreement
Between PacifiCorp Electric Operations, Fall River, and Marysville
Hydro Partners (Marysville) (PacifiCorp Rate Schedule No. 322). Fall
River's filing is available for public inspection at its offices in
Ashton, Idaho. Fall River requests that the Commission accept the
Service Agreements with an effective date of March 20, 1996.
Fall River also submitted for informational purposes, or for
acceptance and termination, two additional agreements, which are as
follows: Interconnection Agreement Executed by Fall River Rural
Electric Cooperative, Inc., and Buffalo Hydro, Inc.; and Transmission
Agreement Providing Transmission Services for the Transfer of Power
from the Buffalo Hydroelectric Project No. 1413 to PacifiCorp. Fall
River also requests that these two agreements have an effective date of
March 20, 1996, if accepted, and that they be terminated as of
September 24, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
28. West Texas Utilities Company
[Docket No. ER98-106-000]
Take notice that on October 9, 1997, West Texas Utilities Company
(``WTU''), submitted for filing a Power Supply Agreement (``PSA''),
dated August 25, 1997, between WTU and the City of Hearne, Texas
(``Hearne''). Under the PSA, WTU will supply Hearne's full-requirements
for electric power and energy, effective April 1, 1998.
WTU requests an effective date of October 1, 1997 for the PSA and,
accordingly, requests waiver of the Commission's notice requirements.
Copies of this filing have been served on Hearne and the Public Utility
Commission of Texas.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
29. Alabama Power Company
[Docket No. ER98-108-000]
Take notice that on October 9, 1997, Alabama Power Company filed
Twenty-Ninth Revised Sheet No. 37 to its FERC Electric Tariff, Original
Volume No. 1. The purpose of this filing is to give notice that,
effective September 19, 1997, electric service to Black Warrior
Electric Membership Corporation's new Mt. Sterling 115 kV delivery
point was established.
A copy of the filing was served upon Black Warrior Electric
Membership Corporation.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
30. Central Illinois Light Company
[Docket No. ER98-109-000]
Take notice that on October 9, 1997, Central Illinois Light Company
(CILCO), 300 Liberty Street, Peoria, Illinois 61602, on October 8,
1997, tendered for filing with the Commission a substitute Index of
Point-To-Point Transmission Service Customers under its Open Access
Transmission Tariff and service agreements for three new customers,
Kansas City Power and Light Company, QST Energy Trading Inc., and
Avista Energy, Inc.
CILCO requested an effective date of October 1, 1997.
Copies of the filing were served on the affected customers and the
Illinois Commerce Commission.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
31. The Detroit Edison Company
[Docket No. ER98-110-000]
Take notice that on October 9, 1997, The Detroit Edison Company
(``Detroit Edison''), filed a revised Power Sales Agreement between
Detroit Edison and DTE Energy Trading, Inc. (the ``Power Sales
Agreement''), FERC Rate Schedule No. 33. The Power Sales Agreement has
been revised in accordance with the order of the Federal Energy
Regulatory Commission in The Detroit Edison Company, et al., 80 FERC
para.61,348 (1997).
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
32. Louisville Gas and Electric Company; Kentucky Utilities Company
[Docket No. ER98-111-000]
Take notice that on October 9, 1997, Louisville Gas and Electric
Company (``LG&E'') and Kentucky Utilities Company (``KU''), tendered
for filing, pursuant to 18 CFR 35.13, three proposed new rate schedules
titled ``Power Supply System Agreement'' (``PSSA''), and ``Transmission
Coordination Agreement (``TCA''). The PSSA provides the contractual
basis for coordinated planning, operation and maintenance of the
combined power supply systems of LG&E and KU. The TCA provides the
contractual basis for coordinated planning, operation and maintenance
of the combined transmission systems of LG&E and KU. In this
connection, the PSSA and the TCA provide for the allocation between the
Applicants of specified costs and benefits of coordinated operations.
[[Page 58965]]
Copies of the filing were served upon LG&E's and KU's
jurisdictional customers, the Kentucky Public Service Commission, the
Virginia State Corporation Commission, and the Tennessee Regulatory
Authority.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
33. Northeast Utilities Service Company
[Docket No. ER98-112-000]
Take notice that on October 10, 1997, Northeast Utilities Service
Company (``NUSCO''), tendered for filing, a Service Agreement with NP
Energy, Inc. (``NPE'') under the NU System Companies'' System Power
Sales/Exchange Tariff No. 6.
NUSCO states that a copy of this filing has been mailed to NPE.
NUSCO requests that the Service Agreement become effective December
1, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
34. Northeast Utilities Service Company
[Docket No. ER98-113-000]
Take notice that on October 10, 1997, Northeast Utilities Service
Company (NUSCO), on behalf of its operating affiliates, The Connecticut
Light and Power Company, Western Massachusetts Electric Company,
Holyoke Water Power Company, Holyoke Power and Electric Company and
Public Service Company of New Hampshire, tendered for filing a Service
Agreement with NP Energy, Inc. (``NPE'') under the Northeast Utilities
System Companies' Sale for Resale Tariff No. 7 Market Based Rates.
NUSCO requests an effective date of December 1, 1997.
NUSCO states that a copy of its submission has been mailed or
delivered to NPE.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
35. New England Power Company
[Docket No. FA96-53-001]
Take notice that on October 14, 1997, pursuant to an audit report
issued by Commission Audit Staff, New England Power Company filed a
plan to refund Spent Nuclear Fuel Disposal Costs to its customers under
NEP's FERC Electric Tariff, Original Volume No. 1.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
36. Mark B. Grier
[Docket No. ID-3081-000]
Take notice that on October 17, 1997, Mark B. Grier (Applicant)
filed an application pursuant to Section 305(b) of the Federal Power
Act to hold the following positions:
Director--Rochester Gas and Electric Corporation
Executive Vice President, Financial Management--The Prudential
Insurance Company of America
Director--Prudential Securities Group, Inc.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
37. Kentucky Utilities Company
[Docket No. OA96-193-003]
Take notice that on September 8, 1997, Kentucky Utilities Company
(KU) tendered for filing a list of KU's Transmission Service customers
under its Transmission Services (TS) Tariff.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
38. Niagara Mohawk Power Corporation
[Docket No. OA96-194-003]
Take notice that on September 11, 1997, Niagara Mohawk Power
Corporation made a filing in compliance with the Commission's order in
Allegheny Power System, Inc. et al. issued July 31, 1997.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
39. Montana Power Company
[Docket No. OA96-199-002]
Take notice that on September 16, 1997, Montana Power Company
tendered for filing in compliance to FERC orders dated December 18,
1996 and July 31, 1997 in Docket Nos. OA96-18-000, et al., its FERC
Electric Tariff, Second Revised Volume No. 5 (``Open Access
Transmission Tariff'').
Montana requests that the Commission accept the tariff for filing,
effective as of September 15, 1997; and allow the tariff to supersede
Montana's FERC Electric Tariff, First Revised Volume No. 5.
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
40. Florida Power & Light Company
[Docket No. OA97-699-000]
Take notice that on September 8, 1997, Florida Power & Light
Company (``FPL'') tendered for filing various miscellaneous language
changes to FPL's Open Access Transmission Tariff (``Tariff'').
Comment date: November 10, 1997, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-28898 Filed 10-30-97; 8:45 am]
BILLING CODE 6717-01-P