2016-26210. NuScale Power, LLC, Design-Specific Review Standard and Scope and Safety Review Matrix  

  • Start Preamble

    AGENCY:

    Nuclear Regulatory Commission.

    ACTION:

    NuScale design-specific review standard; issuance.

    SUMMARY:

    The U.S. Nuclear Regulatory Commission (NRC or Commission) has issued the NuScale Power, LLC, (NuScale), Design-Specific Review Standard (DSRS) Sections, and is issuing the final NuScale DSRS Scope and Safety Review Matrix, for NuScale Design Certification (DC), Combined License (COL), and Early Site Permit (ESP) reviews. The NRC staff is also issuing the DSRS public comment resolution matrices, which address the comments received on the draft DSRS. The NuScale DSRS provides guidance to the NRC staff for performing safety reviews for those specific areas where existing NUREG-0800, “Standard Review Plan [SRP] for the Review of Safety Analysis Reports for Nuclear Power Plants: LWR Edition,” sections do not address the unique features of the NuScale design.

    DATES:

    The DSRS sections were effective upon issuance between June 24 and August 4, 2016.

    ADDRESSES:

    Please refer to Docket ID NRC-2015-0160 when contacting the NRC about the availability of information regarding this document. You may obtain publically-available information related to this document using any of the following methods:

    • Federal Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2015-0160. Address questions about NRC dockets to Carol Gallagher; telephone: 301-415-3463; email: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
    • NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/​reading-rm/​adams.html. To begin the search, select “ADAMS Public Documents” and then select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document. The DSRS is available in ADAMS Package Accession No. ML15355A295 and the final NuScale DSRS Scope and Safety Review Matrix is also available in ADAMS under Accession No. ML16263A000. The resolution of Start Printed Page 75450comments on the draft DSRS is documented in the DSRS Public Comment Resolution Matrices (ADAMS Package Accession No. ML16083A615). In addition, for the convenience of the reader, the ADAMS accession numbers are provided in a table in the “Availability of Documents” section of this document.
    • NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Rajender Auluck, telephone: 301-415-1025; email: Rajender.Auluck@nrc.gov or Gregory Cranston, telephone: 301-415-0546; email: Gregory.Cranston@nrc.gov; both are staff members of the Office of New Reactors, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Background

    In the Staff Requirements Memorandum (SRM) COMGBJ-10-0004/COMGEA-10-0001, “Use of Risk Insights to Enhance Safety Focus of Small Modular Reactor Reviews,” dated August 31, 2010 (ADAMS Accession No. ML102510405), the Commission provided direction to the NRC staff on the preparation for, and review of, small modular reactor (SMR) applications, with a near-term focus on integral pressurized-water reactor designs. The Commission directed the NRC staff to more fully integrate the use of risk insights into pre-application activities and the review of applications and, consistent with regulatory requirements and Commission policy statements, to align the review focus and resources to risk-significant structures, systems, and components and other aspects of the design that contribute most to safety in order to enhance the effectiveness and efficiency of the review process. The Commission directed the NRC staff to develop a design-specific, risk-informed review plan for each SMR design to address pre-application and application review activities. An important part of this review plan is the DSRS. The DSRS for the NuScale design is the result of the implementation of the Commission's direction.

    II. DSRS for the NuScale Design

    The NuScale DSRS (available in ADAMS Package Accession No. ML15355A295) reflects current NRC staff safety review methods and practices which integrate risk insights and, where appropriate, lessons learned from the NRC's reviews of DC and COL applications completed since the last revision of the NUREG-0800, SRP Introduction, Part 2, “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants: Light-Water Small Modular Reactor Edition,” January 2014 (ADAMS Accession No. ML13207A315). The NuScale DSRS Scope and Safety Review Matrix provides a complete list of SRP sections and identifies which SRP sections will be used for DC, COL, or ESP reviews concerning the NuScale design; which SRP sections are not applicable to the NuScale design; which SRP sections needed modification and were reissued as DSRS sections; and which new DSRS sections were added to address a unique design consideration in the NuScale design. The final NuScale DSRS Scope and Safety Review Matrix is available in ADAMS under Accession No. ML16263A000.

    The NRC staff developed the content of the NuScale DSRS as an alternative method for evaluating a NuScale-specific application and has determined that the application may address the DSRS in lieu of addressing the SRP, with specified exceptions. These exceptions include particular review areas in which the DSRS directs reviewers to consult the SRP and others in which the SRP is used for the review as identified in the final NuScale DSRS Scope and Safety Review Matrix. If NuScale chooses to address the DSRS, the application should identify and describe all differences between the design features (DC and COL applications only), analytical techniques, and procedural measures proposed in an application and the guidance of the applicable DSRS section (or SRP section, as specified in the NuScale DSRS Scope and Safety Review Matrix), and discuss how the proposed alternative provides an acceptable method of complying with the regulations that underlie the DSRS acceptance criteria. The staff has accepted the content of the DSRS as an alternative method for evaluating whether an application complies with NRC regulations for the NuScale Small Modular Reactor applications, provided that the application does not deviate significantly from the design and siting assumptions made by the NRC staff while preparing the DSRS. If the design or siting assumptions in a NuScale application deviate significantly from the design and siting assumptions the staff used in preparing the DSRS, the staff will use the more general guidance in the SRP, as specified in sections 52.17(a)(1)(xii), 52.47(a)(9), or 52.79(a)(41) of title 10 of the Code of Federal Regulations, depending on the type of application. Alternatively, the staff may supplement the DSRS section by adding appropriate criteria to address new design or siting assumptions.

    The NRC staff issued a Federal Register notice on June 30, 2015 (80 FR 37312), to request public comments on the draft NuScale DSRS Scope and Safety review Matrix (ADAMS Accession No. ML15156B063) and the individual NuScale-specific DSRS sections referenced in the table included in the FRN. A correction Federal Register notice was published on July 9, 2015 (80 FR 39454), to identify an additional draft DSRS section for which comments were requested. In response, the NRC received comments from: NuScale Power, LLC, by letter dated August 31, 2015 (ADAMS Accession No. ML15258A081), the Nuclear Energy Institute (NEI) by letter dated August 31, 2015 (ADAMS Accession No. ML15257A012), Mark Thomson by electronic submission dated August 31, 2015 (ADAMS Accession No. ML15292A309), an anonymous submitter by electronic submission dated August 31, 2015 (ADAMS Accession No. ML15292A310), an anonymous submitter by electronic submission dated August 31, 2015 (ADAMS Accession No. ML15292A311), Clinton Ferrara by electronic submission dated August 31, 2015 (ADAMS Accession No. ML15292A333), and Paula Ferrara by electronic submission dated August 31, 2015, (ADAMS Accession No. ML15292A334). Several of these comments have been previously discussed during public meetings held in support of developing the draft DSRS sections. These comments and resolutions have been documented in the DSRS Public Comment Resolution Matrices and are publicly available (ADAMS Package Accession No. ML16083A615).

    In the June 30, 2015 Federal Register notice, the NRC requested public comments on 115 DSRS sections. The NRC staff determined whether to develop a DSRS section after considering whether significant differences in the functions, characteristics, or attributes of the NuScale design required major revision of the related SRP section guidance, or whether structures, systems, and components identified in the NuScale design are unique and not addressed by the current SRP. Following publication of the draft version of the DSRS sections, the NRC staff revisited these criteria and determined, based on the most recent NuScale design, that it is appropriate to use the related SRP section in lieu of a draft DSRS section Start Printed Page 75451in a number of cases. In these cases the draft DSRS sections have not been issued as final, and the related SRP sections will be used for the NuScale review. In deciding to use the related SRP sections, the staff has not necessarily determined that the SRP sections are wholly applicable without modification. For example, as the NRC staff gains greater understanding of the NuScale design or if the design changes during the review, the staff would assess whether different or supplemental review criteria are needed. Stakeholders who believe that different or supplemental review criteria are needed may provide these views to the NRC staff for consideration during the application review period.

    The results of determinations to use the related SRP sections rather than draft DSRS sections, along with other identified issues with the draft NuScale DSRS Scope and Safety Review Matrix, are documented in a separate “transitional” NuScale DSRS Scope and Safety Review Matrix (ADAMS Accession No. ML16076A048). The “transitional” Matrix shows the differences between the draft and final NuScale DSRS Scope and Safety Review Matrices and describes the reasons for these differences. The resulting final list of DSRS titles with corresponding section numbers and ADAMS references are provided in the table below and in ADAMS Package Accession No. ML15355A295.

    In the future, should additional SRP sections be developed, the staff will determine at that time their applicability to the NuScale design. In addition, the NRC disseminates information regarding current safety issues and proposed solutions through various means, such as generic communications and the process for treating generic safety issues. When current issues are resolved, the staff will determine the need, extent, and nature of revision that should be made to the SRP and/or DSRS to reflect the new NRC guidance.

    III. Availability of Documents

    SectionDesign-specific review standard titleADAMS accession No.
    MatrixNuScale DSRS Scope and Safety Review Matrix (Transitional)ML16076A048
    MatrixNuScale DSRS Scope and Safety Review Matrix (Final)ML16263A000
    3.5.1.3Turbine MissilesML15355A364
    3.7.1Seismic Design ParametersML15355A384
    3.7.2Seismic System AnalysisML15355A389
    3.7.3Seismic Subsystem AnalysisML15355A402
    3.8.2Steel ContainmentML15355A411
    3.8.4Other Seismic Category I StructuresML15355A444
    3.8.5FoundationsML15355A451
    3.11Environmental Qualification of Mechanical and Electrical EquipmentML15355A455
    4.4Thermal and Hydraulic DesignML15355A468
    5.2.4Reactor Coolant Pressure Boundary Inservice Inspection and TestingML15355A479
    5.2.5Reactor Coolant Pressure Boundary Leakage DetectionML15355A505
    5.3.1Reactor Vessel MaterialsML15355A513
    5.3.2Pressure-Temperature Limits, Upper-Shelf Energy, and Pressurized Thermal ShockML15355A526
    5.3.3Reactor Vessel IntegrityML15355A530
    5.4.2.1Steam Generator MaterialsML15355A532
    5.4.2.2Steam Generator ProgramML15355A535
    5.4.7Decay Heat Removal (DHR) SystemML15355A536
    BTP 5-4Design Requirements of the Decay Heat Removal SystemML15355A313
    6.2.1Containment Functional DesignML15356A259
    6.2.1.1.AContainmentsML15355A544
    6.2.1.3Mass and Energy Release Analysis for Postulated Loss-of-Coolant Accidents (LOCAs)ML15357A327
    6.2.1.4Mass and Energy Release Analysis for Postulated Secondary System Pipe RupturesML15356A241
    6.2.2Containment Heat Removal SystemsML15356A267
    6.2.4Containment Isolation SystemML15356A332
    6.2.5Combustible Gas Control in ContainmentML15356A356
    6.2.6Containment Leakage TestingML15356A388
    6.3Emergency Core Cooling SystemML15356A393
    6.6Inservice Inspection and Testing of Class 2 and 3 ComponentsML15356A396
    7.0Instrumentation and Controls—Introduction and Overview of Review ProcessML15356A416
    7.1Instrumentation and Controls—Fundamental Design PrinciplesML15363A293
    7.2Instrumentation and Controls—System CharacteristicsML15363A347
    7.0, App AInstrumentation and Controls—Hazard AnalysisML15355A316
    7.0, App BInstrumentation and Controls—System ArchitectureML15355A318
    7.0, App CInstrumentation and Controls—SimplicityML15355A319
    7.0, App DInstrumentation and Controls—ReferencesML15355A320
    8.1Electric Power—IntroductionML15356A473
    8.2Offsite Power SystemML15356A516
    8.3.1AC Power Systems (Onsite)ML15356A533
    8.3.2DC Power Systems (Onsite)ML15356A552
    8.4Station BlackoutML15356A570
    9.1.2New and Spent Fuel StorageML15356A584
    9.1.3Spent Fuel Pool Cooling and Cleanup SystemML15356A595
    9.3.4Chemical and Volume Control SystemML15356A622
    9.3.6Containment Evacuation and Flooding SystemsML15356A637
    9.5.2Communications SystemsML15363A400
    10.2.3Turbine Rotor IntegrityML15356A700
    10.3Main Steam Supply SystemML15355A322
    10.4.7Condensate and Feedwater SystemML15355A331
    11.1Source TermsML15355A333
    Start Printed Page 75452
    11.2Liquid Waste Management SystemML15355A334
    11.3Gaseous Waste Management SystemML15355A335
    11.4Solid Waste Management SystemML15355A336
    11.5Process and Effluent Radiological Monitoring Instrumentation and Sampling SystemsML15355A337
    11.6Guidance on Instrumentation and Control Design Features for Process and Effluent Radiological Monitoring, and Area Radiation and Airborne Radioactivity MonitoringML15355A338
    12.2Radiation SourcesML15350A320
    12.3-12.4Radiation Protection Design FeaturesML15350A339
    12.5Operational Radiation Protection ProgramML15350A341
    14.2Initial Plant Test Program—Design Certification and New License ApplicantsML15355A339
    14.3.5Instrumentation and Controls—Inspections, Tests, Analyses, and Acceptance CriteriaML15355A340
    15.0Introduction—Transient and Accident AnalysesML15355A302
    15.0.3Design Basis Accidents Radiological Consequence Analyses for NuScale SMR DesignML15355A341
    15.1.1—15.1.4Decrease in FW Temperature, Increase in FW Flow, Increase in Steam Flow and Inadvertent Opening of the Turbine Bypass System or Inadvertent Operation of the Decay Heat Removal SystemML15355A303
    15.1.5Steam System Piping Failures Inside and Outside of ContainmentML15355A304
    15.1.6Loss of Containment VacuumML15355A305
    15.2.1-15.2.5Loss of External Load; Turbine Trip; Loss of Condenser Vacuum; Closure of Main Steam Isolation Valve (BWR); and Steam Pressure Regulator Failure (Closed)ML15355A306
    15.2.6Loss of Non-Emergency AC Power to the Station AuxiliariesML15363A348
    15.2.7Loss of Normal Feedwater FlowML15355A307
    15.2.8Feedwater System Pipe Breaks Inside and Outside ContainmentML15355A308
    15.5.1-15.5.2Chemical and Volume Control System Malfunction that Increases Reactor Coolant InventoryML15363A397
    15.6.5LOCAs Resulting From Spectrum of Postulated Piping Breaks Within the Reactor Coolant Pressure BoundaryML15355A309
    15.6.6Inadvertent Opening of the Emergency Core Cooling SystemML15355A310
    15.9AThermal-hydraulic StabilityML15355A311
    16.0Technical SpecificationsML15355A312
    Start Signature

    Dated at Rockville, Maryland, this 21st day of October 2016.

    For the Nuclear Regulatory Commission.

    Frank Akstulewicz,

    Director, Division of New Reactor Licensing, Office of New Reactors.

    End Signature End Supplemental Information

    [FR Doc. 2016-26210 Filed 10-28-16; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Effective Date:
8/4/2016
Published:
10/31/2016
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
NuScale design-specific review standard; issuance.
Document Number:
2016-26210
Dates:
The DSRS sections were effective upon issuance between June 24 and August 4, 2016.
Pages:
75449-75452 (4 pages)
Docket Numbers:
NRC-2015-0160
PDF File:
2016-26210.pdf
Supporting Documents:
» NuScale Design-Specific Review Standard