2022-23625. Takes of Marine Mammals Incidental to Specified Activities; Taking Marine Mammals Incidental to Naval Base San Diego Pier 6 Replacement Project, San Diego, California  

  • Start Preamble

    AGENCY:

    National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce.

    ACTION:

    Notice; issuance of renewal incidental harassment authorization (IHA).

    SUMMARY:

    In accordance with the regulations implementing the Marine Mammal Protection Act (MMPA), as amended, notification is hereby given that NMFS has issued a renewal IHA to the U.S. Navy (Navy) to incidentally harass marine mammals incidental to the Naval Base San Diego Pier 6 Replacement Project in San Diego, California.

    DATES:

    This renewal IHA is valid from October 17, 2022 through September 30, 2023.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Amy Fowler, Office of Protected Resources, NMFS, (301) 427-8401. Electronic copies of the original application, Renewal request, and supporting documents (including NMFS Federal Register notices of the original proposed and final authorizations, and the previous IHA), as well as a list of the references cited in this document, may be obtained online at: https://www.fisheries.noaa.gov/​permit/​incidental-take-authorizations-under-marine-mammal-protection-act. In case of problems accessing these documents, please call the contact listed above.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    Background

    The Marine Mammal Protection Act (MMPA) prohibits the “take” of marine mammals, with certain exceptions. Sections 101(a)(5)(A) and (D) of the MMPA (16 U.S.C. 1361 et seq.) direct the Secretary of Commerce (as delegated to NMFS) to allow, upon request, the incidental, but not intentional, taking of small numbers of marine mammals by U.S. citizens who engage in a specified activity (other than commercial fishing) within a specified geographical region if certain findings are made and either regulations are proposed or, if the taking is limited to harassment, a notice of a proposed incidental take authorization is provided to the public for review.

    Authorization for incidental takings shall be granted if NMFS finds that the taking will have a negligible impact on the species or stock(s) and will not have an unmitigable adverse impact on the availability of the species or stock(s) for taking for subsistence uses (where relevant). Further, NMFS must prescribe the permissible methods of taking and other “means of effecting the least practicable adverse impact” on the affected species or stocks and their habitat, paying particular attention to rookeries, mating grounds, and areas of similar significance, and on the availability of such species or stocks for taking for certain subsistence uses (referred to here as “mitigation measures”). Monitoring and reporting of such takings are also required. The meaning of key terms such as “take,” “harassment,” and “negligible impact” can be found in section 3 of the MMPA (16 U.S.C. 1362) and the agency's regulations at 50 CFR 216.103. Start Printed Page 65579

    NMFS' regulations implementing the MMPA at 50 CFR 216.107(e) indicate that IHAs may be renewed for additional periods of time not to exceed one year for each reauthorization. In the notice of proposed IHA for the initial authorization, NMFS described the circumstances under which we would consider issuing a renewal for this activity, and requested public comment on a potential renewal under those circumstances. Specifically, on a case-by-case basis, NMFS may issue a one-time one-year renewal IHA following notice to the public providing an additional 15 days for public comments when (1) up to another year of identical or nearly identical, or nearly identical, activities as described in the Detailed Description of Specified Activities section of the initial IHA issuance notice is planned or (2) the activities as described in the Detailed Description of Specified Activities section of the initial IHA issuance notice would not be completed by the time the initial IHA expires and a renewal would allow for completion of the activities beyond that described in the DATES section of the initial IHA issuance, provided all of the following conditions are met:

    (1) A request for renewal is received no later than 60 days prior to the needed renewal IHA effective date (recognizing that the renewal IHA expiration date cannot extend beyond 1 year from expiration of the initial IHA).

    (2) The request for renewal must include the following:

    • An explanation that the activities to be conducted under the requested renewal IHA are identical to the activities analyzed under the initial IHA, are a subset of the activities, or include changes so minor ( e.g., reduction in pile size) that the changes do not affect the previous analyses, mitigation and monitoring requirements, or take estimates (with the exception of reducing the type or amount of take).

    • A preliminary monitoring report showing the results of the required monitoring to date and an explanation showing that the monitoring results do not indicate impacts of a scale or nature not previously analyzed or authorized.

    (3) Upon review of the request for renewal, the status of the affected species or stocks, and any other pertinent information, NMFS determines that there are no more than minor changes in the activities, the mitigation and monitoring measures will remain the same and appropriate, and the findings in the initial IHA remain valid.

    An additional public comment period of 15 days (for a total of 45 days), with direct notice by email, phone, or postal service to commenters on the initial IHA, is provided to allow for any additional comments on the proposed renewal. A description of the renewal process may be found on our website at: www.fisheries.noaa.gov/​national/​marine-mammal-protection/​incidental-harassment-authorization-renewals.

    History of Request

    On January 22, 2021, NMFS issued an IHA to the Navy to take California sea lions ( Zalophus californianus), by Level B harassment only, incidental to the Naval Base San Diego Pier 6 Replacement Project in San Diego, California (86 FR 7993; February 3, 2021), effective from October 1, 2021 through September 30, 2022. On July 29, 2022, NMFS received an application for the renewal of that initial IHA. As described in the application for renewal IHA, the activities for which incidental take is requested consist of activities that are covered by the initial authorization but will not be completed prior to its expiration. As required, the applicant also provided a preliminary monitoring report (available at https://www.fisheries.noaa.gov/​national/​marine-mammal-protection/​incidental-take-authorizations-construction-activities) which confirms that the applicant has implemented the required mitigation and monitoring, and which also shows that no impacts of a scale or nature not previously analyzed or authorized have occurred as a result of the activities conducted. The notice of the proposed renewal incidental harassment authorization was published on September 20, 2022 (87 FR 57480).

    Description of the Specified Activities and Anticipated Impacts

    The purpose of the Naval Base San Diego Pier 6 Replacement Project is to remove and replace a decaying and inadequate pier for Navy ships. Specifically, the planned in-water construction work authorized under the initial IHA included removing piles that supported the existing pier and installing new piles using an impact hammer. After first removing the above-water structures and utilities, the Navy planned to remove a total of 1,998 piles, including 1,833 12 to 24-inch (in) square concrete piles, 149 12-in composite (timber-plastic) piles, and 16 16-in I-shaped steel piles. Once demolition had opened up space, the Navy planned to begin construction in the same location on a new pier measuring 37 meters (m; 120 feet (ft)) wide by 457 m (1,500 ft) long. New construction work involved impact driving of 966 piles, including 528 24-in octagonal concrete structural piles, 208 24-in square concrete fender piles, four 20-in square concrete piles for a load-out ramp, and 226 16-in fiberglass secondary and corner fender piles. Pile installation and removal was expected to take no more than 250 days.

    Of the planned pile removal and installation activities described in the initial IHA, the Navy removed a total of 1,835 concrete piles over 70 days using a vibratory hammer and installed a total of 526 new concrete piles over 62 days using an impact hammer (Table 1). The Navy also removed 149 12-in composite piles and 16 16-in I-shaped steel piles using direct pull ( i.e., no pile hammer required). All planned pile removal activities described in the initial IHA have been completed. The Navy now plans to install the remaining piles over the course of approximately 54 days starting in November or early December 2022 and continuing through February 2023.

    The types of impacts of the Navy's planned activities are identical to those described in the initial IHA. As in the initial IHA, NMFS anticipates that only the U.S. stock of California sea lions may be taken by Level B harassment incidental to underwater noise resulting from construction associated with the remaining planned activities.

    The following documents are referenced in this notice and include important supporting information:

    Federal Register notice of proposed initial IHA (85 FR 80027; December 11, 2020);

    Federal Register notice of final initial IHA (86 FR 7993; February 3, 2021); and

    • Initial IHA application, references cited, IHA renewal request, and preliminary monitoring report (available at www.fisheries.noaa.gov/​national/​marine-mammal-protection/​incidental-take-authorizations-construction-activities).

    Detailed Description of the Activity

    The purpose of the project is to remove and replace a decaying and inadequate pier built in 1945. A new, wider pier is needed to provide adequate ship berthing infrastructure to support modern Navy ships and fleet readiness. All in-water demolition ( i.e., pile removal) and installation of concrete structural piles has been completed. The remaining in-water construction activities covered under this IHA renewal include the following:

    • Impact installation of 204 2-in square concrete fender piles; and

    • Impact installation of 226 16-in round fiberglass fender piles. Start Printed Page 65580

    Table 1—Summary of Completed and Remaining Pile Driving Activities

    MethodPile typeNumber of piles planned in initial IHANumber of piles completedNumber of piles remainingTotal days of completed workTotal estimated days remaining
    Demolition of Existing Pier:
    Vibratory Extraction, High-pressure Water Jetting, Hydraulic Pile Clipper, and/or Hydraulic Chainsaw24-in square pre-cast concrete, 20-in square pre-stressed/pre-cast concrete piles1,833a  1,8350700
    12-in composite (timber-plastic) piles149b  1490
    Vibratory Extraction16-in I-shaped steel piles16b  160
    Total1,9981,8350
    Construction of New Pier:
    Impact Pile Driving24-in octagonal concrete structural test piles15906254
    24-in octagonal concrete structural piles5135170
    24-in square concrete fender system test piles4c  0c  0
    24-in square concrete primary fender piles2040204
    20-in square concrete pile for load-out ramp cradle4d  0d  0
    16-in fiberglass secondary and corner fender piles2260226
    Total96652643013254
    a  Note that the total observed piles removed (1,835 piles) exceeds by two the proposed number of 20-in and 24-in piles described in the initial IHA (1,833 piles). This is likely due to command PSOs double counting piles as a result of difficulties encountered when viewing/tracking the large number of piles removed during the course of demolition activities at Pier 6.
    b  All 12-in composite piles and 16-inch I-shaped steel piles were removed via direct pull with no vibratory hammer required.
    c  24-in square concrete fender system test piles have been removed from the construction plan.
    d  These 20-in square concrete piles were changed to 24-in octagonal concrete piles and are included in the total number of 24-in octagonal concrete piles installed above.

    A detailed description of the construction activities for which authorization of take is authorized here may be found in the Federal Register notice of proposed IHA for the initial IHA (85 FR 80027; December 11, 2020). The location, timing ( e.g., seasonality), and nature of the pile driving operations, including the type and size of piles and the methods of pile driving, are identical to those analyzed in the initial IHA. The IHA renewal is effective from DATE through September 30, 2023.

    Description of Marine Mammals

    A description of the marine mammals in the area of the activities for which authorization of take is authorized here, including information on abundance, status, distribution, and hearing, may be found in the Federal Register notice of the proposed IHA for the initial authorization (85 FR 80027; December 11, 2020). NMFS has reviewed the monitoring data from the initial IHA, recent Stock Assessment Reports, information on relevant Unusual Mortality Events, and other scientific literature, and determined that neither this nor any other new information affects which species or stocks have the potential to be affected or the pertinent information in the Description of the Marine Mammals in the Area of Specified Activities contained in the supporting documents for the initial IHA.

    Potential Effects on Marine Mammals and Their Habitat

    A description of the potential effects of the specified activity on marine mammals and their habitat for the activities for which take is authorized here may be found in the Federal Register notice of the proposed IHA for the initial authorization (85 FR 80027; December 11, 2020). NMFS has reviewed the monitoring data from the initial IHA, recent Stock Assessment Reports, information on relevant Unusual Mortality Events, and other scientific literature, and determined that neither this nor any other new information affects our initial analysis of impacts on marine mammals and their habitat.

    Estimated Take

    A detailed description of the methods and inputs used to estimate take for the specified activity are found in the Federal Register notice for the proposed and final initial IHAs (85 FR 80027; December 11, 2020 and 86 FR 7993; February 3, 2021). Specifically, the source levels and marine mammal occurrence data applicable to this authorization remain unchanged from the previously issued IHA, with the exception of fewer days of activity since the planned activities are a subset of those covered in the initial IHA. Similarly, the stocks taken, methods of take, and types of take remain unchanged from the previously issued IHA.

    Based on the number of piles to be installed, the Navy estimates that the remaining activity would take 54 days (Table 1). As in the initial IHA, the Navy estimates four California sea lions could be present in the project area each day. Multiplication of the above estimate of animals per day (4) times the days of work (54) results in an estimated 216 Level B harassment takes of California sea lions (Table 2). The Navy intends to avoid Level A harassment take by shutting down activities if a California sea lion approaches within 20 m of the project site, which encompasses all Level A harassment ensonification Start Printed Page 65581 zones. Therefore, no take by Level A harassment is anticipated or authorized.

    Table 2—Authorized Take and Proportion of Stock Potentially Affected

    SpeciesDays of activity remainingEstimated daily occurrence (# per day)Authorized take by Level B harassmentAuthorized take by Level A harassmentPercent of stock
    California sea lion ( Zalophus californianus) U.S. Stock54421600.08

    Description of Mitigation, Monitoring and Reporting Measures

    With the exception of measures specific to vibratory pile removal that are not relevant to this IHA renewal, the mitigation, monitoring, and reporting measures included as requirements in this authorization are identical to those included in the Federal Register notice announcing the issuance of the initial IHA (86 FR 7993; February 3, 2021), and the discussion of the least practicable adverse impact included in that document remains accurate. The following measures are included in this renewal:

    Mitigation

    Establishment of Shutdown Zones— The Navy must establish shutdown zones for all pile driving and removal activities. The purpose of a shutdown zone is generally to define an area within which shutdown of the activity would occur upon sighting of a marine mammal (or in anticipation of an animal entering the defined area). Shutdown zones typically vary based on the activity type and marine mammal hearing group (Table 3). In this case, there is only one species affected and all Level A harassment isopleths are less than 10 m radius. To be conservative, the Navy must establish a 20 m shutdown zone for all pile driving or removal activities.

    The placement of Protected Species Observers (PSOs) during all pile driving and removal activities (described in detail in the Monitoring section below) must ensure that the entire shutdown zone is visible during pile installation. Should environmental conditions deteriorate such that marine mammals within the entire shutdown zone would not be visible ( e.g., fog, heavy rain), pile driving and removal must be delayed until the PSO is confident marine mammals within the shutdown zone could be detected.

    For in-water heavy machinery work other than pile driving, if a marine mammal comes within 10 m, operations must cease and vessels must reduce speed to the minimum level required to maintain steerage and safe working conditions. This type of work could include the following activities: (1) movement of the barge to the pile location; or (2) positioning of the pile on the substrate via a crane ( i.e., stabbing the pile).

    The Navy must conduct briefings between construction supervisors and crews and the marine mammal monitoring team prior to the start of all pile driving activity and when new personnel join the work, to explain responsibilities, communication procedures, marine mammal monitoring protocol, and operational procedures.

    For marine mammal species for which take by Level B harassment has not been authorized, in-water pile driving must shut down immediately if such species are observed within or entering the Level B harassment zone.

    If take reaches the authorized limit for an authorized species, pile installation must be stopped as these species approach the Level B harassment zone to avoid additional take.

    Monitoring for Level B Harassment —The Navy must monitor the Level A and B harassment zones. Monitoring zones provide utility for observing by establishing monitoring protocols for areas adjacent to the shutdown zones. Monitoring zones enable observers to be aware of and communicate the presence of marine mammals in the project area outside the shutdown zone and thus prepare for a potential halt of activity should the animal enter the shutdown zone. Placement of PSOs must allow PSOs to observe marine mammals within the Level B harassment zones.

    Soft Start —Soft-start procedures are believed to provide additional protection to marine mammals by providing warning and/or giving marine mammals a chance to leave the area prior to the impact hammer operating at full capacity. For impact pile driving, contractors are required to provide an initial set of three strikes from the hammer at reduced energy, followed by a 30-second waiting period. This procedure must be conducted three times before impact pile driving begins. Soft start must be implemented at the start of each day's impact pile driving and at any time following cessation of impact pile driving for a period of 30 minutes or longer.

    Pre-activity Monitoring —Prior to the start of daily in-water construction activity, or whenever a break in pile driving/removal of 30 minutes or longer occurs, PSOs must observe the shutdown and monitoring zones for a period of 30 minutes. The shutdown zone is considered cleared when a marine mammal has not been observed within the zone for that 30-minute period. If a marine mammal is observed within the shutdown zone, a soft-start must not proceed until the animal has left the zone or has not been observed for 15 minutes. When a marine mammal for which Level B harassment take is authorized is present in the Level B harassment zone, activities may begin and Level B harassment take will be recorded. If the entire Level B harassment zone is not visible at the start of construction, pile driving activities can begin. If work ceases for more than 30 minutes, the pre-activity monitoring of the shutdown zones must commence.

    Monitoring

    Marine mammal monitoring during pile driving and removal must be conducted by NMFS-approved PSOs in a manner consistent with the following:

    • Independent PSOs ( i.e., not construction personnel) who have no other assigned tasks during monitoring periods must be used;

    • At least one PSO must have prior experience performing the duties of a PSO during construction activity pursuant to a NMFS-issued incidental take authorization;
    • Other PSOs may substitute education (degree in biological science or related field) or training for experience;

    • Where a team of three or more PSOs are required, a lead observer or monitoring coordinator must be designated. The lead observer must have prior experience performing the duties of a PSO during construction activity pursuant to a NMFS-issued incidental take authorization; and Start Printed Page 65582

    • The Navy must submit PSO Curriculum Vitae for approval by NMFS prior to the onset of pile driving.

    PSOs must have the following additional qualifications:

    • Ability to conduct field observations and collect data according to assigned protocols;
    • Experience or training in the field identification of marine mammals, including the identification of behaviors;
    • Sufficient training, orientation, or experience with the construction operation to provide for personal safety during observations;
    • Writing skills sufficient to prepare a report of observations including but not limited to the number and species of marine mammals observed; dates and times when in-water construction activities were conducted; dates, times, and reason for implementation of mitigation (or why mitigation was not implemented when required); and marine mammal behavior; and
    • Ability to communicate orally, by radio or in person, with project personnel to provide real-time information on marine mammals observed in the area as necessary.

    Up to four PSOs must be employed. PSO locations must provide an unobstructed view of all water within the shutdown zone, and as much of the Level A and Level B harassment zones as possible. PSO locations are as follows:

    (1) At the pile driving/removal site or best vantage point practicable to monitor the shutdown zones;

    (2) For activities with Level B harassment zones larger than 400 m ( i.e., water jetting), two additional PSO locations must be used. One must be across from the project location along Inchon Road at Naval Amphibious Base Coronado; and

    (3) Two additional PSOs must be located in a small boat. The boat must conduct a pre-activity survey of the entire monitoring area prior to in-water construction. The boat must start from south of the project area (where potential marine mammal occurrence is lowest) and proceed to the north. When the boat arrives near the northern boundary of the Level B harassment zone ( e.g., just north of the western side of the Coronado Bridge as depicted in the Figures in the monitoring plan) it must set up a station so the PSOs are best situated to detect any marine mammals that may approach from the north. The two PSOs aboard must split monitoring duties in order to monitor a 360 degree sweep around the vessel with each PSO responsible for 180 degrees of observable area.

    Monitoring must be conducted 30 minutes before, during, and 30 minutes after pile driving/removal activities. In addition, observers must record all incidents of marine mammal occurrence, regardless of distance from activity, and must document any behavioral reactions in concert with distance from piles being driven or removed. Pile driving activities include the time to install or remove a single pile or series of piles, as long as the time elapsed between uses of the pile driving or drilling equipment is no more than 30 minutes.

    Hydroacoustic Monitoring and Reporting —The Navy has volunteered to conduct hydroacoustic monitoring of all pile driving and removal methods. Data must be collected for a representative number of piles (three to five) for each pile size and/or type. As part of the below-mentioned report, or in a separate report with the same timelines as above, the Navy must provide an acoustic monitoring report for this work. Hydroacoustic monitoring results could be used to adjust the size of the Level B harassment and monitoring zones after a request is made and approved by NMFS. The acoustic monitoring report must, at minimum, include the following:

    • Hydrophone equipment and methods: recording device, sampling rate, distance (m) from the pile where recordings were made; depth of recording device(s);
    • Type of pile being driven or removed, substrate type, method of driving or removal during recordings;
    • For impact pile driving: Pulse duration and mean, median, and maximum sound levels (dB re: 1µPa): SELcum, peak sound pressure level (SPLpeak), and single-strike sound exposure level (SELs-s);

    • For non-impulsive sources ( e.g., water jetting): Mean, median, and maximum sound levels (dB re: 1µPa): root mean square sound pressure level (SPLrms), SELcum; and

    • Number of strikes (impact) or duration (non-impulsive sources) per pile measured, one-third octave band spectrum and power spectral density plot.

    Reporting

    A draft marine mammal monitoring report must be submitted to NMFS within 90 days after the completion of pile driving and removal activities, or 60 days prior to a requested date of issuance of any future IHAs for projects at the same location, whichever comes first. The report must include an overall description of work completed, a narrative regarding marine mammal sightings, and associated PSO data sheets. Specifically, the report must include:

    • Dates and times (begin and end) of all marine mammal monitoring;

    • Construction activities occurring during each daily observation period, including how many and what type of piles were driven or removed and by what method ( i.e., impact or vibratory and if other removal methods were used);

    • Weather parameters and water conditions during each monitoring period ( e.g., wind speed, percent cover, visibility, sea state);

    • The number of marine mammals observed, by species, relative to the pile location and if pile driving or removal was occurring at time of sighting;
    • Age and sex class, if possible, of all marine mammals observed;
    • PSO locations during marine mammal monitoring;
    • Distances and bearings of each marine mammal observed to the pile being driven or removed for each sighting (if pile driving was occurring at time of sighting);
    • Description of any marine mammal behavior patterns during observation, including direction of travel and estimated time spent within the Level A and Level B harassment zones while the source was active;
    • Number of individuals of each species (differentiated by month as appropriate) detected within the monitoring zone;

    • Detailed information about any implementation of any mitigation triggered ( e.g., shutdowns and delays), a description of specific actions that ensued, and resulting behavior of the animal, if any; and

    • Description of attempts to distinguish between the number of individual animals taken and the number of incidences of take, such as ability to track groups or individuals.

    If no comments are received from NMFS within 30 days, the draft final report will constitute the final report. If comments are received, a final report addressing NMFS comments must be submitted within 30 days after receipt of comments.

    Reporting Injured or Dead Marine Mammals

    In the event that personnel involved in the construction activities discover an injured or dead marine mammal, the Navy must report the incident to the Office of Protected Resources (OPR), NMFS, and to the regional stranding coordinator as soon as feasible. If the death or injury was clearly caused by the specified activity, the Navy must Start Printed Page 65583 immediately cease the specified activities until NMFS is able to review the circumstances of the incident and determine what, if any, additional measures are appropriate to ensure compliance with the terms of the IHA. The Navy must not resume their activities until notified by NMFS. The report must include the following information:

    • Time, date, and location (latitude/longitude) of the first discovery (and updated location information if known and applicable);
    • Species identification (if known) or description of the animal(s) involved;
    • Condition of the animal(s) (including carcass condition if the animal is dead);
    • Observed behaviors of the animal(s), if alive;
    • If available, photographs or video footage of the animal(s); and
    • General circumstances under which the animal was discovered.

    Comments and Responses

    A notice of NMFS' proposal to issue a renewal IHA to the Navy was published in the Federal Register on September 20, 2022 (87 FR 57480). That notice either described, or referenced descriptions of, the Navy's activity, the marine mammal species that may be affected by the activity, the anticipated effects on marine mammals and their habitat, estimated amount and manner of take, and proposed mitigation, monitoring and reporting measures. During the 15-day public comment period, NMFS received no public comments.

    Determinations

    The construction activities planned by the Navy are a subset of those analyzed in the initial IHA, as are the method of taking and the effects of the action. The planned number of days of activity are reduced given the completion of a portion of the originally planned work. The potential effects of the Navy's activities are limited to Level B harassment in the form of behavioral disturbance and temporary threshold shift. In analyzing the effects of the activities in the initial IHA, NMFS determined that the Navy's activities would have a negligible impact on the affected species or stocks and that the authorized take numbers of each species or stock were small relative to the relevant stocks ( e.g., less than one-third of the abundance of all stocks). The mitigation measures and monitoring and reporting requirements as described above are identical to the initial IHA.

    NMFS has concluded that there is no new information suggesting that our analysis or findings should change from those reached for the initial IHA. Based on the information and analysis contained here and in the referenced documents, NMFS has determined the following: (1) the required mitigation measures will effect the least practicable impact on marine mammal species or stocks and their habitat; (2) the authorized takes will have a negligible impact on the affected marine mammal species or stocks; (3) the authorized takes represent small numbers of marine mammals relative to the affected stock abundances; (4) the Navy's activities will not have an unmitigable adverse impact on taking for subsistence purposes as no relevant subsistence uses of marine mammals are implicated by this action; and (5) appropriate monitoring and reporting requirements are included.

    National Environmental Policy Act

    To comply with the National Environmental Policy Act of 1969 (NEPA; 42 U.S.C. 4321 et seq.) and NOAA Administrative Order (NAO) 216-6A, NMFS must review our action ( i.e., the issuance of an IHA renewal) with respect to potential impacts on the human environment.

    This action is consistent with categories of activities identified in Categorical Exclusion B4 (IHAs with no anticipated serious injury or mortality) of the Companion Manual for NOAA Administrative Order 216-6A, which do not individually or cumulatively have the potential for significant impacts on the quality of the human environment and for which we have not identified any extraordinary circumstances that would preclude this categorical exclusion. Accordingly, NMFS has determined that the issuance of the proposed IHA renewal qualifies to be categorically excluded from further NEPA review.

    Endangered Species Act

    Section 7(a)(2) of the Endangered Species Act of 1973 (ESA; 16 U.S.C. 1531 et seq.) requires that each Federal agency insure that any action it authorizes, funds, or carries out is not likely to jeopardize the continued existence of any endangered or threatened species or result in the destruction or adverse modification of designated critical habitat. No incidental take of ESA-listed marine mammal species is expected to result from this activity, and none would be authorized. Therefore, NMFS has determined that consultation under section 7 of the ESA is not required for this action.

    Renewal

    NMFS has issued a renewal IHA to the Navy for the take of marine mammals incidental to conducting the Naval Base San Diego Pier 6 Replacement Project in San Diego, California, effective from October 17, 2022 through September 30, 2023.

    Start Signature

    Dated: October 21, 2022.

    Kimberly Damon-Randall,

    Director, Office of Protected Resources, National Marine Fisheries Service.

    End Signature End Supplemental Information

    [FR Doc. 2022-23625 Filed 10-28-22; 8:45 am]

    BILLING CODE 3510-22-P

Document Information

Published:
10/31/2022
Department:
National Oceanic and Atmospheric Administration
Entry Type:
Notice
Action:
Notice; issuance of renewal incidental harassment authorization (IHA).
Document Number:
2022-23625
Dates:
This renewal IHA is valid from October 17, 2022 through September 30, 2023.
Pages:
65578-65583 (6 pages)
Docket Numbers:
RTID 0648-XC458
PDF File:
2022-23625.pdf