[Federal Register Volume 59, Number 192 (Wednesday, October 5, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-24546]
[[Page Unknown]]
[Federal Register: October 5, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Project No. 2607-001 North Carolina]
Duke Power Co.; Availability of Draft Environmental Assessment
September 29, 1994.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission's)
regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office
of Hydropower Licensing has reviewed the application for a subsequent
license for the existing Spencer Mountain Hydroelectric Project,
located on the South Fork Catawba River in Gaston County, North
Carolina, near the city of Gastonia, and has prepared a Draft
Environmental Assessment (DEA) for the project. In the DEA, the
Commission's staff has analyzed the existing and potential future
environmental effects of the project and concludes that approval of the
project would not be a major federal action significantly affecting the
quality of the human environment.
Copies of the DEA are available for review in the Public Reference
Branch, Room 3104, of the Commission's offices at 941 North Capitol
Street, NE., Washington, DC 20426.
Any comments should be filed within 30 days from the date of this
notice and should be addressed to Lois D. Cashell, Secretary, Federal
Energy Regulatory Commission, 825 North Capitol Street, NE.,
Washington, DC 20426. All comments should clearly show the following
caption on the first page: SPENCER MOUNTAIN HYDROELECTRIC PROJECT, FERC
NO. 2607.001. For further information, contact Kim A. Nguyen,
Environmental Coordinator, at (202) 219-2841.
Lois D. Cashell,
Secretary.
[FR Doc. 94-24546 Filed 10-4-94; 8:45 am]
BILLING CODE 6717-01-M