94-24580. Proposed Finding of No Significant Impact; Proposed Tokamak Physics Experiment, Princeton Plasma Physics Laboratory  

  • [Federal Register Volume 59, Number 192 (Wednesday, October 5, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-24580]
    
    
    [[Page Unknown]]
    
    [Federal Register: October 5, 1994]
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF ENERGY
     
    
    Proposed Finding of No Significant Impact; Proposed Tokamak 
    Physics Experiment, Princeton Plasma Physics Laboratory
    
    AGENCY: U.S. Department of Energy.
    
    ACTION: Proposed finding of no significant impact.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The Department of Energy (DOE) has prepared this Proposed 
    Finding of No Significant Impact (FONSI) on its proposal to construct 
    and operate the proposed Tokamak Physics Experiment. This proposed 
    finding is based on the DOE Tokamak Fusion Test Reactor Decontamination 
    and Decommissioning Project and Tokamak Physics Experiment (TPX) 
    Environmental Assessment (EA), DOE/EA-0813, August 1994, which 
    evaluates the environmental effects of using the existing Tokamak 
    Fusion Test Reactor (TFTR) systems and accessory facilities in the 
    proposed construction and operation of the TPX. The purpose of the TPX 
    is to develop fusion energy to compensate for dwindling supplies of 
    fossil fuels and the eventual depletion of fissionable uranium used in 
    present-day nuclear reactors. Proceeding with the TPX is contingent on 
    use of existing TFTR systems and appurtenant facilities. 
    Decontamination and decommissioning of the TFTR is an integral part of 
    the scope of the proposed TPX; therefore both projects are evaluated in 
    this EA.
        Based on the analyses in the EA, the DOE believes that the proposed 
    action is not a major Federal action significantly affecting the 
    quality of the human environment within the meaning of the National 
    Environmental Policy Act (NEPA) of 1969, 42 U.S.C. 4321 et seq. 
    Therefore, the DOE is issuing a Proposed FONSI pursuant to the Council 
    on Environmental Quality regulations implementing NEPA (40 CFR Parts 
    1500-1508) and the DOE NEPA implementing regulations (10 CFR Part 
    1021). DOE will consider comments received in making a final 
    determination on whether to issue a FONSI or to prepare an 
    environmental impact statement.
    
    DATES: Comments on the proposed FONSI should be postmarked November 4, 
    1994, to ensure consideration. Comments postmarked after that date will 
    be considered to the extent practicable.
    
    ADDRESSES: Written comments on the proposed FONSI and requests for 
    copies of the TPX EA should be directed to: Dr. W.S. White, U.S. 
    Department of Energy, 9800 South Cass Avenue, Argonne, Illinois 60439, 
    (708) 252-2101.
    
    FOR FURTHER INFORMATION CONTACT:
    Requests for further information on the proposed project should be sent 
    to: Milton D. Johnson, Manager, Princeton Area Office, U.S. Department 
    of Energy, P.O. Box 102, Princeton, New Jersey 08542, (609) 243-3700.
        For general information on the DOE NEPA review process, contact: 
    Carol M. Borgstrom, U.S. Department of Energy, Office of NEPA Oversight 
    (EH-25), 1000 Independence Avenue, SW., Washington, D.C. 20585, (202) 
    586-4600 or (800) 472-2756.
    
    SUPPLEMENTARY INFORMATION:
    
    Proposed Action
    
        The proposed action is to use the existing TFTR systems and 
    accessory facilities in the construction and operation of TPX, which 
    would be primarily located inside the existing TFTR Test Cell. The TPX 
    would require dismantlement and removal of all TFTR activated systems 
    within the TFTR Test Cell Complex. Dismantlement and removal of 
    nonradioactive and low activation components in areas such as the Test 
    Cell Basement and the Hot Cell, would start immediately after the 
    conclusion of the TFTR deuterium-tritium experiment, which is expected 
    to conclude in Fiscal Year 1995. Cool-down of the Tokamak in the test 
    cell will commence at that time.
        The TPX is being proposed as a national facility for fusion energy 
    research to be built at the Princeton Plasma Physics Laboratory (PPPL). 
    Its primary mission is to develop the scientific basis for an 
    economical, more compact, and continuously operating Tokamak in support 
    of the design of an attractive demonstration fusion power plant.
        Waste from decontamination and decommissioning would include 
    stainless steel and aluminum structures, piping, copper coils, graphite 
    tiles, solidified radioactive liquids, anti-contamination materials, 
    and concrete rubble. Waste would be packaged into Department of 
    Transportation (DOT) approved containers and transported to the DOE 
    Hanford site in Richland, Washington, as are current PPPL wastes. 
    Approximately 950 m3 (33,500 ft3) of waste weighing 
    approximately 2270 metric tonnes (2500 tons) would also be disposed. 
    Construction of a radioactive waste storage building for temporary 
    storage of radioactive waste and final preparation of some radioactive 
    waste shipments would be required. This facility would be approximately 
    560 m2 (6000 ft2) in size, and would be constructed within 
    the existing TFTR facility fence. A second storm water detention basin 
    similar to and west of the existing detention basin would also be 
    constructed.
        Decontamination and decommissioning of the TFTR Test Cell could be 
    completed in approximately 1.5 years, after a 2-year cool-down period. 
    TPX construction would minimally overlap decontamination and 
    decommissioning of TFTR facilities. The TFTR Test Cell Complex would 
    then be available for the TPX approximately 3.5 years after termination 
    of TFTR deuterium-tritium experiments. The total cost for the 
    decontamination and decommissioning of the TFTR is estimated to be $86 
    million.
        The construction and operation of the TPX would take place within 
    the existing TFTR facility at Princeton Plasma Physics Laboratory 
    (PPPL), with construction scheduled to begin in early FY-1998. The TPX 
    conceptual design is based on the use of deuterium fuel, but does not 
    preclude the potential upgrade and use of tritium fuel in the final 
    year of operation. Existing TFTR facilities would be adapted and used 
    by the TPX, including TFTR Test Cell Complex; ventilation exhaust vent 
    and intake shafts; mockup building; tritium cleanup/waste handling 
    area; field coil power conversion building; neutral beam power 
    conversion building; radioactive waste systems space; office and 
    technical support space; and miscellaneous PPPL support facilities. In 
    addition to providing space for the TPX, the TFTR Test Cell Complex 
    would provide shielding (via concrete walls, roof, and floor), and 
    provide for confinement and handling of tritium-contaminated and/or 
    radioactive components.
        The cost for construction of the TPX is estimated at $500M (FY-93), 
    with the construction period 1997 to 2000. New facilities to be 
    constructed include TFTR Test Cell building modifications, a new 
    Cryogenic Equipment building, tank yards for water cooling and 
    cryogenic tanks, and a new electrical substation. The Test Cell 
    building modifications would be internal and would not increase the 
    existing external dimensions of the building. The Cryogenic Equipment 
    building would be constructed as a standard industrial single-story 
    building, totaling about 1000 m2 (10,800 ft2) in area. The 
    tank yard construction would include approximately 2,130 m2 
    (22,950 ft2) of new tank yard areas for new gaseous helium tanks, 
    liquid nitrogen storage tanks, water storage tanks, and truck-trailer 
    access. This construction would take place on existing open space. The 
    electrical substation construction would involve installation of a new 
    138 kV transmission line between the existing substation and the new 
    substation. The new substation would be for transforming 138 kV power 
    to 13.8 kV. A new electric power line would be constructed entirely on 
    PPPL property.
        Machine assembly would be scheduled for 1998, with the first 
    operations during 2000. The TPX would be fueled with hydrogen and 
    deuterium plasmas for 10 years; radiation generation would not be 
    significant in terms of neutron activation of components or 
    radiological doses. In deuterium operation, the peak fusion power would 
    not exceed 140 kW. During long pulse deuterium operation, neutrons with 
    energies of 2.45 mega electron volts (MeV) would be the primary 
    neutrons produced, and annual production of these neutrons would be 
    limited to 6.0  x  1021 neutrons. A smaller number of 14.1 MeV 
    neutrons would be produced from deuterium-tritium fusion reactions with 
    tritium produced from the deuterium-deuterium fusion reactions. The 
    number of 14.1 MeV neutrons produced during deuterium operations would 
    be approximately 2% of the number of 2.45 MeV neutrons produced.
        The TPX facility would be capable of operating with deuterium-
    tritium plasmas during the last year of TPX operation. During 
    deuterium-tritium operation, a fully-formed deuterium plasma would be 
    developed (requiring up to roughly 1,000 seconds), into which tritium 
    would be injected. Once tritium has been injected, the device would 
    operate for 2 seconds with a peak fusion power of 15 MW, after which 
    the plasma would be terminated. During the 2 seconds of deuterium-
    tritium operation, both 2.45 MeV neutrons and 14.1 MeV neutrons would 
    be produced, from deuterium-deuterium and deuterium-tritium fusion 
    reactions, respectively. Production of 2.45 MeV neutrons during 
    deuterium-tritium operation would be approximately 1% of the 14.1 MeV 
    neutron production rate. Operation of the Tokamak would be controlled 
    to limit annual neutron production so that the site boundary dose 
    restriction adopted by the project would not be exceeded. The 
    deuterium-tritium phase (if used) would be limited to the last year of 
    TPX operation. Small amounts of tritium, and air activation products 
    would be released, and minor amounts of direct radiation would result 
    from fusion neutrons and activated structural components of TPX.
        Low-level solid radioactive wastes generated during TPX operations 
    would consist of contaminated items (e.g., protective clothing) and 
    solidified liquid wastes (tritiated water absorbed on desiccant and 
    solidified liquid waste from the decontamination area). The volume of 
    waste would be similar to that generated by TFTR operations, which was 
    appropriated 7.4 m3 per year for deuterium-deuterium operations, 
    and is projected to increase during deuterium-tritium operations to 
    28.3 m3 per year (1000 ft3 per year). Wastes generated during 
    TPX operations would be packaged to comply with applicable DOE and DOT 
    requirements and is expected to be shipped to the DOE Hanford 
    Reservation in Washington for disposal, as are current PPPL wastes.
    
    Alternatives
    
        Three alternatives were considered: (1) The proposed action, use of 
    the TFTR facilities for the proposed construction and operation of the 
    TPX at PPPL, (2) proposed construction and operation of the TPX at the 
    Oak Ridge Reservation in Tennessee, and (3) no action. Location of the 
    TPX at the Oak Ridge Gaseous Diffusion Plant, near Knoxville, 
    Tennessee, would require construction of new support facilities 
    including a new test cell, hot cell, waste handling and storage areas, 
    field coil power conversion building, and cryogenic facilities. The 
    additional cost and time would jeopardize the U.S. fusion program and 
    make the TPX project infeasible. Under the no action alternative, 
    decontamination and decommission of TFTR facilities would occur under 
    current management practices, but may involve a longer delay between 
    safe shutdown activities and commencement of decontamination and 
    decommissioning activities. The longer delay would not fit within the 
    current schedule to meet the construction of the TPX. This delay may in 
    turn be followed by a 2-3 year period of delay, during which the TFTR 
    facility would be in a state of protective custody. The TPX would not 
    proceed under the no action alternative.
    
    Environmental Impacts
    
        The Environmental Assessment analyzed the impacts of the TFTR 
    decontamination and decomissioning and TPX construction and operation 
    on the environment and on the health and safety of workers and the 
    public. Both routine operations and off-normal or accident scenarios 
    were assessed. The Environmental Assessment considered impacts to air 
    quality, noise, water quality and quantity, aquatic and terrestrial 
    ecology, threatened and endangered species, the visual environment, 
    land use, historical and archaeological resources, socioeconomic 
    environment, radiological conditions, and impacts of potential 
    accidents. No significant environmental impacts associated with the 
    proposed action are anticipated.
        Activities associated with decontamination and decommissioning of 
    the TFTR would not present any long-term or adverse nonradiological 
    impacts to the public or the environment. It would result in minor 
    impacts, consisting primarily of commitment of a small area of onsite 
    land for the radioactive waste storage building and the second storm 
    water detention basin. Construction of the radioactive waste storage 
    building and storm water detention basin may result in a temporary 
    small increase of effluent to Bee Brook, but would not exceed PPPL New 
    Jersey Pollutant Discharge Elimination System permit or other State or 
    federal regulatory requirements.
        Potential radiological impacts of TFTR decontamination and 
    decommissioning would not represent potential impacts greater than 
    those from current PPPL operations, which have had no significant 
    consequences. Decontamination and decommissioning activities would 
    result in a dose of less than the adopted design objective of 10 mrem 
    per year to any member of the public from all project sources. It would 
    result in minor releases of activated metal and tritium to the 
    atmosphere and sewer system. The maximum calculated individual public 
    dose would be 2.3 mrem per year, and the increased probability of 
    incremental lifetime cancer risk associated with exposure from this 
    dose would be 1.1 chances in 1,000,000. This very low calculated effect 
    means insignificant risk to the public. Occupational doses would not 
    exceed the PPPL administrative limit of 1 rem per year, which is less 
    than the DOE limit of 5 rem per year.
        Operational occurrences during decontamination and decommissioning 
    that could result in the accidental release of tritium, activated 
    gases, or solids consist primarily of component failures and human 
    error, and any releases would be limited by inventories within the 
    components. The largest calculated dose to the public from 
    decontamination and decommissioning accident scenarios, including 
    beyond design basis accidents, is 390 mrem to a maximally exposed 
    member of the public. The increased probability of incremental lifetime 
    cancer risk associated with exposure from this dose would be 195 
    chances in 1,000,000.
        The TPX would not present long-term or adverse nonradiological 
    impacts to the public or the environment at the PPPL site. Other TPX 
    nonradiological impacts would be temporary, except for the commitment 
    of a small parcel of land for construction of new TPX facilities. 
    Construction impacts due to test cell modifications and construction of 
    the cryogenic equipment building, tank yards, and electric substation 
    would be minor. All construction would be built on land already 
    committed to DOE operations. This construction would all be within the 
    current land use restrictions governing PPPL site agreements with the 
    DOE. For a construction project of this scope, the potential exists for 
    2.5 lost workday cases (work related injuries that require time-off 
    from work) over the construction period. Also there would be a 10% 
    increase in the current amount of site traffic, which would increase 
    the potential for on-site vehicular accidents slightly.
        Radiological impacts from the TPX would not exceed current impacts 
    from PPPL operations, which has not been shown to cause incremental 
    lifetime cancer risk associated with exposure. Potential environmental, 
    safety, and health radiological impacts were evaluated for both 
    deuterium and possible future tritium operations. Atmospheric releases 
    of tritium and activation products constitute the potential sources of 
    radiological exposure to members of the public. Maximum projected 
    atmospheric releases would result in annual effective dose equivalents 
    of 1.2 mrem and 4.6 mrem to a hypothetical maximally-exposed individual 
    at the site boundary during deuterium and tritium operations, 
    respectively, with a maximum increased probability of incremental 
    lifetime cancer risk associated with exposure of 2.3 chances in 
    1,000,000. These conservatively-calculated dose equivalents are less 
    than the most restrictive limit for public doses caused by airborne 
    releases (the EPA limit of 10 mrem per year). Direct radiation from the 
    TPX would be mitigated with shielding to keep the total effective dose 
    equivalent from all sources at the site boundary within the project 
    design objective of less than or equal to 10 mrem per year. This design 
    objective effective dose equivalent is well below the DOE limit of 100 
    mrem per year to members of the public from routine DOE operations.
        Normal TPX deuterium-tritium operations would result in total 
    estimated collective effective dose equivalents of 7.5 person-rem per 
    year and 24 person-rem per year to the projected population within the 
    80 km (50 mi) radius area surrounding PPPL during deuterium and tritium 
    operations, respectively. These doses amount to an average effective 
    dose equivalent of less than 0.002 mrem per year to each individual in 
    the assessment area and would result in less than 1 health effect in 
    the exposed population. On the basis of the collective effective dose 
    equivalent, incremental lifetime cancer risk associated with exposure 
    attributable to TPX operations are not expected to occur. A collective 
    effective dose equivalent of 24 person-rem per year represents 
    approximately .002% of the collective effective dose equivalent from 
    natural background radiation in the area (exclusive of radon). 
    Occupational doses to workers during TPX operations would result from 
    direct radiation and small releases of tritium and activated gases. 
    Operational procedures, administrative controls and monitoring would 
    ensure that occupational doses are kept below regulatory limits and as 
    low as reasonably achievable.
        Accidental releases of radioactive material could hypothetically 
    result from (a) Natural phenomena (e.g., earthquakes), (b) accidents 
    with external origin (e.g., airplane crashes), (c) shipping accidents 
    (i.e., accidents involving the transportation of radioactive material), 
    and (d) operational occurrences (e.g., tritium leaks). All TPX 
    confinement boundaries would be capable of maintaining integrity for 
    design basis natural phenomenon, and therefore a release due to a 
    natural phenomena event is extremely unlikely.
        Accidents with external origins and transportation accidents 
    involving small quantities of radioactive material would present little 
    risk to the public and the environment. Transportation accidents 
    involving larger quantities of radioactive material, form example 
    tritium, could occur; however, the accidental release of significant 
    quantities of radionuclides has a very low probability because of the 
    demonstrated integrity of the approved containers that would be used.
        TPX operational occurrences that could result in the accidental 
    release of tritium, activated gases, or solids consist primarily of 
    component failures and human error. Releases associated with these 
    occurrences would be limited by component inventories. The maximum 
    calculated individual dose from accident scenarios is 390 mrem, which 
    is well below the DOE siting guideline limit of 25 rem. Incremental 
    lifetime cancer risk associated with exposure resulting from the 
    collective doses would represent a negligible increase in the total 
    number of such health effects in the exposed population from all 
    natural background radiation doses. The largest potential radiological 
    impacts to the public from TPX accidents, including beyond design basis 
    accidents, are below regulatory limits.
        After TPX operation has ended, a proper NEPA review would be 
    conducted for the decontamination and decommissioning of the facility. 
    It is expected that the waste material resulting from decontamination 
    and decommissioning activities would qualify as low-level radioactive 
    waste and would be disposed of at an appropriate DOE waste disposal 
    facility.
        TFTR operations would be discontinued prior to TFTR decontamination 
    and decommissioning. Cumulative effects would be minor and would 
    represent a continuation of, rather than a change in, any impacts 
    (negative and positive) associated with TFTR operations. Commitment of 
    560 m\2\ (6,000 ft\2\) of land for the construction of the radioactive 
    waste storage building and 1,300 m\2\ (14,000 ft\2\) for construction 
    of a second storm water detention basin would represent a long-term 
    commitment of land use. Environmental releases of small amounts of 
    residual tritium during decontamination and decommissioning would not 
    add measurably to current low levels.
        No adverse long-term environmental effects are expected from normal 
    operations of the TPX. Tritium releases during normal operations would 
    not constitute a measurable contribution to background radiation 
    levels, because of the small amount of tritium to be released, its 
    relatively short half-life (12.3 years), and rapid dispersion in the 
    environment. There are currently no measurable cumulative impacts 
    occurring between PPPL and other facilities in the region, and none 
    would be expected for the proposed TPX. Releases of radionuclides to 
    the atmosphere by commercial operations (such as hospitals and research 
    laboratories) near PPPL are not detectable in environmental samples 
    collected around PPPL; analyses show no radionuclide concentrations 
    above background levels.
    
    Invitation To Comment
    
        DOE invites the public, including states which host DOE facilities 
    and any Indian tribe that might be affected by the proposed action, to 
    comment on this proposed FONSI. Please direct any comments to Dr. W.S. 
    White at the address presented in the previous section.
        In accordance with 40 CFR 1501.4(a)(2)(i) and 10 CFR 1021.322(d), 
    DOE is making this proposed FONSI available for public review for 30 
    days. Copies of the EA are available upon request at the address given 
    below. DOE will also make public comments received on this proposed 
    FONSI available to the public. The EA and other material pertaining to 
    this proposal are available for public review at the DOE public reading 
    rooms listed below.
    
    New Jersey, Princeton Plasma Physics Laboratory Library, James 
    Forrestal Campus, Route 1, Princeton, New Jersey 08542, (609) 243-3565.
    District of Columbia, U.S. Department of Energy, Freedom of Information 
    Reading Room, Forrestal Building, Room 1E-90, 1000 Independence Avenue, 
    SW, Washington, DC 20585, (202) 586-6020.
    
        For information on the availability of specific documents and hours 
    of operation, please contact reading rooms at the telephone numbers 
    provided.
    
    Proposed Determination
    
        Based on the analyses in the Environmental Assessment, the DOE 
    believes that the proposed action at the PPPL is not a major Federal 
    action significantly affecting the quality of the human environment 
    within the meaning of the NEPA, and that an environmental impact 
    statement is not required. DOE will make its final determination on 
    whether to issue a FONSI or prepare an environmental impact statement 
    after the 30-day public review period.
    
        Issued in Argonne, Illinois, this 21st day of September, 1994.
    John P. Kennedy,
    Assistant Manager for Safety and Technical Support, Chicago Operations 
    Office.
    [FR Doc. 94-24580 Filed 10-4-94; 8:45 am]
    BILLING CODE 6450-01-M
    
    
    

Document Information

Published:
10/05/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Action:
Proposed finding of no significant impact.
Document Number:
94-24580
Dates:
Comments on the proposed FONSI should be postmarked November 4, 1994, to ensure consideration. Comments postmarked after that date will be considered to the extent practicable.
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: October 5, 1994