[Federal Register Volume 59, Number 192 (Wednesday, October 5, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-24596]
[[Page Unknown]]
[Federal Register: October 5, 1994]
-----------------------------------------------------------------------
NUCLEAR REGULATORY COMMISSION
Availability of Draft Application Format and Content Guidance and
Review Plan and Acceptance Criteria for Non-Power Reactors
The U.S. Nuclear Regulatory Commission (NRC) is in the process of
developing for Non-Power Reactor (NPRs) a ``Format and Content for
Applications for the Licensing of Non-Power Reactors'' (F&C) and
``Standard Review Plan and Acceptance Criteria for Applications for the
Licensing of Non-Power Reactors'' (SRP). The NRC has made available
drafts of the document Introduction, Chapter 1, ``General Description
of the Facility,'' Chapter 6, ``Engineered Safety Features,'' Chapter
8, ``Electrical Power Systems,'' and Chapter 9, ``Auxiliary Systems,''
of the F&C and SRP documents for comment. Other draft chapters will be
made available for comment as they are completed.
Copies of these chapters have been placed in the NRC's Public
Document Room, the Gelman Building, 2120 L Street, NW., Washington, DC
20555. Single copies of these documents may be requested in writing
from Alexander Adams, JR., Senior Project Manager, U.S. Nuclear
Regulatory Commission, OWFN MS: 11-B-20, Washington, DC 20555. Comments
on these chapters should be sent by February 28, 1995, to the Director,
Non-Power Reactors and Decommissioning Project Directorate at the above
address.
Dated at Rockville, Maryland this 28th day of September, 1994.
For the Nuclear Regulatory Commission.
Seymour H. Weiss,
Director, Non-Power Reactors and Decommissioning Project Directorate,
Division of Operating Reactor Support, Office of Nuclear Reactor
Regulation.
[FR Doc. 94-24596 Filed 10-4-94; 8:45 am]
BILLING CODE 7590-01-M