[Federal Register Volume 60, Number 193 (Thursday, October 5, 1995)]
[Notices]
[Pages 52176-52177]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-24726]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Project Nos. 3442-021 et al.]
Hydroelectric Applications, [City of Nashua and Mine Falls Ltd
Partnership, et al.]; Notice of Applications
Take notice that the following hydroelectric applications have been
filed with the Commission and are available for public inspection:
1 a. Type of Application: Request Approval of Recreation Plan.
b. Project No: 3442-021.
c. Date Filed: July 3, 1995.
d. Applicant: City of Nashua and Mine Falls Ltd. Partnership.
e. Name of Project: Mine Falls Hydroelectric Project.
f. Location: Hillsborough Co., New Hampshire.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r)
h. Applicant Contact: Mr. A. J. Maggio, Manager, Field Services,
Energy Resources Group, 35 Industrial Park Drive, Dover, NH 03820,
(603) 742-0124.
i. FERC Contact: Jean Potvin, (202) 219-0022.
j. Comment Date: November 3, 1995.
k. Description of Project: Licensee requests approval of a
recreation plan which includes a signed vehicular access road down to
the reservoir boat ramp, a 60' x 100' parking area adjacent to the
reservoir boat ramp, and a scenic overlook.
l. This notice also consists of the following standard paragraphs:
B, C1, and D2.
2 a. Type of Application: Amendment of License.
b. Project No.: 10896-010.
c. Dated filed: April 3, 1995.
d. Applicant: City of Danville, VA.
e. Name of Project: Pinnacles.
f. Location: The project is located on the Dan River, in Patrick,
Henry, and Pittsylvania Counties, Virginia.
g. Filed pursuant to: Federal Power Act, 16 U.S.C. Sec. 791(a)-
825(r).
h. Applicant Contact: Duane S. Dahlquist, P.E., Director, Electric
Department, City of Danville, P.O. Box 3300, Danville, VA 24543, Phone:
(804) 799-5270, Fax : (804) 799-6583.
i. FERC Contact: Buu T. Nguyen, (202) 219-2913.
j. Comment Date: November 13, 1995.
k. Description of Amendment: The licensee, City of Danville, VA,
requested its license be amended to change the type of turbine (from
Pump-as Turbine to Francis) and to install an additional unit at the
base of Talbott Dam. The project's installed capacity will increase
from 10,425 kW to 10,670 kW, and the hydraulic capacity will increase
from 277 cfs to 310 cfs.
l. This notice also consists of the following standard paragraphs:
B, C1, and D2.
3 a. Type of Application: Surrender of Exemption.
b. Project No: 6162-002.
c. Date Filed: September 21, 1994.
d. Applicant: Hisanori Morimoto.
e. Name of Project: Tourin Musica Project.
f. Location: Crossett Brook, Washington County, Vermont.
g. Filed Pursuant to: Federal Power Act, 16 USC Section 791(a)-
825(r).
h. Applicant Contact: Hisanori Morimoto, Route 2, Box 1270,
Duxburg, VT 05676, (802) 244-8821.
i. FERC Contact: Hillary Berlin, (202) 219-0038.
j. Comment Date: November 13, 1995.
k. Description of Project: The project, originally built in 1918,
was rehabilitated in 1983. The project consists of a gravity dam, a
steel penstock, a powerhouse on the lower floor of a factory building,
and other related works. The exemptee states that the power plant has
been shut down due to a generator cable fire, and that it is not
economical to repair and operate the project.
l. The notice also consists of the following standard paragraphs:
B, C1, and D2.
4 a. Type of Application: Surrender of License.
b. Project No: 7174-023.
c. Date Filed: September 1, 1995.
d. Applicant: Truman Price, Inc.
e. Name of Project: Cottrell Project.
f. Location: McCloskey Creek, Skamania County, Washington.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Section 791(a)-
825(r).
h. Applicant Contact: Mary Price, 7019 MacArthur Boulevard,
Bethesda, MD 20816, (301) 224-2043.
i. FERC Contact: Hillary Berlin, (202) 219-0038.
j. Comment Date: November 13, 1995.
k. Description of Project: The licensee states that the project is
uneconomical to construct at this time. A permanent access road to the
planned project site was constructed in 1991. The road is and will
continue to be used by the Washington Department of Natural Resources
and the Longview Fibre Company.
l. The notice also consists of the following standard paragraphs:
B, C1, and D2.
5 a. Type of Application: Change of Land Rights to Permit Water
Withdrawal.
b. Project No.: 485-038.
c. Date Filed: July 21, 1995.
d. Applicant: Georgia Power Company.
e. Name of Project: Bartletts Ferry Project.
f. Location: The site is located in the Bartlett's Ferry Reservoir,
Layfield Tributary of the Chattahoochee River, Harris County, Georgia.
g. Filed pursuant to: Federal Power Act, 16 U.S.C. Sec. 791(a)-
825(r).
h. Applicant Contact: Mr. Larry J. Wall, Georgia Power Company,
Connector Building, 2nd Floor, 333 Piedmont Avenue, Atlanta, GA 30308,
(404) 526-2054.
i. FERC contact: John K. Hannula, (202) 219-0116.
j. Comment date: November 9, 1995.
k. Description of Application: The applicant proposes to permit an
increase of water withdrawal for an existing facility operated by
Harris County, Georgia. The applicant requests an increase from an
approved 2,131,200 gallons per day to 3,000,000 gallons per day. The
water withdrawal is for consumption.
l. This notice also consists of the following standard paragraphs:
B, C1, and D2.
[[Page 52177]]
Standard Paragraphs
B. Comments, Protests, or Motions to Intervene--Anyone may submit
comments, a protest, or a motion to intervene in accordance with the
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211,
.214. In determining the appropriate action to take, the Commission
will consider all protests or other comments filed, but only those who
file a motion to intervene in accordance with the Commission's Rules
may become a party to the proceeding. Any comments, protests, or
motions to intervene must be received on or before the specified
comment date for the particular application.
C1. Filing and Service of Responsive Documents--Any filings must
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS
FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as
applicable, and the Project Number of the particular application to
which the filing refers. Any of the above-named documents must be filed
by providing the original and the number of copies provided by the
Commission's regulations to: The Secretary, Federal Energy Regulatory
Commission, 825 North Capitol Street, N.E., Washington, D.C. 20426. A
copy of any motion to intervene must also be served upon each
representative of the Applicant specified in the particular
application.
D2. Agency Comments--Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives.
Dated: September 28, 1995, Washington, D.C.
Lois D. Cashell,
Secretary.
[FR Doc. 95-24726 Filed 10-4-95; 8:45 am]
BILLING CODE 6717-01-P