    Minnesota Power, Inc.; Notice of Minnesota Power, Inc's Request 
    for Waiver and To Use Alternative Procedures in Filing a License 
    Application
    
    September 29, 1998.
        On September 21, 1998, the existing licensee, Minnesota Power, Inc. 
    (Minnesota Power), filed a request to waive certain Commission 
    regulations and to use alternative procedures for submitting an 
    application for new license for the existing Blanchard Hydroelectric 
    Project No. 346. The project is located on the Mississippi River, in 
    Morrison County, Minnesota, and consists of 750-foot-long, 45-foot-high 
    concrete gravity dam with an integral powerhouse, and 1,152-acre 
    reservoir, three generating units with a total installed capacity of 18 
    MW, and appurtenant facilities.
        Minnesota Power has demonstrated that it has made an effort to 
    contact all resource agencies, nongovernmental organizations (NGOs), 
    and other affected by the proposal, and that a consensus exists that 
    the use of alternative procedures is appropriate in this case. Further, 
    waiving the Commission's regulations will be automatic upon approval of 
    the alternative procedures stipulated in Order No. 596.\1\
    ---------------------------------------------------------------------------
    
        \1\ Order No. 596, Regulations for the Licensing of 
    Hydroelectric Projects, 81 FERC para. 61,103 (1997).
    ---------------------------------------------------------------------------
    
        Minnesota Power has submitted a communications protocol that is 
    supported by the interested entities.
        The purpose of this notice is to invite any additional comments on 
    Minnesota Power's request to use the alternative procedures, pursuant 
    to Section 4.34(i) of the Commission's regulations. Additional notices 
    seeking comments on the specific project proposal, interventions and 
    protests, and recommended terms and conditions will be issued at a 
    later date.
        The alternative procedures being requested here combine the 
    prefiling consultation process with the environmental review process, 
    allowing Minnesota Power to complete and file an Environmental 
    Assessment (EA) in lieu of Exhibit E of the license application. This 
    differs from the traditional process, in which an applicant consults 
    with agencies, Indian tribes, and NGOs during preparation of the 
    application for the license and before filing it, but the Commission 
    staff performs the environmental review after the application is filed. 
    The alternative procedures are intended to simplify and expedite the 
    licensing process by combining the prefiling consultation and 
    environmental review processes into a single process, to facilitate 
    greater participation, and to improve communication and cooperation 
    among the participants.
    
    Applicant Prepared EA Process and Blanchard Project Schedule
    
        Minnesota Power has met with state and federal resource agencies, 
    and NGOs regarding the Blanchard Hydroelectric Project. Minnesota Power 
    has submitted a proposed schedule for the alternative procedures that 
    leads to the filing of a license application by August 2001.
    
    Comments
    
        Interested parties have 30 days from the date of this notice to 
    file with the Commission, any comments on Minnesota Power's proposal to 
    use the alternative procedures to file an application for the Blanchard 
    Hydroelectric Project.
    
    Filing Requirements
    
        The comments must be filed by providing an original and 8 copies as 
    required by the Commission's regulations to: Federal Energy Regulatory 
    Commission, Office of the Secretary, Dockets--Room 1A, 888 First 
    Street, N.E., Washington, DC 20426.
        All comment filings must bear the heading ``Comments on the 
    Alternative Procedures,'' and include the project name and number 
    (Blanchard Hydroelectric Project No. 346).
        For further information on this process,please call Tom Dean of the 
    Federal Energy Regulatory Commission at 202-219-2778.
    Linwood A. Watson, Jr.,
    Acting Secretary.
    [FR Doc. 98-26538 Filed 10-2-98; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
10/05/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-26538
Pages:
53404-53404 (1 pages)
Docket Numbers:
Project No. 346-MN