98-26564. Pathfinder Mines Corporation  

  • [Federal Register Volume 63, Number 192 (Monday, October 5, 1998)]
    [Notices]
    [Page 53468]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-26564]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket Number 40-2259]
    
    
    Pathfinder Mines Corporation
    
    AGENCY: U.S. Nuclear Regulatory Commission.
    
    ACTION: Amendment of source material license SUA-672 to change two 
    reclamation milestone dates.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory 
    Commission (NRC) has amended Pathfinder Mines Corporation's (PMC's) 
    Source Material License SUA-672 to change two reclamation milestone 
    dates. This amendment was requested by PMC in its letter dated July 23, 
    1998, and the receipt of the request by NRC was noticed in the Federal 
    Register on August 12, 1998.
        The license amendment modifies License Condition 61 to change 
    completion dates for two site-reclamation milestones. The new dates 
    approved by the NRC extend completion of placement of the final radon 
    barrier and placement of the erosion protection cover by three years 
    and three months. PMC attributes the delays to substantial settlement 
    still remaining to occur on the tailings system, before a final cover 
    can be placed. Based on the review of PMC's submittal, the NRC staff 
    concludes that the delays are attributable to factors beyond the 
    control of PMC, and the proposed work is scheduled to be completed as 
    expeditiously as practicable. Furthermore, because of the previous 
    placement of an interim cover over the Lucky Mc tailings impoundment 
    pursuant to License Condition 61A(2), and the ongoing radiation safety 
    and environmental monitoring programs, the staff concludes that a delay 
    in completion of placement of the final radon barrier cover and the 
    erosion protection cover will not result in any significant added risk 
    to the public health and safety and the environment.
        An environmental assessment is not required since this action is 
    categorically excluded under 10 CFR 51.22(c)(11), and an environmental 
    report from the licensee is not required by 10 CFR 51.60(b)(2).
    
    SUPPLEMENTARY INFORMATION: PMC's amended license, and the NRC staff's 
    technical evaluation of the amendment request are being made available 
    for public inspection at the Commission's Public Document Room at 2120 
    L Street, NW (Lower Level), Washington, DC 20555.
    
    FOR FURTHER INFORMATION CONTACT: Mohammad W. Haque, Uranium Recovery 
    Branch, Division of Waste Management, U.S. Nuclear Regulatory 
    Commission, Washington, DC 20555. Telephone (301) 415-6640.
    
        Dated at Rockville, Maryland, this 29th day of September, 1998.
    Joseph J. Holonich,
    Chief, Uranium Recovery Branch, Division of Waste Management, Office of 
    Nuclear Material Safety and Safeguards.
    [FR Doc. 98-26564 Filed 10-2-98; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
10/05/1998
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Amendment of source material license SUA-672 to change two reclamation milestone dates.
Document Number:
98-26564
Pages:
53468-53468 (1 pages)
Docket Numbers:
Docket Number 40-2259
PDF File:
98-26564.pdf