[Federal Register Volume 60, Number 194 (Friday, October 6, 1995)]
[Notices]
[Pages 52432-52433]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-24896]
=======================================================================
-----------------------------------------------------------------------
[[Page 52433]]
NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-387 and 50-388]
Pennsylvania Power and Light Company; Notice of Withdrawal of
Application for Amendment to Facility Operating Licenses
The U.S. Nuclear Regulatory Commission (the Commission) has granted
a request by Pennsylvania Power and Light Company (the licensee) to
withdraw its November 11, 1994 application for proposed amendment to
Facility Operating License Nos. NPF-14 and NPF-22, for Susquehanna
Steam Electric Station, Units 1 and 2, located in Luzerne County,
Pennsylvania.
The proposed amendment would have revised the Technical
Specifications (TS) to extend the main turbine valve surveillance test
interval from a weekly basis to no greater that 92 days for all main
turbine stop, control, and combined intermediate valves.
The Commission had previously issued a Notice of Consideration of
Issuance of Amendment published in the Federal Register on December 21,
1994 (59 FR 65821). However, by letter dated August 21, 1995, the
licensee withdrew the proposed change.
For further details with respect to this action, see (1) the
application for amendment dated November 11, 1994, and the licensee's
letter dated August 21, 1995, which withdrew the application for
license amendment. The above documents are available for public
inspection at the Commission's Public Document Room, the Gelman
Building, 2120 L Street, NW., Washington, DC, and at the local public
document room located at the Osterhout Free Library, Reference
Department, 71 South Franklin Street, Wilkes-Barre, Pennsylvania 18701.
Dated at Rockville, Maryland, this 2nd day of October 1995.
For the Nuclear Regulatory Commission.
Chester Poslusny,
Senior Project Manager, Project Directorate I-2, Division of Reactor
Projects--I/II, Office of Nuclear Reactor Regulation.
[FR Doc. 95-24896 Filed 10-5-95; 8:45 am]
BILLING CODE 7590-01-P