95-24927. Environmental Impact Statements and Regulations; Availability of EPA Comments  

  • [Federal Register Volume 60, Number 194 (Friday, October 6, 1995)]
    [Notices]
    [Pages 52393-52394]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-24927]
    
    
    
    -----------------------------------------------------------------------
    
    ENVIRONMENTAL PROTECTION AGENCY
    [ER-FRL-5229-5]
    
    
    Environmental Impact Statements and Regulations; Availability of 
    EPA Comments
    
        Availability of EPA comments prepared September 18, 1995 Through 
    September 22, 1995 pursuant to the Environmental Review Process (ERP), 
    under Section 309 of the Clean Air Act and Section 102(2)(c) of the 
    National Environmental Policy Act as amended. Requests for copies of 
    EPA comments can be directed to the Office of Federal Activities at 
    (202) 260-5076.
        An explanation of the ratings assigned to draft environmental 
    impact statements (EISs) was published in FR dated April 14, 1995 (60 
    FR 19047).
    
    Draft EISs
    
        ERP No. D-CGD-C50012-00 Rating EO2, Staten Island Bridges Program--
    Modernization and Capacity Enhancement Project, Construction and 
    Operation, Funding, Right-of-Way Grant, COE Section 404 Permit and 
    
    [[Page 52394]]
    NPDES Permit, Staten Island, NY and Elizabeth, NJ.
        Summary: EPA expressed environmental objections to the project 
    because of potential impacts to air quality and wetlands. EPA has also 
    expressed concerns regarding the proposed project's impact to cultural 
    resources. Accordingly, additional information must be provided in the 
    final EIS to address these issues.
        ERP No. D-DOE-J39022-00 Rating EC2, Programmatic EIS--Uranium Mill 
    Tailings Remedial Action Ground Water Project, Clean up of 24 Mill 
    Sites, Implementation.
        Summary: EPA concurred with the preferred alternative and requested 
    additional information be provided in the final EIS concerning passive 
    remediation, groundwater, site characterization data, local land use 
    authorities, pollution prevention and environmental justice.
        ERP No. D-SFW-J64005-CO Rating EC2, Rocky Mountain Arsenal National 
    Wildlife Refuge Establishment and Operation, Implementation, Adam 
    County, CO.
        Summary: EPA had environmental concerns about the lack of adequate 
    analysis of the environmental effects of developing a Refuge on a 
    hazardous waste site and the transition between Superfund site and 
    Refuge.
        ERP No. D-SFW-K99027-CA Rating LO, Stephens' Kangaroo Rat (SKR) 
    Authorization for Incidental Take and Implementation of a Long-Term 
    Habitat Conservation Plan, Western Riverside County, CA.
        Summary: EPA expressed a lack of objections with the proposal.
        ERP No. D-UAF-C11019-NY Rating EC2, Plattsburgh Air Force Base 
    (AFB) Disposal and Reuse, Implementation, Clinton County, NY.
        Summary: EPA expressed environmental concerns regarding the 
    proposed project's impacts to wetlands, surface water quality, noise 
    levels and indirect impacts. EPA requested additional information in 
    the final EIS to address these issues.
        ERP No. D-USN-G11030-TX Rating LO, Dallas Naval Air Station 
    Disposal and Reuse, Implementation, City of Dallas, TX.
        Summary: EPA had lack of environmental objections to this proposed 
    action.
        ERP No. DS-FHW-B40064-ME Rating EO2, Sears Island Marine Dry Cargo 
    Terminal and Access Road Construction, Updated and New Information 
    concerning the Evaluation of the Alternatives, Funding and COE Section 
    10 and 404 Permits Issuance, Waldo County, ME.
        Summary: EPA expressed environmental objections to the proposed 
    Sears Island dry cargo terminal, stating that the project would result 
    in significant adverse impact to freshwater and marine habitats. EPA 
    also determined that, as currently planned, the proposal terminal would 
    not fit on the environmentally preferable site at Mack Point. EPA 
    recommended that if the project were downsized or if the Sears Island 
    proposal ultimately proved infeasible for environmental or cost 
    reasons, the state should reconsider the Mack Point option. EPA has 
    committed to working with the state to evaluate measures to offset the 
    environmental impacts of the proposed project.
        ERP No. DS-UAF-B11012-NH Rating EC2, Pease Air Force Base Disposal 
    and Reuse, Updated Information, Implementation, Portsmouth, Newington, 
    Greenland, Rye, Dover, Durham, Madburg and Rochester, NH and Kittery, 
    Eliot and Berwicks, ME.
        Summary: EPA's primary environmental concern is that the Air Force 
    has not taken all reasonable steps to ensure that mitigation measures 
    necessary to protect wetlands and air quality will be implemented. EPA 
    urged the Air Force to incorporate into its ROD(s) firm commitments to 
    implement the mitigation measures recommended in the draft supplement 
    EIS.
    
    Final EISs
    
        ERP No. F-GSA-A80027-AZ Evo A. Deconcini Federal Building--United 
    States Courthouse, Construction and Site Selection, Central Business 
    Area (CBA), City of Tucson, Pima County, AZ.
        Summary: EPA had no objection to the action.
    
        Dated: October 3, 1995.
    William D. Dickerson,
    Director, NEPA Compliance Division, Office of Federal Activities.
    [FR Doc. 95-24927 Filed 10-5-95; 8:45 am]
    BILLING CODE 6560-50-U
    
    

Document Information

Published:
10/06/1995
Department:
Environmental Protection Agency
Entry Type:
Notice
Document Number:
95-24927
Pages:
52393-52394 (2 pages)
Docket Numbers:
ER-FRL-5229-5
PDF File:
95-24927.pdf