97-26368. Atlanta Gas Light Company; Notice of Application
[Federal Register Volume 62, Number 193 (Monday, October 6, 1997)]
[Notices]
[Page 52094]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 97-26368]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP97-772-000]
Atlanta Gas Light Company; Notice of Application
September 30, 1997.
Take notice that on September 25, 1997, Atlanta Gas Light Company
(Atlanta) 303 Peachtree Street, N.E.., Atlanta, Georgia 30308, filed in
Docket No. CP97-772-000 an application pursuant to Section 7(c) of the
Natural Gas Act (NGA) and Section 284.224 of the Commission's
Regulations, for a limited-jurisdiction blanket certificate of public
convenience and necessity authorizing Atlanta to transport natural gas
from time to time, all as more fully set forth in the application on
file with the Commission and open to public inspection.
Atlanta states that it has recently been approached by parties
seeking service this winter and prompt issuance of a blanket
certificate will facilitate Atlanta's ability to meet market demand on
a timely basis.\1\ Atlanta requests waiver of Section 284.224(c)(7),
stating that it is not proposing to establish rates at this time.
Atlanta indicates that after issuance of the blanket certificate, it
will petition the Commission for rate approval for individual
transactions in accordance with Section 284.123(b)(2).
---------------------------------------------------------------------------
\1\ Atlanta was found to be a Hinshaw pipeline exempt from the
Commission's jurisdiction under Section 1(c) by Commission order
issued December 21, 1955, in Docket No. G-9585. (14 FPC 1156)
---------------------------------------------------------------------------
Any person desiring to be heard or to make any protest with
reference to said application should on or before October 10, 1997,
file with the Federal Energy Regulatory Commission, Washington, D.C.
20426, a motion to intervene or a protest in accordance with the
requirements of the Commission's Rules of Practice and Procedure (18
CFR 385.214 or 385.211) and the Regulations under the Natural Gas Act
(18 CFR 157.10). All protests filed with the Commission will be
considered by it in determining the appropriate action to be taken but
will not serve to make the protestants parties to the proceeding. Any
person wishing to become a party to a proceeding or to participate as a
party in any hearing therein must file a motion to intervene in
accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to jurisdiction conferred upon the Federal Energy
Regulation Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no motion to intervene is filed within the time
required herein if the Commission on its own review of the matter finds
that a grant of the certificate is required by the public convenience
and necessity. If a motion for leave to intervene is timely filed or if
the Commission on its own motion believes that a formal hearing is
required, further notice of such hearing will be duly given.
Under the procedure herein provided for, unless otherwise advised,
it will be unnecessary for Atlanta to appear or be represented at the
hearing.
Lois D. Cashell,
Secretary.
[FR Doc. 97-26368 Filed 10-3-97; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/06/1997
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 97-26368
- Pages:
- 52094-52094 (1 pages)
- Docket Numbers:
- Docket No. CP97-772-000
- PDF File:
-
97-26368.pdf