2017-21618. North County Transit District's Request for Positive Train Control Safety Plan Approval and System Certification  

  • Start Preamble

    AGENCY:

    Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT).

    ACTION:

    Notice of availability and request for comments.

    SUMMARY:

    This document provides the public notice that North County Transit District (NCTD) submitted to FRA its Positive Train Control Safety Plan (PTCSP) Volume I-Main Body (Version 2.0) and Volume II-Appendices (Version 1.0), both dated September 1, 2017. NCTD asks FRA to approve its PTCSP and issue a Positive Train Control (PTC) System Certification for NCTD's Interoperable Electronic Train Management System (I-ETMS).

    DATES:

    FRA will consider communications received by November 6, 2017 before taking final action on the PTCSP. FRA may consider comments received after that date if practicable.

    ADDRESSES:

    All communications concerning this proceeding should identify Docket Number 2010-0049 and may be submitted by any of the following methods:Start Printed Page 46887

    • Web site: http://www.regulations.gov. Follow the online instructions for submitting comments.
    • Fax: 202-493-2251.
    • Mail: Docket Operations Facility, U.S. Department of Transportation, 1200 New Jersey Avenue SE., W12-140, Washington, DC 20590.
    • Hand Delivery: 1200 New Jersey Avenue SE., W12-140, Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal Holidays.
    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Dr. Mark Hartong, Senior Scientific Technical Advisor, at (202) 493-1332 or Mark.Hartong@dot.gov; or Mr. David Blackmore, Staff Director, Positive Train Control Division, at (312) 835-3903 or David.Blackmore@dot.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    In its PTCSP, NCTD asserts that the I-ETMS system it is implementing is designed as a vital overlay PTC system as defined in 49 CFR 236.1015(e)(2). The PTCSP describes NCTD's I-ETMS implementation and the associated I-ETMS safety processes, safety analyses, and test, validation, and verification processes used during the development of I-ETMS. The PTCSP also contains NCTD's operational and support requirements and procedures.

    NCTD's PTCSP and the accompanying request for approval and system certification are available for review online at www.regulations.gov (Docket Number FRA-2010-0049) and in person at DOT's Docket Operations Facility, 1200 New Jersey Avenue SE., W12-140, Washington, DC 20590. The Docket Operations Facility is open from 9 a.m. to 5 p.m., Monday through Friday, except Federal Holidays.

    Interested parties are invited to comment on the PTCSP by submitting written comments or data. During its review of the PTCSP, FRA will consider any comments or data submitted. However, FRA may elect not to respond to any particular comment and, under 49 CFR 236.1009(d)(3), FRA maintains the authority to approve or disapprove the PTCSP at its sole discretion. FRA does not anticipate scheduling a public hearing regarding NCTD's PTCSP because the circumstances do not appear to warrant a hearing. If any interested party desires an opportunity for oral comment, the party should notify FRA in writing before the end of the comment period and specify the basis for his or her request.

    Privacy Act Notice

    Anyone can search the electronic form of any written communications and comments received into any of our dockets by the name of the individual submitting the comment (or signing the document, if submitted on behalf of an association, business, labor union, etc.). In accordance with 49 CFR 211.3, FRA solicits comments from the public to better inform its decisions. DOT posts these comments, without edit, including any personal information the commenter provides, to www.regulations.gov,, as described in the system of records notice (DOT/ALL-14 FDMS), which can be reviewed at https://www.transportation.gov/​privacy. See https://www.regulations.gov/​privacyNotice for the privacy notice of regulations.gov.

    Start Signature

    Robert C. Lauby,

    Associate Administrator for Railroad Safety, Chief Safety Officer.

    End Signature End Supplemental Information

    [FR Doc. 2017-21618 Filed 10-5-17; 8:45 am]

    BILLING CODE 4910-06-P

Document Information

Published:
10/06/2017
Department:
Federal Railroad Administration
Entry Type:
Notice
Action:
Notice of availability and request for comments.
Document Number:
2017-21618
Dates:
FRA will consider communications received by November 6, 2017 before taking final action on the PTCSP. FRA may consider comments received after that date if practicable.
Pages:
46886-46887 (2 pages)
Docket Numbers:
Docket Number FRA-2010-0049
PDF File:
2017-21618.pdf
Supporting Documents:
» North County Transit District's Request for Positive Train Control Safety Plan Approval and System Certification
» .....
» Joint RFA to Railroads’ I-ETMS PTCSPs, Filed 5-26-2021
» North County Transit District (SDNX) 2018 Annual PTC Progress Report
» North County Transit District (SDNX) Q4 2018 PTC Progress Report
» U.S.DOT/FRA - Letter to NCTD re Self-reported Full Implementation
» North County Transit District (SDNX) Revenue Service Demonstration (RSD) Application, December 30, 2016
» North County Transit District (SDNX) Q1 2018 PTC Progress Report
» Notification of Delay in the Review of NCTD's PTCSP
» North County Transit District (SDNX) Q1 2017 PTC Progress Report