98-26831. Transcontinental Gas Pipe Line Corporation; Notice of Application
[Federal Register Volume 63, Number 194 (Wednesday, October 7, 1998)]
[Notices]
[Page 53890]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-26831]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP98-803-000]
Transcontinental Gas Pipe Line Corporation; Notice of Application
October 1, 1998.
Take notice that on September 25, 1998, Transcontinental Gas Pipe
Line Corporation (Transco), Post Office Box 1396, Houston, Texas 77251,
filed an application pursuant to Section 7(b) of the Natural Gas Act
(NGA) and the Commission's Regulations thereunder, for an order
permitting and approving the abandonment of storage service under Rate
Schedule LG-A provided to PG Energy, Inc. and Philadelphia Gas Works,
all as more fully set forth in the application on file with the
Commission and open to public inspection.
Any person desiring to be heard or to make any protest with
reference to said application should on or before October 22, 1998,
file with the Federal Energy Regulatory Commission, 888 First Street,
NE, Washington, DC 20426, a petition to intervene or a protest in
accordance with the requirements of the Commission's Rules of Practice
and Procedure (18 CFR 385.214 or 385.211) and the Regulations under the
Natural Gas Act (18 CFR 157.10). All protests filed with the Commission
will be considered by it in determining the appropriate action to be
taken but will not serve to make the protestants parties to the
proceeding. Any person wishing to become a party to a proceeding or to
participate as a party in any hearing therein must file a petition to
intervene in accordance with the Commission's Rules.
Take further notice that, pursuant to the authority contained in
and subject to the jurisdiction conferred upon the Federal Energy
Regulatory Commission by Sections 7 and 15 of the Natural Gas Act and
the Commission's Rules of Practice and Procedure, a hearing will be
held without further notice before the Commission or its designee on
this application if no petition to intervene is filed within the time
required herein, if the Commission on its own review of the matter
finds that a grant of the certificate is required by the public
convenience and necessity. If a petition for leave is timely filed, or
if the Commission on its own motion believes that a formal hearing is
required, further notice of such hearing will be duly given.
Under the procedure provided for, unless otherwise advised, it will
be unnecessary for Transco to appear or be represented at the hearing.
David P. Boergers,
Secretary.
[FR Doc. 98-26831 Filed 10-6-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/07/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-26831
- Pages:
- 53890-53890 (1 pages)
- Docket Numbers:
- Docket No. CP98-803-000
- PDF File:
-
98-26831.pdf