96-25689. Colorado Interstate Gas Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 196 (Tuesday, October 8, 1996)]
[Notices]
[Pages 52782-52783]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-25689]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-814-000]
Colorado Interstate Gas Company; Notice of Request Under Blanket
Authorization
October 2, 1996.
Take notice that on September 24, 1996, Colorado Interstate Gas
Company (CIG), Post Office Box 1087, Colorado Springs, Colorado 80944,
filed in Docket No. CP96-814-000 a request pursuant to Sections
157.205, 157.216 and 157.212 of the Commission's Regulations under the
Natural Gas Act (18 CFR 157.205, 157.216 and 157.212) for authorization
to abandon existing facilities and for authorization to install and
operate upgraded facilities, at the same location, in Pueblo County,
Colorado, to accommodate an existing customers increased growth. CIG
makes such request, under its blanket certificate issued in Docket No.
CP83-21-000 pursuant to Section 7 of the Natural Gas Act, all as more
fully set forth in the request on file with the Commission and open to
public inspection.
Specifically, CIG is proposing to abandon two 2-inch meters at the
existing Pueblo West delivery facilities and to install a new 4-inch
meter capable of increased deliverability to the Public Service Company
of Colorado (PSCo). CIG states the deliveries at the Pueblo West
delivery point will provide system supply to the Pueblo West area.
It is asserted that PSCo is currently entitled under existing
agreements to receive up to 985 Dt of natural gas per day at 175 psig,
and that the facility upgrade will permit CIG to deliver up to 3,700 Dt
of natural gas per day to PSCo at 275 psig. CIG further states that the
proposed increased volumes will be within PSCo's existing entitlements.
CIG estimates the proposed upgrade will cost approximately $18,000.
[[Page 52783]]
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 96-25689 Filed 10-7-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 10/08/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-25689
- Pages:
- 52782-52783 (2 pages)
- Docket Numbers:
- Docket No. CP96-814-000
- PDF File:
-
96-25689.pdf