2020-20790. Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, and Calumet-Saganashkee Channel, Chicago, IL  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of enforcement of regulation.

    SUMMARY:

    The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Chicago Sanitary and Ship Canal and South Branch of the Chicago River between mile marker 296 and mile marker 296.7 during specified times from September 25, 2020 through October 29, 2020. This action is necessary and intended to protect the safety of life and property on navigable waters prior to, during, and immediately after planned US Army Corps of Engineers work at the Electric Barrier. During the enforcement period listed below, entry into, transiting, or anchoring within the safety zone is prohibited unless authorized by the Captain of the Port Lake Michigan or a designated representative.

    DATES:

    The regulations in 33 CFR 165.930 will be enforced from 7 a.m. through 11 a.m. and 1 p.m. through 5 p.m. daily without actual notice from October 8, 2020 through 5 p.m. on October 29, 2020. For purposes of enforcement, actual notice will be used 7 a.m. through 11 a.m. and 1 p.m. through 5 p.m. daily from September 25, 2020 through October 8, 2020.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    If you have questions about this notice of enforcement, call or email LT Tiziana Garner, Waterways Management Division, Marine Safety Unit Chicago, at 630-986-2155, email address D09-DG-MSUChicago-Waterways@uscg.mil.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The Coast Guard will enforce a segment of the Safety Zone; Brandon Road Lock and Dam to Lake Michigan including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, Calumet-Saganashkee Channel on all waters of the Chicago Sanitary and Ship Canal and South Branch of the Chicago River between mile marker 296 and mile marker 296.7 during specified times from September 25, 2020 through October 29, 2020. This action is necessary and intended to protect the safety of life and property on navigable waters prior to, during, and immediately after planned US Army Corps of Engineers work at the Electric Barrier. During the enforcement period, entry into, transiting, or anchoring within the safety zone is prohibited unless authorized by the Captain of the Port Lake Michigan or a designated representative.

    This notice of enforcement is issued under the authority of 33 CFR 165.930 and 5 U.S.C. 552(a). In addition to this notice of enforcement in the Federal Register, the Coast Guard will provide notification of this enforcement period via Broadcast Notice to Mariners, Local Notice to Mariners, distribution in leaflet form, and on-scene oral notice. Additionally, the Captain of the Port Lake Michigan may notify representatives from the maritime industry through telephonic and email notifications. If the Captain of the Port or a designated representative determines that the regulated area need not be enforced for the full duration stated in this notice, he or she may use a Broadcast Notice to Mariners to grant general permission to enter the regulated area. The Captain of the Port Lake Michigan or a designated on-scene representative may be contacted via Channel 16 or at (414) 747-7182.

    Start Signature

    Dated: September 16, 2020.

    Donald P. Montoro,

    Captain, U.S. Coast Guard, Captain of the Port, Lake Michigan.

    End Signature End Supplemental Information

    [FR Doc. 2020-20790 Filed 10-7-20; 8:45 am]

    BILLING CODE 9110-04-P

Document Information

Published:
10/08/2020
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of enforcement of regulation.
Document Number:
2020-20790
Dates:
The regulations in 33 CFR 165.930 will be enforced from 7 a.m. through 11 a.m. and 1 p.m. through 5 p.m. daily without actual notice from October 8, 2020 through 5 p.m. on October 29, 2020. For purposes of enforcement, actual notice will be used 7 a.m. through 11 a.m. and 1 p.m. through 5 p.m. daily from September 25, 2020 through October 8, 2020.
Pages:
63447-63447 (1 pages)
Docket Numbers:
Docket No. USCG-2020-0579
PDF File:
2020-20790.pdf
Supporting Documents:
» Safety Zone, Brandon Road Lock and Dam to Lake Michigan Including Des Plaines River, Chicago Sanitary and Ship Canal, Chicago River, and Calumet-Saganashkee Channel, Chicago, IL
CFR: (1)
33 CFR 165